All 90° bends will be galvanized steel and have the<br />
following minimum radii:<br />
CONDUIT SIZE MINIMUM RADIUS<br />
2" 24"<br />
2 1/2" 24"<br />
3" 36"<br />
4" 48"<br />
5" 48"<br />
6" 48"<br />
(Two (2) 45° PVC bends shall not be used in lieu of a steel 90°<br />
bend.)<br />
911. DIRECT BURIAL PRIMARY CABLE<br />
Single-phase direct burial primary cable may be furnished<br />
and installed by the <strong>Company</strong> (at the customer’s expense) in the<br />
customer's trench or duct as provided below. Direct burial cable<br />
may<br />
be furnished and installed by the customer;<br />
however,<br />
particular notice should be made of the maintenance provisions<br />
of<br />
Paragraph 916.<br />
Direct burial cable shall be protected for 6 inches above and<br />
below by a bedding of soil containing no rocks. The remainder of<br />
the back-fill shall consist of clean fill containing no rocks larger<br />
than 4 inches in diameter. Bedding and back fill shall be free of<br />
roots,<br />
stumps and other debris. During back-filling of the trench,<br />
a plastic ‘ELECTRIC” marker tape (furnished by the <strong>Company</strong> if<br />
<strong>Company</strong> owned cable) shall be installed approximately 12 inches<br />
below final grade (and at least 12 inches above the cable per NEC<br />
Section 300.5).<br />
A suitable duct must be installed under public streets or<br />
ways, paved areas, driveways and all transmission rights-of-way.<br />
81<br />