135<br />

208.21<br />

B. Report <strong>of</strong> Loss. If a loss or theft <strong>of</strong> explosives occur, report all<br />

circumstances <strong>and</strong> details <strong>of</strong> the loss or theft immediately to the nearest Bureau <strong>of</strong><br />

Alcohol, Tobacco <strong>and</strong> Firearms, as well as to the local law enforcement authorities<br />

<strong>and</strong> the Engineer.<br />

C. Daily Drilling <strong>and</strong> Blasting Logs. On a weekly basis, provide a daily log <strong>of</strong><br />

the drilling <strong>and</strong> blasting operations. Update the log at the close <strong>of</strong> each business<br />

day.<br />

Fill out the <strong>Department</strong> or blaster’s drilling form to document the following:<br />

burden, spacing, bench height, hole depth <strong>and</strong> diameter, <strong>and</strong> subdrill depth.<br />

Document additional information about the drilling such as voids, mud seams, air<br />

pressure loss <strong>and</strong> lack <strong>of</strong> cuttings. The driller shall give this form to the blaster<br />

<strong>and</strong> the <strong>Department</strong>.<br />

Document on the blasting log the number <strong>of</strong> blasts, times <strong>and</strong> dates <strong>of</strong> blasts,<br />

the blasting locations <strong>and</strong> patterns, <strong>and</strong> all <strong>of</strong> the following information:<br />

1. Station limits <strong>of</strong> the shot.<br />

2. Plan <strong>and</strong> section views <strong>of</strong> drill pattern including free face, burden, blast<br />

hole spacing, blast hole diameters, blast hole angles, lift height, <strong>and</strong> subdrill depth.<br />

3. Loading diagram showing type <strong>and</strong> amount <strong>of</strong> explosive, primers, <strong>and</strong><br />

initiators <strong>and</strong> location <strong>and</strong> depth <strong>of</strong> stemming.<br />

4. Initiators sequence <strong>of</strong> blast holes including delay times <strong>and</strong> delay<br />

system in each blast hole.<br />

5. Trade names <strong>and</strong> sizes <strong>of</strong> all explosives, primers, <strong>and</strong> initiators to be<br />

employed.<br />

6. Signature <strong>of</strong> the blaster in charge.<br />

7. Use the blaster’s blasting form or the Blasting Report form in FHWA<br />

Publication FHWA-HI-92-001 Rock Blasting <strong>and</strong> Overbreak Control. Adapt these<br />

forms to meet the project requirements.<br />

The drilling <strong>and</strong> blasting logs are for quality control, informational, <strong>and</strong><br />

record keeping purposes. Review <strong>of</strong> the blast log by the Engineer does not relieve<br />

the Contractor <strong>of</strong> responsibility for the accuracy <strong>and</strong> adequacy <strong>of</strong> the drilling <strong>and</strong><br />

blasting log.<br />

D. Video Recording <strong>of</strong> Blasts. Record video <strong>of</strong> each blast. Index the<br />

recordings in a manner that permits easy <strong>and</strong> correct identification <strong>of</strong> each blast.<br />

Submit copies <strong>of</strong> the blast recordings on a weekly basis. If submitting the video<br />

recordings as electronic data files, furnish them in a video format acceptable to the<br />

Engineer <strong>and</strong> capable <strong>of</strong> being viewed on the <strong>Department</strong>’s computers.<br />

208.21 Method <strong>of</strong> Measurement. The <strong>Department</strong> will measure Presplitting<br />

by the number <strong>of</strong> square yards (square meters) along the slope face <strong>of</strong> the cut. The<br />

horizontal measurement will begin at the first hole <strong>and</strong> end at the last hole <strong>of</strong> the<br />

cut, <strong>and</strong> the vertical slope measurement will be along the sloped drill hole.<br />

208.22 Basis <strong>of</strong> Payment. The <strong>Department</strong> will not make separate payment<br />

for the production blasting operations. Payment for the production blasting is