23.09.2012 Views

PROD UCTIVITY - Leobersdorfer Maschinenfabrik GmbH & Co.KG

PROD UCTIVITY - Leobersdorfer Maschinenfabrik GmbH & Co.KG

PROD UCTIVITY - Leobersdorfer Maschinenfabrik GmbH & Co.KG

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HIGH STANDARDS IN MANUFACTURING &<br />

QUALITY ASSURANCE<br />

In order to meet our own and our customer<br />

high quality requirements, we invest in modern,<br />

computer-controlled machinery, in appliances<br />

and tools, in electric testing systems, in CAD<br />

equipment, etc. Just as much attention is paid<br />

to training, continous education and motivation<br />

of our employees, both blue and white collar<br />

workers. A high percentage of the latter have<br />

completed a college education or have graduated<br />

as engineers.<br />

COMPRESSOR ASSEMBLY<br />

The compressor itself, cabling, terminal boxes<br />

and operator panels are all mounted on a<br />

single skid. The control systems can either be<br />

mounted on the compressor frame or installed<br />

in separate, stand-alone cabinets, depending<br />

on the requirements of the customer.<br />

ASSEMBLY of oil-free EcoPET<br />

compressors for PET applications<br />

YOUR HIGH PRESSURE SOLUTION<br />

COMPRESSOR CONTROL SYSTEMS<br />

Our sophisticated electronic control systems<br />

are designed and maintained by a team of highly<br />

qualified electrical engineers using CAD systems<br />

and other computer-based programs. More than<br />

60% of all LMF compressors are equipped with<br />

such systems, which include programmable<br />

logic controls, display panels, annunciators and<br />

overall pressure control logic. Also telephone<br />

modems and IP interfaces are supplied on request<br />

in order to facilitate service activities all<br />

over the world.<br />

ASSEMBLY<br />

LMF assembles the compressor units in its wellequipped<br />

assembly-shop. The assembly follows<br />

the high level LMF quality assurance standards.<br />

TESTING<br />

Every compressor unit is tested in our own testing<br />

area during a four-hour mechanical test-run or under<br />

full load conditions according to contractual specifications<br />

and the relevant international standards,<br />

such as ISO, ASME, DNV, BV, LRS, GL, etc.<br />

INCLINED-BED MODELS OF CNC<br />

HIGH POWER LATHES<br />

YOUR BEST COMFORT<br />

ISO 9001:2000<br />

LMF is certified in accordance with ISO 9001:2000<br />

requirements by Det Norske Veritas.<br />

A management system for HSE is implemented<br />

according EN ISO 14001 and OHSAS 18001<br />

(within the production facility in Austria).<br />

.29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!