208.22<br />

incidental to the other work items in the Contract requiring blasting. The<br />

<strong>Department</strong> will pay for additional excavation volume resulting from the 2-foot<br />

(0.6 m) <strong>of</strong>fsets at the Contract unit price for Item 203 Excavation. The <strong>Department</strong><br />

will pay for the removal <strong>of</strong> this material beyond the excavation limits under<br />

109.05.<br />

The <strong>Department</strong> will pay lump sum for all work for the Pre-Blast Condition<br />

Survey, Blasting Consultant, Airblast <strong>and</strong> Noise Control, Vibration Control <strong>and</strong><br />

Monitoring, <strong>and</strong> Hydrologist. The same person or consultant may perform the preblast<br />

survey, vibration control <strong>and</strong> monitoring, airblast <strong>and</strong> noise control, <strong>and</strong> the<br />

work required <strong>of</strong> the hydrologists. The <strong>Department</strong> may make intermediate<br />

payments based on the percentage <strong>of</strong> the work completed for Pre-Blast Condition<br />

Survey, Blasting Consultant, Airblast <strong>and</strong> Noise Control, Vibration Control <strong>and</strong><br />

Monitoring, or Hydrologist.<br />

Payment for guide holes is incidental to Presplitting. Payment for all <strong>of</strong><br />

controlled blasting is included in the payment for Presplitting.<br />

The <strong>Department</strong> will pay for stabilization under 109.05 if caused by geology.<br />

The <strong>Department</strong> will not pay for stabilization if caused by the Contractor’s blasting<br />

operations.<br />

The <strong>Department</strong> will pay for the placement <strong>and</strong> monitoring <strong>of</strong> piezometers<br />

according to 109.05.<br />

The <strong>Department</strong> will pay for accepted quantities at the contract prices as<br />

follows:<br />

Item Unit Description<br />

208 Square Yard Presplitting<br />

(Square Meter)<br />

208 Lump Sum Pre-Blast Condition Survey<br />

208 Lump Sum Blasting Consultant<br />

208 Lump Sum Airblast <strong>and</strong> Noise Control<br />

208 Lump Sum Vibration Control <strong>and</strong> Monitoring<br />

208 Lump Sum Hydrologist<br />

ITEM 209 LINEAR GRADING<br />

209.01 Description<br />

209.02 <strong>Material</strong>s<br />

209.03 <strong>Construction</strong> Requirements<br />

209.04 Ditch Cleanout<br />

209.05 Reshaping Under Guardrail<br />

209.06 Preparing Subgrade for Shoulder Paving<br />

209.07 Grading Tolerances<br />

209.08 Method <strong>of</strong> Measurement<br />

209.09 Basis <strong>of</strong> Payment<br />