208.16<br />

1. Identification <strong>of</strong> instrument used.<br />

2. Name <strong>of</strong> approved observer <strong>and</strong> interpreter.<br />

3. Distance <strong>and</strong> direction <strong>of</strong> recording station from blast area.<br />

4. Type <strong>of</strong> ground at recording station <strong>and</strong> material on which the<br />

instrument is sitting.<br />

D. Ensure that the peak particle velocity <strong>of</strong> each component <strong>of</strong> the safe limits <strong>of</strong><br />

the nearest structure subject to vibration damage is not exceeded.<br />

E. The vibration specialist may elect to summarize <strong>and</strong> report this information<br />

monthly, when the blaster measures the vibration <strong>and</strong> airblast with its own<br />

seismograph <strong>and</strong> reports the measurements on the vibration specialist’s<br />

seismographs.<br />

F. Establish what vibration limits are being used <strong>and</strong> explain why they are being<br />

used to the Engineer before blasting begins near structures denoted in the pre-blast<br />

survey in 208.14.<br />

G. Stop all operations if the vibration limits are exceeded until the vibration<br />

specialist reports to the Engineer that no damage has occurred or will occur <strong>and</strong><br />

that corrective action has been taken to lower the vibration.<br />

208.16 Airblast <strong>and</strong> Noise Control. If specified in the Contract, install an<br />

airblast monitoring system between the main blasting area <strong>and</strong> the nearest structure<br />

subject to blast damage or annoyance.<br />

Retain an experienced airblast <strong>and</strong> noise control specialist. Use an airblast <strong>and</strong><br />

noise control specialist with at least 5 years <strong>of</strong> proven experience in airblast <strong>and</strong><br />

noise control on heavy construction highway rock blasting projects <strong>and</strong> with a<br />

sufficient amount <strong>of</strong> proven experience <strong>of</strong> the type <strong>of</strong> rock blasting airblast <strong>and</strong><br />

noise control monitoring required by the Contract. Use an airblast <strong>and</strong> noise<br />

control specialist that is an expert in airblast <strong>and</strong> noise control. The Contractor<br />

shall not use an airblast <strong>and</strong> noise control specialist that is an employee <strong>of</strong> the<br />

Contractor, explosives manufacturer, or explosives distributor.<br />

Before or at the preconstruction conference, submit a resume <strong>of</strong> the credentials<br />

<strong>of</strong> the proposed airblast <strong>and</strong> noise control specialist. Include in the resume a list <strong>of</strong><br />

at least five heavy construction or highway rock blasting projects on which the<br />

airblast <strong>and</strong> noise control specialist was responsibly in charge <strong>of</strong> the airblast <strong>and</strong><br />

noise control <strong>of</strong> the rock blasting operations. List a description <strong>of</strong> the projects,<br />

with details <strong>of</strong> the airblast <strong>and</strong> noise control monitoring made on the project. List<br />

the names <strong>and</strong> telephone numbers <strong>of</strong> project owners with sufficient knowledge <strong>of</strong><br />

the projects to verify the submitted information. Obtain approval <strong>of</strong> the airblast<br />

<strong>and</strong> noise control specialist before beginning any drilling <strong>and</strong> blasting work.<br />

Allow 30 days for the review <strong>of</strong> this documentation.<br />

The airblast <strong>and</strong> noise control specialist shall perform the following:<br />

A. Use equipment <strong>of</strong> the type specifically manufactured for the purpose to make<br />

the airblast measurements. Hold peak overpressure below 134 dB at the nearest<br />

structure or other designated location. Lower the overpressure limit if it proves too<br />

high based on damage or complaints.<br />

132