403.08 C. Report each day’s testing on a Quality Control Report, according to 446.04. Report all testing performed by the Contractor’s technician on the Quality Control Report. After startup adjustments, report any plant operation changes on the Quality Control Report. Ensure that each Quality Control Report contains technician comments as to production quality, input materials received, and condition and includes any other quality control activities required in the QCP. The Contractor’s technician must sign each Quality Control Report. Attach each day’s computerized plant printouts to that day’s report. The technician must note on the accompanying printout in which tonnage the quality control sample was taken with accompanying test results for asphalt binder content and percent passing the No. 4 (4.75 mm) sieve. Keep a copy of all Quality Control Reports for a project in the Contractor’s plant laboratory. The District will monitor according to 441.06, except notification for ceasing production does not have to be in writing. Additional samples may be obtained for Department test at any time. For Basic mixes, if the mean of the Lot or partial Lot acceptance tests for any sieve other than the No. 4 (4.75 mm) sieve exceeds the specification limits, the pay factor is determined as follows: TABLE 403.07-1 BASIC MIX PAY FACTORS Number of Tests 1 2 3 4 Pay Factor 0.98 0.97 0.96 0.95 For Item 448 mixes, the Department will perform acceptance sampling and testing according to 403.06 and 403.08, except the Lot size will be 5000 tons (5000 metric tons) with 1250 ton (1250 metric tons). Sublots and acceptance samples may be taken from the roadway or plant at the Districts discretion. Department testing under Unconditional Acceptance will receive a lower testing priority than other VA projects. 403.08 Acceptance Tables for 448 Mixes. A Lot is considered acceptable for gradation and asphalt binder content if the deviation of the mean from the JMF and the Range is no more than the tolerances shown in Table 403.08-1. TABLE 403.08-1 DEVIATION FROM THE JMF AND RANGE TOLERANCES[1] Mix Property Deviation from JMF (Percent) Asphalt Binder Content 0.3 1.0 1/2 inch (12.5 mm) sieve 6 15 No. 4 (4.75 mm) sieve 5 15 No. 8 (2.36 mm) sieve 4 15 [1] Based on mean of four Lot Acceptance tests. 196 Range (Percent) If the mean of the Lot acceptance tests for a particular sieve or sieves, or for asphalt binder content deviates from the JMF by more than the tolerances shown in
197 403.08 Table 403.08-1, but falls within the tolerances shown in Table 403.08-2, then the Lot is considered reasonably acceptable and may remain in place with payment at a reduced pay factor as show in Table 403.08-2. If the Range of the Lot acceptance tests for asphalt binder content or for any particular sieve, or sieves, exceeds the tolerance shown in Table 403.08-1, the Department will apply a pay factor of 0.95. TABLE 403.08-2 448 ACCEPTANCE SCHEDULE [1] Mix Property Asphalt Binder Content 1/2 inch (12.5 mm) sieve No. 4 (4.75 mm) sieve No. 8 (2.36 mm) sieve Pay 2 3 4 Factor Tests Tests Tests 1.00 0 to 0.47 0 to 0.36 0 to 0.30 0.98 0.48 to 0.54 0.37 to 0.42 0.31 to 0.35 0.90 0.55 to 0.61 0.43 to 0.48 0.36 to 0.40 0.80 0.62 to 0.68 0.49 to 0.54 0.41 to 0.45 0.60 0.69 to 0.75 0.55 to 0.59 0.46 to 0.50 [2] > 0.75 > 0.59 > 0.50 1.00 0 to 8.5 0 to 6.9 0 to 6.0 0.99 8.6 to 9.9 7.0 to 8.1 6.1 to 7.0 0.97 10.0 to 11.3 8.2 to 9.2 7.1 to 8.0 0.94 11.4 to 12.7 9.3 to 10.4 8.1 to 9.0 0.90 12.8 to 14.1 10.5 to 11.5 9.1 to 10.0 [3] > 14.1 > 11.5 > 10.0 1.00 0 to 7.1 0 to 5.8 0 to 5.0 0.99 7.2 to 8.5 5.9 to 6.9 5.1 to 6.0 0.97 8.6 to 9.9 7.0 to 8.1 6.1 to 7.0 0.94 10.0 to 11.3 8.2 to 9.2 7.1 to 8.0 0.90 11.4 to 12.7 9.3 to 10.4 8.1 to 9.0 [3] > 12.7 > 10.4 > 9.0 1.00 0 to 5.7 0 to 4.6 0 to 4.0 0.99 5.8 to 7.1 4.7 to 5.8 4.1 to 5.0 0.97 7.2 to 8.5 5.9 to 6.9 5.1 to 6.0 0.94 8.6 to 9.9 7.0 to 8.1 6.1 to 7.0 0.90 10.0 to 11.3 8.2 to 9.2 7.1 to 8.0 [3] > 11.3 > 9.2 > 8.0 [1] Based on mean of Lot Acceptance tests from the JMF. [2] Remove and replace material [3] Engineer will determine if the material may remain in place. Pay factor for material allowed to remain in place is 0.70.
