219. CUSTOMER CONSTRUCTED/OWNED LINES<br />
A. GENERAL<br />
Electric distribution line extensions may be<br />
constructed by a contractor and owned by the customer in<br />
accordance with: the provisions of the MPUC's Chapter "<br />
395, "Construction Standards and Ownership and Cost<br />
Allocation Rules for Electric Distribution Line Extensions<br />
and the <strong>Company</strong>'s filed<br />
tariff (T&C) on "Extensions."<br />
Customers must contact the <strong>Company</strong> prior to the<br />
start of construction of "Customer Constructed/Owned<br />
Lines" to insure that the line will be built in such a manner<br />
that<br />
it can be connected to CMP's distribution system in<br />
accordance with all applicable rules and regulations.<br />
B.<br />
CONSTRUCTION<br />
Extensions may be constructed by a private line<br />
con tractor, and owned by the customer, if the line will serve<br />
only one customer (as defined in the MPUC's Chapter<br />
395).<br />
In this case, the property owner may retain ownership<br />
of the line and the <strong>Company</strong> will then have no<br />
responsibility<br />
for repair and maintenance of the line,<br />
including tree trimming and storm damage repair.<br />
In the event the line will serve multiple customers,<br />
such as in a development or subdivision, the line may be<br />
constructed by a private line contractor;<br />
however, it shall<br />
be<br />
owned by the <strong>Company</strong>. In this case, the customer shall<br />
be responsible for all costs associated with the transfer of<br />
ownership<br />
as specified in the MPUC's Chapter 395 and the<br />
<strong>Company</strong>'s filed tariff (T&C) on "Extensions."<br />