72<br />

72<br />

The <strong>Company</strong> will make all connections to padmount<br />

transformers.<br />

However, on customer owned cable, the customer<br />

must provide all lugs and associated hardware and install them on<br />

the cable.<br />

For any underground service, splices or taps should be<br />

avoide d. If splices or taps (as permitted in NEC Section 230.33<br />

and 230.46) are required, then they must be in an enclosure, or,<br />

direct buried using a splice "listed" for direct burial and for the<br />

cable type used. Any splices on CMP's side of the meter socket<br />

must be accessible for inspection (by CMP). Note, by choosing<br />

the<br />

appropriate meter socket, splicing for the purpose of<br />

"downsizing" conductors may be avoided (refer to the<br />

"Supplement," paragraph 1.10.5).<br />

906. NON-RESIDENTIAL SECONDARY SERVICES<br />

All underground secondary cable (including transformer<br />

interconnecting cables) and terminal lugs required must be<br />

provided and owned by the customer whether from overhead or<br />

padmount transformer installations. Except as noted in Paragraph<br />

914, “Risers”, cable will be installed by the customer.<br />

Three phase service from a pole mounted three-phase unit<br />

or banked arrangement of transformers may be provided for total<br />

switch(s) capacity not to exceed 1,000 amperes. Note: Overhead<br />

secondary will be limited to two-four conductor (three phase<br />

conductors and one neutral/messenger) cables 336.4 kcmil (or<br />

smaller). Underground secondaries consisting of cables with<br />

conductors 4/0 AWG and smaller shall have no more than four<br />

conductors per phase. Underground secondaries consisting of<br />

cables with conductors larger than 4/0 AWG shall have no more<br />

than two conductors per phase. The owner of the secondary<br />

cables shall provide all terminal lugs and transformer secondary<br />

interconnecting cable and connectors. Cable support and<br />

positioning brackets may be required at the discretion of the