256.01<br />

The <strong>Department</strong> will not pay for additional concrete sawing <strong>and</strong> removal depths<br />

within 1 inch (25 mm) greater than those shown on the plans.<br />

The <strong>Department</strong> will not pay for additional work to repair damage caused by<br />

pavement sawing or pavement removal.<br />

The <strong>Department</strong> will include tack coat in the cost <strong>of</strong> the asphalt concrete. The<br />

<strong>Department</strong> will pay for asphalt concrete according to Item 301 or Item 448.<br />

The <strong>Department</strong> will pay for accepted quantities at the contract prices as<br />

follows:<br />

Item Unit Description<br />

255 Square Yard Full Depth Pavement Removal<br />

(Square Meter) <strong>and</strong> Rigid Replacement, Class ___<br />

255 Foot (Meter) Full Depth Pavement Sawing<br />

ITEM 256 BONDED PATCHING OF PORTLAND CEMENT<br />

CONCRETE PAVEMENT<br />

256.01 Description<br />

256.02 <strong>Material</strong>s<br />

256.03 Equipment<br />

256.04 Removal <strong>of</strong> Unsound Concrete<br />

256.05 Preparation <strong>of</strong> Patch Area<br />

256.06 Bonding Grout Installation<br />

256.07 Placing Patching <strong>Material</strong><br />

256.08 Curing <strong>and</strong> Loading<br />

256.09 Method <strong>of</strong> Measurement<br />

256.10 Basis <strong>of</strong> Payment<br />

256.01 Description. This work consists <strong>of</strong> bonded patching <strong>of</strong> portl<strong>and</strong><br />

cement concrete pavements at spall areas adjacent to cracks or joints or other areas<br />

<strong>of</strong> the pavement as designated by the Engineer. This work involves removing all<br />

loose <strong>and</strong> unsound concrete <strong>and</strong> asphalt material patches; removing sound concrete<br />

as directed; preparing the surface; applying a bonding grout if required;<br />

reconstructing the joint or crack; <strong>and</strong> mixing, placing, finishing, <strong>and</strong> curing <strong>of</strong> the<br />

patching material called out in the pay item description.<br />

256.02 <strong>Material</strong>s. Furnish materials conforming to:<br />

Portl<strong>and</strong> cement ...................................................... 701.05<br />

Fine aggregate ........................................................ 703.02<br />

Coarse aggregate, No. 8 size .................................. 703.02<br />

Curing material....................................................... 705.07<br />

Air-entraining admixture ........................................ 705.10<br />

Quick setting concrete mortar ................................ 705.21<br />