06 | Technický a investičný rozvoj<br />

V ROKU <strong>2008</strong> POKRAČOVALA SPO-<br />

LOČNOSŤ TRANSPETROL V REALI-<br />

ZÁCII PROJEKTOV, ZAMERANÝCH<br />

NAJMÄ NA ÚLOHY SPOJENÉ SO<br />

ZVÝŠENÍM ENERGETICKEJ A EN-<br />

VIRONMENTÁLNEJ BEZPEČNOS-<br />

TI, ĎALŠÍM ZEFEKTÍVNENÍM PRE-<br />

VÁDZKY ROPOVODNÉHO SYSTÉ-<br />

MU A ZDOKONALENÍM RIADIACE-<br />

HO A INFORMAČNÉHO SYSTÉMU<br />

ROPOVODU.<br />

V priebehu roka <strong>2008</strong> spoločnosť<br />

realizovala 10 rozsiahlych a 7 menej<br />

náročných investičných a rozvojových<br />

projektov. Z tohto počtu boli ukončené<br />

4 rozsiahlejšie projekty a všetky<br />

menej náročné investičné projekty.<br />

Z rozsiahlych projektov bolo najvýznamnejšie<br />

ukončenie výstavby<br />

veľkokapacitnej nádrže H 501 v PS 5<br />

Bučany s objemom 75 tis. m 3 ako aj<br />

tri menšie investičné akcie, zamerané<br />

predovšetkým na ochranu životného<br />

prostredia. Realizácia ostatných projektov<br />

pokračuje v roku 2009, v ktorom<br />

predpokladáme ukončenie výstavby<br />

ďalšej veľkokapacitnej nádrže<br />

a v ďalších rokoch budovanie nových<br />

veľkokapacitných nádrží v PS 1<br />

Budkovce a PS 5 Bučany. Celkom bolo<br />

na investičný rozvoj vynaložených<br />

622,04 mil. Sk (20,648 mil. EUR), vrátane<br />

investičných nákupov, čo predstavuje<br />

76 % z celkových plánovaných<br />

prostriedkov na rok 2009.<br />

Medzi rozhodujúce, čo do objemu<br />

finančných prostriedkov, a najvýznamnejšie<br />

pre rozvoj spoločnosti<br />

patrili v roku <strong>2008</strong> dokončené<br />

projekty:<br />

– 024-01 - Výstavba nádrže H 501<br />

- 75 000 m 3 vrátane infraštruktúry<br />

V PS 5 Bučany,<br />

– 016 - Rekonštrukcia NN rozvádzačov<br />

na trase ropovodu,<br />

– 020 - Modernizácia riadiaceho<br />

systému - sledovanie únikov na<br />

trase ropovodu,<br />

– 416-02 - Rekonštrukcia oplotenia<br />

v PS 2 Moldava nad Bodvou.<br />

Do ďalších rokov prešli nasledujúce<br />

významné investičné projekty:<br />

– 024-02 - Výstavba nádrže H 502<br />

- 75 000 m 3 v PS 5 Bučany,<br />

– 028 - Výstavba nádrže č. 232<br />

- 50 000 m 3 v PS 1 Budkovce,<br />

– 029 - Výstavba nádrže č. 235<br />

- 50 000 m 3 v PS 1 Budkovce,<br />

– 055-04 - Rekonštrukcia tepelných<br />

zdrojov v PS 4 Tupá,<br />

– 024-03 - Výstavba priestorov pre závodný<br />

hasičský útvar v PS 5 Bučany,<br />

– 430 - Rekonštrukcia trafostanice<br />

110/6 kV v PS 4 Tupá,<br />

Technical and Investment<br />

Development<br />

IN <strong>2008</strong> THE TRANSPETROL COMPANY<br />

CONTINUED TO IMPLEMENT PROJECTS<br />

PREDOMINANTLY AIMED AT THE TASKS<br />

RELATED TO THE IMPROVEMENT OF ENERGY<br />

AND ENVIRONMENTAL SECURITY, FURTHER<br />

INCREASE IN THE EFFICIENCY OF THE OIL<br />

PIPELINE SYSTEM AND THE ENHANCEMENT<br />

OF ITS CONTROL AND INFORMATION SYSTEM.<br />

In the course of <strong>2008</strong> the company undertook ten<br />

large-scale investment and development projects,<br />

including seven projects on a smaller scale.<br />

Of this number, four large-scale and all small-scale<br />

investment projects have been completed.<br />

As regards the large-scale projects, the completed<br />

construction of a large-capacity oil storage tank H<br />

501 at PS-5 in Bučany (with a volume of 75 000 m 3 )<br />

was the most important, hand in hand with three<br />

small-scale investments focusing,<br />

in particular, on the protection of the<br />

environment. The remaining projects continued<br />

in 2009 when another large-capacity tank is<br />

expected to be completed, whereas new largecapacity<br />

tanks PS 1 Budkovce and PS 5 Bučany<br />

should be constructed in the subsequent years.<br />

The funds spent for investments totalled SKK<br />

622.04 million (EUR 20.648 million) including<br />

investment acquisitions, and this amount<br />

represents 76 % of all funds planned for 2009.<br />

In terms of the volume of funds, the projects<br />

completed in <strong>2008</strong>, which are crucial for<br />

the company’s development, are as follows:<br />

– 024-01 - Construction of the H 501 tank<br />

- 75 000 m 3 including infrastructure in PS 5 Bučany,<br />

– 016 - Reconstruction of LV switching stations<br />

along the oil pipeline route,<br />

– 020 - Control system upgrade – leakage<br />

monitoring along the oil pipeline route,<br />

– 416-02 - Reconstruction of the fence in PS 2<br />

Moldava nad Bodvou.<br />

The following investment projects<br />

were carried over to the next years:<br />

– 024-02 - Construction of the H 502 tank<br />

- 75 000 m 3 in PS 5 Bučany,<br />

– 028 - Construction of the H 232 tank<br />

- 50 000 m 3 in PS 1 Budkovce,<br />

– 029 - Construction of the H 235 tank<br />

- 50 000 m 3 in PS 1 Budkovce,<br />

– 055-04 - Reconstruction of heat sources<br />

in PS 4 Tupá,<br />

– 024-03 - Construction of the fire-fighting<br />

team premises in PS 5 Bučany,<br />

– 430 - Reconstruction of the 110/6 kV<br />

transformer station in PS 4 Tupá,<br />