05.01.2013 Views

HANDBOOK REQUIREMENTS - Central Maine Power Company

HANDBOOK REQUIREMENTS - Central Maine Power Company

HANDBOOK REQUIREMENTS - Central Maine Power Company

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

501. Conductor Identification<br />

502. Location for Proper Clearances<br />

503. Attachment Methods<br />

504. Service Entrance Conduit<br />

505. Service Mast Construction<br />

VI. SERVICE (ENTRANCE) EQUIPMENT<br />

600. Disconnecting Means<br />

601. Sequence of Disconnecting Means and Meter<br />

Equipment<br />

602. Metered and Unmetered Wires<br />

603. Emergency or Standby <strong>Power</strong><br />

604. Changes in the Service Entrance<br />

VII. GROUNDING AND BONDING<br />

700. General<br />

701. Grounding Electrode System<br />

702. Bonding<br />

703. Grounding Electrode Conductor<br />

704. Lightning Protection System<br />

705. Service Surge Protection<br />

VIII. METERING EQUIPMENT<br />

800. General<br />

801. Metering Multi-Tenant Buildings<br />

802 Meter Location<br />

803. Meter Position<br />

804. Pole Mounted Meters<br />

805. Meter Pedestals<br />

806. Multiconnection Points<br />

807. Identification of Meters<br />

808. Clearance for Metering Equipment<br />

809. Self-Contained Metering<br />

810. Instrument Transformer Metering<br />

811. Instrument Transformer Cabinets<br />

ix<br />

ix

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!