6<br />

Dwelling Application is used when the homeowner does<br />

the wiring and the State inspector certifies the wiring.<br />

202. SERVICE REQUIRING EXTENSION OF LINES<br />

Line extensions shall be in accordance with the provisions<br />

of the MPUC’s Chapter 395 “Construction Standards and<br />

Ownership and Cost Allocation Rules for Electric Distribution<br />

Line Extensions,” and, the <strong>Company</strong>’s filed tariff or Term &<br />

Condition (T&C) on “Extensions." See paragraph 219 of this<br />

handbook for more details on customer constructed/owned<br />

lines.<br />

203. INSTALLATION OF SERVICE-SUPPLY<br />

LINES<br />

The <strong>Company</strong> is not required to install service-supply lines<br />

prior to the time that the wiring of the premises is actually in<br />

progress and the structure sufficiently completed to provide a safe<br />

and suitable terminus for the service-supply lines.<br />

204. TEMPORARY SERVICE<br />

Customers taking service on a temporary basis are required<br />

to pay an amount equivalent to the cost of installing and removing<br />

the <strong>Company</strong>'s service facilities, including the nonsalvable costs<br />

of material used. Temporary service, provided typically for<br />

building construction purposes, is intended to be used for a limited<br />

time period at a location where the facilities devoted especially to<br />

the service are not expected to have further usefulness at that<br />

location after the temporary period. There shall be no other<br />

attachments to the temporary structure; and, if it becomes unsafe,<br />

service may be disconnected (See paragraph 209). In special<br />

cases advance payment is required. See<br />

Illustration No. 7 in<br />

Section XII for overhead temporary service structure<br />

requirements. See Par. 918 and Illustration No.s 9 and 11 for<br />

underground temporary or permanent service structure<br />

requirements.<br />