- Page 151 and 152: 255.10 Basis of Payment 145 255.01
- Page 153 and 154: 147 255.07 Apply the liquid membran
- Page 155 and 156: 149 256.03 256.03 Equipment. Use a
- Page 157 and 158: 151 256.10 irrespective of the dept
- Page 159 and 160: 153 257.05 of the pavement is unifo
- Page 161 and 162: 155 258.03 the 1/2 -inch (12.5 mm)
- Page 163 and 164: 300 BASES ITEM 301 ASPHALT CONCRETE
- Page 165 and 166: 159 302.02 The Contractor may use r
- Page 167 and 168: 161 304.03 304.03 Before Spreading.
- Page 169 and 170: 163 304.08 Where variable depth is
- Page 171 and 172: 165 320.04 If using a resonant freq
- Page 173 and 174: 167 321.04 quality by cracking at l
- Page 175 and 176: 169 401.02 401.02 Mix Design and Qu
- Page 177 and 178: Asphalt Mix Application Heavy Traff
- Page 179 and 180: 173 401.05 Test blended RAP stockpi
- Page 181 and 182: 175 401.11 401.11 Hauling. Use truc
- Page 183 and 184: TABLE 401.13-3 PNEUMATIC TIRE ROLLE
- Page 185 and 186: 179 401.16 lighting at the beginnin
- Page 187 and 188: 401.18 Form hot longitudinal joints
- Page 189 and 190: TABLE 401.21 Aggregate lb/yd 3 (kg/
- Page 191 and 192: 185 402.06 402.06 Calibration. Cali
- Page 193 and 194: 187 403.01 project use on non-ODOT
- Page 195 and 196: 189 403.03 D. Copies of worksheets,
- Page 197 and 198: 191 403.06 A. Sampling. The Departm
- Page 199 and 200: 193 403.06 District lab on its own
- Page 201: 195 403.07 the acceptance. While wo
- Page 205 and 206: 199 407.06 407.06 Application of As
- Page 207 and 208: 201 408.08 rate of application, tem
- Page 209 and 210: 203 409.05 409.05 Basis of Payment.
