05.01.2013 Views

HANDBOOK REQUIREMENTS - Central Maine Power Company

HANDBOOK REQUIREMENTS - Central Maine Power Company

HANDBOOK REQUIREMENTS - Central Maine Power Company

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

205. INSTALLATION CONTRACTS<br />

When contracts for electric wiring or equipment are<br />

prepared by contractors, architects or engineers, it is suggested<br />

that such contracts include the specification that "all materials,<br />

labor and workmanship be in full accordance with the latest<br />

requirements<br />

of: the NEC, all municipal, State and National<br />

authorities having jurisdiction, and <strong>Central</strong> <strong>Maine</strong> <strong>Power</strong><br />

<strong>Company</strong>."<br />

206. NOTICE OF CHANGE IN LOAD<br />

The customer shall give proper notice to the <strong>Company</strong>'s<br />

local Service Center or Marketing & Sales (M&S) Department of<br />

an increase or decrease proposed in connected load or of any<br />

proposed change in characteristics,<br />

purpose of use, or location of<br />

load.<br />

207. INSPECTION <strong>REQUIREMENTS</strong><br />

In municipalities where electrical inspections are required<br />

by local authorities, certificates of approval must be received in<br />

<strong>Company</strong>'s local Service Center before installations will be<br />

connected to the <strong>Company</strong>'s distribution system. Such certificates<br />

are<br />

to be obtained from the “authority having<br />

jurisdiction” by the<br />

customer or contractor.<br />

Where local authorities do not require inspection<br />

certificates, any required State permits or certificate of inspection<br />

shall be received<br />

in the <strong>Company</strong>'s local Service Center before<br />

temporary, new or upgraded services<br />

are connected. Refer to<br />

paragraph 201 for specific certification requirements. The<br />

customer is advised to contact the <strong>Company</strong>'s local Service Center<br />

to verify the inspection requirements.<br />

The <strong>Company</strong> shall not be responsible for the installation or<br />

maintenance of the customer's electrical equipment,<br />

nor shall there<br />

7<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!