05.01.2013 Views

CCNA Cisco Certified Network Associate Study Guide - FTP Server

CCNA Cisco Certified Network Associate Study Guide - FTP Server

CCNA Cisco Certified Network Associate Study Guide - FTP Server

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

502 Chapter 10 � Wide Area <strong>Network</strong>ing Protocols<br />

Invalid Information ID 0 Invalid Report IE Len 0<br />

Invalid Report Request 0 Invalid Keep IE Len 0<br />

Num Status Enq. Sent 0 Num Status msgs Rcvd 0<br />

Num Update Status Rcvd 0 Num Status Timeouts 0<br />

Router#<br />

The router output from the show frame-relay lmi command shows you<br />

LMI errors as well as the LMI type.<br />

Show Frame-Relay Pvc<br />

The show frame pvc command will list all configured PVCs and DLCI numbers.<br />

It provides the status of each PVC connection and traffic statistics. It<br />

will also give you the number of BECN and FECN packets received on the<br />

router.<br />

RouterA#sho frame pvc<br />

PVC Statistics for interface Serial0 (Frame Relay DTE)<br />

DLCI = 16,DLCI USAGE = LOCAL,PVC STATUS =ACTIVE,INTERFACE<br />

= Serial0.1<br />

input pkts 50977876 output pkts 41822892 in bytes<br />

3137403144<br />

out bytes 3408047602 dropped pkts 5 in FECN pkts 0<br />

in BECN pkts 0 out FECN pkts 0 out BECN pkts 0<br />

in DE pkts 9393 out DE pkts 0<br />

pvc create time 7w3d, last time pvc status changed 7w3d<br />

DLCI = 18,DLCI USAGE =LOCAL,PVC STATUS =ACTIVE,INTERFACE =<br />

Serial0.3<br />

input pkts 30572401 output pkts 31139837 in bytes<br />

1797291100<br />

out bytes 3227181474 dropped pkts 5 in FECN pkts 0<br />

in BECN pkts 0 out FECN pkts 0 out BECN pkts 0<br />

in DE pkts 28 out DE pkts 0<br />

pvc create time 7w3d, last time pvc status changed 7w3d

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!