- Page 211 and 212: ITEM 411 STABILIZED CRUSHED AGGREGA
- Page 213 and 214: 207 421.02 Ensure that the Binder h
- Page 215 and 216: A. Source of each individual materi
- Page 217 and 218: 211 421.10 If the microsurfacing is
- Page 219 and 220: Item Unit Description 421 Square Ya
- Page 221 and 222: 215 422.04 oversized material, revo
- Page 223 and 224: 422.09 Before rolling, correct defi
- Page 225 and 226: Reject aggregate that does not meet
- Page 227 and 228: 422 Square Yard Double Chip Seal (S
- Page 229 and 230: 223 423.08 or spalling. Do not seal
- Page 231 and 232: 225 424.04 submittal. For medium mi
- Page 233 and 234: 227 441.02 If the F/A ratio using t
- Page 235 and 236: TABLE 441.02-1 (CONTINUED) Course T
- Page 237 and 238: TABLE 441.02-1 (CONTINUED) Course T
- Page 239 and 240: 233 441.06 Limit adjustments of the
- Page 241 and 242: 235 441.09 When the F-T value is sp
- Page 243 and 244: 237 441.11 holding a Level 3 Asphal
- Page 245 and 246: TABLE 442.02-1 GYRATION LEVEL AND M
- Page 247 and 248: 241 442.06 442.06 Compaction. Cease
- Page 249 and 250: TABLE 443.03-2 MIX PROPERTIES 243 4
- Page 251 and 252: 2. Shot content (ASTM C612) Passing
403.08<br />
C. Report each day’s testing on a Quality Control Report, according to 446.04.<br />
Report all testing performed by the Contractor’s technician on the Quality Control<br />
Report. After startup adjustments, report any plant operation changes on the<br />
Quality Control Report. Ensure that each Quality Control Report contains<br />
technician comments as to production quality, input materials received, <strong>and</strong><br />
condition <strong>and</strong> includes any other quality control activities required in the QCP.<br />
The Contractor’s technician must sign each Quality Control Report. Attach each<br />
day’s computerized plant printouts to that day’s report. The technician must note<br />
on the accompanying printout in which tonnage the quality control sample was<br />
taken with accompanying test results for asphalt binder content <strong>and</strong> percent<br />
passing the No. 4 (4.75 mm) sieve. Keep a copy <strong>of</strong> all Quality Control Reports for<br />
a project in the Contractor’s plant laboratory.<br />
The District will monitor according to 441.06, except notification for ceasing<br />
production does not have to be in writing. Additional samples may be obtained for<br />
<strong>Department</strong> test at any time.<br />
For Basic mixes, if the mean <strong>of</strong> the Lot or partial Lot acceptance tests for any<br />
sieve other than the No. 4 (4.75 mm) sieve exceeds the specification limits, the pay<br />
factor is determined as follows:<br />
TABLE 403.07-1 BASIC MIX PAY FACTORS<br />
Number <strong>of</strong> Tests 1 2 3 4<br />
Pay Factor 0.98 0.97 0.96 0.95<br />
For Item 448 mixes, the <strong>Department</strong> will perform acceptance sampling <strong>and</strong><br />
testing according to 403.06 <strong>and</strong> 403.08, except the Lot size will be 5000 tons<br />
(5000 metric tons) with 1250 ton (1250 metric tons). Sublots <strong>and</strong> acceptance<br />
samples may be taken from the roadway or plant at the Districts discretion.<br />
<strong>Department</strong> testing under Unconditional Acceptance will receive a lower testing<br />
priority than other VA projects.<br />
403.08 Acceptance Tables for 448 Mixes. A Lot is considered acceptable for<br />
gradation <strong>and</strong> asphalt binder content if the deviation <strong>of</strong> the mean from the JMF <strong>and</strong><br />
the Range is no more than the tolerances shown in Table 403.08-1.<br />
TABLE 403.08-1 DEVIATION FROM THE JMF AND RANGE<br />
TOLERANCES[1]<br />
Mix Property<br />
Deviation<br />
from JMF<br />
(Percent)<br />
Asphalt Binder Content 0.3 1.0<br />
1/2 inch (12.5 mm) sieve 6 15<br />
No. 4 (4.75 mm) sieve 5 15<br />
No. 8 (2.36 mm) sieve 4 15<br />
[1] Based on mean <strong>of</strong> four Lot Acceptance tests.<br />
196<br />
Range<br />
(Percent)<br />
If the mean <strong>of</strong> the Lot acceptance tests for a particular sieve or sieves, or for<br />
asphalt binder content deviates from the JMF by more than the tolerances shown in