82<br />

82<br />

Customers electing to install conduit for additional<br />

protection for direct buried cable will be required to meet all direct<br />

buried trench requirements unless the conduit used meets the<br />

<strong>Company</strong>'s conduit specifications for a continuous<br />

conduit system.<br />

912. BURIAL DEPTHS<br />

A minimum ground cover of 30 inches for cable<br />

operating above 600 volts phase to phase and 24 inches when<br />

operating at or below 600 volts phase to phase shall be provided.<br />

(Refer to Illustrations<br />

No.s 18, 19 and 20 in Section XII).<br />

Galvanized steel conduit or heavy-wall, non-metallic<br />

conduit (Schedule 40 or 80) shall be used under public streets<br />

or<br />

ways, paved areas, driveways and all transmission rights-of-way.<br />

It shall be placed at least 36 inches below grade and shall extend<br />

at least four feet beyond street limits or paved areas.<br />

Conduit placed under private driveways and walks shall<br />

be<br />

at least 30 inches below grade and shall extend at least 24 inches<br />

beyond the traveled way.<br />

Conduit may be used by the Customer outside public<br />

streets, ways, or paved areas and if used shall be galvanized steel<br />

or heavy-wall non-metallic at least 30 inches below grade for<br />

cable operating above 600 volts and at least 24 inches below grade<br />

for cable operating at or below 600 volts phase to phase.<br />

Where ledge excavation<br />

is necessary and subject to advance<br />

<strong>Company</strong><br />

approval, a reduction of cover may be allowed where<br />

supplemental protection is provided as permitted by NESC<br />

Section 352 D or NEC Sections 300.5 and 300.50.<br />

913. SEPARATION OF FACILITIES<br />

The separation of<br />

direct buried secondary or primary cables<br />

and<br />

ducts containing secondary or primary cable from all other