129<br />

208.10<br />

S. Use the same diameter <strong>and</strong> drilled in the same plane <strong>and</strong> to the same<br />

tolerance as the presplit holes when using unloaded <strong>and</strong> unstemmed guide holes<br />

between presplit holes.<br />

T. Detonate the presplit line before detonating any production holes, except<br />

when the closest horizontal distance between the production line <strong>and</strong> presplit line<br />

is greater than 50 feet (16 m).<br />

208.10 Cushion (Trim) Blasting. If the horizontal distance from the cut face<br />

to the existing rock face is less than 15 feet (4.5 m), the Contractor may use<br />

cushion blasting instead <strong>of</strong> presplitting. Perform cushion blasting according to<br />

208.09, except as follows:<br />

A. Detonate along the cut face after the detonation <strong>of</strong> all production holes.<br />

B. Between the trim line <strong>and</strong> the nearest production row, use a difference in<br />

delay time <strong>of</strong> 25 to 75 milliseconds.<br />

208.11 Sliver Cuts. For sliver cuts, pioneering the top <strong>of</strong> cuts <strong>and</strong> preparing a<br />

working platform to begin the controlled blasting <strong>and</strong> drilling operations may<br />

require unusual working methods <strong>and</strong> use <strong>of</strong> equipment. Use angle drilled holes or<br />

fan drilled holes during the initial pioneering operations to obtain the desired rock<br />

face. Apply the hole diameter requirements for controlled blasting for pioneering<br />

work. Do not exceed a hole spacing <strong>of</strong> 36 inches (900 mm).<br />

208.12 Blaster. Use an experienced blaster in charge <strong>of</strong> all blasting<br />

operations. Use a blaster with at least 5 years <strong>of</strong> proven experience in heavy<br />

construction or highway rock blasting <strong>and</strong> with a sufficient amount <strong>of</strong> proven<br />

experience <strong>of</strong> the type <strong>of</strong> highway rock blasting required by the Contract.<br />

Before or at the preconstruction conference, submit a resume <strong>of</strong> the credentials<br />

<strong>of</strong> the proposed blaster. Include in the resume a list <strong>of</strong> at least five heavy<br />

construction or highway rock blasting projects on which the blaster was<br />

responsibly in charge <strong>of</strong> the rock blasting. List a description <strong>of</strong> the projects, with<br />

details <strong>of</strong> the blasting operations. List the names <strong>and</strong> telephone numbers <strong>of</strong> project<br />

owners with sufficient knowledge <strong>of</strong> the projects to verify the submitted<br />

information. Obtain approval <strong>of</strong> the blaster before beginning any drilling <strong>and</strong><br />

blasting work. Allow 30 days for the review <strong>of</strong> this documentation. The blaster<br />

shall perform the following:<br />

A. Control the ground vibrations by the use <strong>of</strong> properly designed delay<br />

sequences <strong>and</strong> by using allowable charge weights per delay.<br />

B. Base the allowable charge weights per delay on vibration levels that will not<br />

cause damage.<br />

C. Establish the allowable charge weights per delay by carrying out trial blasts<br />

<strong>and</strong> measuring the vibration levels.<br />

D. Independently measure the vibrations <strong>and</strong> airblast at the closest structure<br />

using the criteria <strong>and</strong> limits set in 208.15 <strong>and</strong> 208.16. Ensure that only trained <strong>and</strong><br />

certified personnel set up the seismographs.