� Furnish and install (at the customer’s expense)<br />
the<br />
primary cable in conduit furnished by the customer or<br />
direct buried.<br />
� Provide a padmount transformer of adequate<br />
capacity.<br />
903.<br />
CUSTOMER COSTS<br />
The customer shall pay for all costs for the installation of<br />
single-phase secondary underground (UG) service provided by the<br />
<strong>Company</strong> as determined on a flat rate basis in accordance with the<br />
<strong>Company</strong>’s filed tariffs.<br />
Should it be necessary for the <strong>Company</strong> to install a road<br />
crossing pole specifically for an underground service installation<br />
which would not be provided for an equivalent overhead service,<br />
the customer shall be assessed a fee to cover the additional cost.<br />
The payment for the underground construction costs must<br />
be received by the <strong>Company</strong> prior to the scheduling of the<br />
construction.<br />
904. LOOP FEED REQUIREMENT<br />
When providing primary underground service to be owned<br />
by the <strong>Company</strong> or located in a public way, the construction will<br />
be a Loop Feed System or contain a spare cable. A primary<br />
underground line feeding a single customer and owned by that<br />
customer may be constructed as a radial feed system. See<br />
paragraph<br />
219 of this handbook for more information on customer<br />
constructed/owned lines.<br />
A Loop Feed System serves loads from one source circuit,<br />
through two separate cables or sets of cables. Ideally, the risers<br />
would be on separate poles, but when economic or physical<br />
conditions prevent the utilization of two separate poles, it shall<br />
be