05.01.2013 Views

HANDBOOK REQUIREMENTS - Central Maine Power Company

HANDBOOK REQUIREMENTS - Central Maine Power Company

HANDBOOK REQUIREMENTS - Central Maine Power Company

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

38<br />

505. SERVICE MAST CONSTRUCTION<br />

Unless otherwise approved by the<br />

<strong>Company</strong>, masts shall be<br />

constructed of rigid steel conduit or steel intermediate metal<br />

conduit (IMC) with an inside diameter of no less than 2 inches.<br />

Refer to Illustration No. 3 in Section XII.<br />

Aluminum conduit, rigid non-metallic conduit or electrical<br />

metallic tubing (EMT) shall not be used for masts.<br />

Because the mast is grounded through the meter socket hub,<br />

it should not be bonded to the neutral (grounded conductor) at<br />

the top end.<br />

38

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!