Notes:<br />

1. Aluminum electrodes are NOT permitted.<br />

2. Per NEC Section 250.56, where a single made electrode<br />

(5, 6 or 7 above) exceeds 25 ohms resistance to ground,<br />

an additional electrode consisting of any one of 2<br />

through 8 must be utilized. When this additional<br />

electrode is a made electrode (5 ,6 or 7), it shall be<br />

installed at least 6 feet away from, and bonded together<br />

with, the first electrode. Although the NEC requires a<br />

minimum separation of only 6 feet, the <strong>Company</strong> highly<br />

recommends a minimum separation of 16 feet (between<br />

8 foot ground rods) in order to maximize the paralleling<br />

effectiveness.<br />

For much of <strong>Central</strong> <strong>Maine</strong> <strong>Power</strong> <strong>Company</strong>’s service<br />

territory, meeting the “25 ohms or less” requirement is<br />

highly unlikely; therefore, installation of an additional<br />

electrode should be anticipated.<br />

It is the responsibility<br />

of the customer/electrician to verify the 25 ohms, or<br />

less, resistance and/or install the additional<br />

electrode.<br />

3. See NEC Sections 250.50 thru 250.70 for further details<br />

on grounding electrode systems.<br />

702. BONDING<br />

To prevent any potential differences from occurring<br />

between them, all of the grounding electrodes listed in paragraph<br />

701, as well as, CATV, communications or any other system<br />

grounding electrodes that are available on the premises, shall be<br />

bonded together. Intersystem bonding shall be installed in<br />

accordance with NEC 250.94 and shall have the capacity for at<br />

least 3 intersystem bonding conductors. It is the<br />

responsibility of<br />

the customer/electrician to ensure intersystem bonding<br />

provisions are provided. In the case where<br />

the grounding<br />

47<br />

47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!