HANDBOOK REQUIREMENTS - Central Maine Power Company
HANDBOOK REQUIREMENTS - Central Maine Power Company
HANDBOOK REQUIREMENTS - Central Maine Power Company
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
26<br />
Refer to paragraph 219 for the requirements on<br />
interconnecting <strong>Company</strong> lines with customer-owned<br />
line<br />
extensions.<br />
405. NEW AND UPGRADED SERVICE ENTRANCES<br />
A. GENERAL<br />
<strong>Company</strong> seals will be cut or removed only by<br />
qualified <strong>Company</strong> employees.<br />
Any expenses in connection<br />
with the relocation or<br />
change of <strong>Company</strong> facilities as a result of a customer<br />
change or relocation of the service entrance shall be borne<br />
by the customer.<br />
The customer shall be responsible for installing the<br />
service entrance which encompasses the weatherhead<br />
through<br />
the service disconnecting device/overcurrent<br />
protection, and includes the service entrance grounding.<br />
A <strong>Company</strong> employee will work with the customer<br />
and/or electrician in determining a suitable meter location,<br />
point of attachment of the service drop and location of the<br />
service head. The meter must be in a safe and readily<br />
accessible location.<br />
All service entrance installations must be approved<br />
by the <strong>Company</strong> and a State or municipal inspector. Any<br />
required local or State permits or certificates of inspection<br />
shall<br />
be received by the <strong>Company</strong><br />
before new or upgraded<br />
services are connected.<br />
All electrical connections to <strong>Company</strong> secondaries<br />
must be made by a <strong>Company</strong> employee. Outdoor work may<br />
be affected by weather, and scheduling may be subject to<br />
change.<br />
26