304. TRANSFORMER VAULTS AND<br />

METAL<br />

ENCLOSURES<br />

Where high capacity<br />

services are required, or where an<br />

open outdoor location for transformers is not available, the<br />

<strong>Company</strong> may require the customer to furnish and properly<br />

maintain a suitable vault or metal enclosure on the premises for<br />

the necessary transformers and protective equipment. Such<br />

transformer vaults or enclosures must meet the requirements of<br />

the<br />

NEC and be provided with safe, secure and readily accessible<br />

outside access. Vault and enclosure specifications are subject to<br />

advance approval by the <strong>Company</strong>. Information will be furnished<br />

on request.<br />

305. UNBALANCED LOAD<br />

The customer shall at all times take and use energy in such<br />

a manner that the load will be balanced between phases to within<br />

nominally 10%. In the event of unbalanced polyphase loads,<br />

the<br />

<strong>Company</strong><br />

reserves the right to require the customer to make the<br />

necessary changes at the customer's expense to correct the<br />

unsatisfactory condition, or to compute the demand used for<br />

billing purposes on the assumption that the load on each phase<br />

is<br />

equal to that on the greatest phase.