125<br />

208.07<br />

E. Maintain a stemming depth <strong>of</strong> at least 0.7 times the burden distance. If water<br />

is present or when blasting within 200 feet (61 m) <strong>of</strong> a structure, use crushed No. 8<br />

coarse aggregate for holes less than 4 inches (100 mm) in diameter <strong>and</strong> crushed<br />

No. 57 coarse aggregate for holes 4 inches (100 mm) in diameter <strong>and</strong> larger for the<br />

stemming material. Use the coarse aggregate gradations <strong>of</strong> Nos. 8 <strong>and</strong> 57<br />

gradations on Table 703.01-1. If gravel is used, use crushed material with a<br />

minimum <strong>of</strong> two mechanically fractured faces on 60 percent <strong>of</strong> the material. In<br />

other locations, the Contractor may use drill cuttings for stemming, if it does not<br />

compromise the shot integrity.<br />

F. Take all necessary precautions in the production blasting to minimize blast<br />

damage to the rock backslope.<br />

G. Drill a line <strong>of</strong> buffer holes on a parallel plane adjacent to the presplit holes if<br />

presplit results are not satisfactory <strong>and</strong> production holes are damaging the presplit<br />

line. Drill the buffer hole 3 ± 1 inch (75 ± 25 mm) in diameter. Drill the line <strong>of</strong><br />

buffer holes approximately 3 feet (1 m) from the presplit line, <strong>and</strong> space 3 to 5 feet<br />

(1 to 1.5 m) center-to-center. Do not load the buffer holes with more than 50<br />

percent <strong>of</strong> the full explosive load that could be placed in a 3-inch (75 mm)<br />

production hole. Delay the detonation sequence toward a free face.<br />

208.07 Blasting Test Sections. Before commencing full-scale blasting<br />

operations, demonstrate the adequacy <strong>of</strong> the proposed Blasting Plan. Drill, blast,<br />

<strong>and</strong> excavate short test sections to determine which combination <strong>of</strong> methods, hole<br />

spacing, <strong>and</strong> charge works best. Use a test section with lengths up to 150 feet (45<br />

m) for presplitting <strong>and</strong> 120 feet (36 m) for production blasting when field<br />

conditions warrant.<br />

Do not exceed a production hole depth <strong>of</strong> 30 feet (9 m) for the first test section.<br />

Begin the controlled blasting tests for presplitting with the controlled blast holes<br />

spaced 36 inches (900 mm) apart, then adjust, if needed, until the spacing for fullscale<br />

presplit blasting operations is approved. A new test section is required to<br />

increase the spacing for the presplitting to a maximum <strong>of</strong> 48 inches (1200 mm).<br />

Perform two test sections per project. Use explosive depths greater than 20 feet<br />

(6.7 m) for these test sections. Use one test section for controlled blasting <strong>and</strong> one<br />

test section for production blasting.<br />

Apply the requirements specified for controlled <strong>and</strong> production blasting<br />

operations to the test section blasting.<br />

For controlled blasting <strong>and</strong> for production blasts within 10 feet (3 m) <strong>of</strong> the<br />

finished slope, do not drill ahead <strong>of</strong> the test shot area until the test section has been<br />

excavated <strong>and</strong> the results evaluated. If the test shots are unsatisfactory, revise<br />

methods as necessary to achieve the required results. Unsatisfactory test shot<br />

results include an excessive amount <strong>of</strong> fragmentation beyond the indicated lines<br />

<strong>and</strong> grade, excessive flyrock, or violation <strong>of</strong> other requirements within Item 208.<br />

If the drilling <strong>and</strong> blasting methods do not produce the desired result <strong>of</strong> a<br />

uniform slope <strong>and</strong> shear face, within the tolerances specified, drill, blast, <strong>and</strong><br />

excavate short sections, not exceeding 150 feet (45 m) in length for a presplit line