metered. Inquiries regarding application of/exception to, this<br />

rule should be referred to the <strong>Company</strong>'s M&S Department.<br />

802. METER LOCATION<br />

The location of all metering equipment must be approved<br />

by the <strong>Company</strong> prior to installation. Meters shall be installed in<br />

safe and readily accessible outdoor locations when such a location<br />

is available. Neither meters nor enclosures shall be attached to<br />

padmount transformers or fences.<br />

Whenever it is necessary to install meters indoors, the<br />

location shall be chosen with regard to safety, accessibility for<br />

reading and maintenance. In general, the<br />

meter shall be installed<br />

on the ground floor. In certain cases they may be installed in<br />

groups, in rooms reserved for this purpose on other floors.<br />

Unmetered conductors supplying meters in separate meter rooms<br />

shall be installed in separate metallic conduit. Meters shall not be<br />

installed in storage rooms, cabinets, closets or other locations that<br />

may be locked or otherwise made inaccessible.<br />

803. METER POSITION<br />

All meter mounting devices shall be installed so that the<br />

meters will be upright (plumb). They shall<br />

generally be installed<br />

with the top of the meter not less than 48 inches or more than 60<br />

inches from the floor or final grade. Exceptions to this height<br />

requirement are for installation of group or modular metering (see<br />

Illustration No. 12 in Section XII), and transformer-rated overall<br />

meter enclosures (see Illustration No. 14, 15, 16, or 17 in Section<br />

XII).<br />

Level grade shall be maintained for a minimum of 36 inches<br />

in front of the meter enclosure to provide a safe working space. In<br />

order to meet this requirement on uneven terrain, as an option, the<br />

customer may install a pressure treated wood platform. For<br />

modular metering, see Illustration No. 12 in Section XII.<br />