23.09.2012 Views

Project Report Main Drainage Channel - Branzoll - Krismer

Project Report Main Drainage Channel - Branzoll - Krismer

Project Report Main Drainage Channel - Branzoll - Krismer

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: office@krismer.at | http://www.krismer.com<br />

<strong>Project</strong> <strong>Report</strong><br />

<strong>Main</strong> <strong>Drainage</strong> <strong>Channel</strong> - <strong>Branzoll</strong><br />

Bozen, South Tyrol/Italy<br />

MAIN DRAINAGE CHANNEL - BRANZOLL 1 / 13<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilisation<br />

Hydraulic Engineering/ <strong>Drainage</strong><br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: office@krismer.at | http://www.krismer.com<br />

<strong>Project</strong> Data Slope/ Embankment Stabilisation<br />

Contractor Consortium for the <strong>Main</strong> <strong>Drainage</strong> <strong>Channel</strong> - <strong>Branzoll</strong><br />

Gerbergasse 24<br />

I - 39100 Bozen<br />

Planning company Studio Technico - Associato VOLANTE MONTALI<br />

Theaterplatz 23/II<br />

I - 39012 Meran<br />

Execution of construction Dept. of Torrent and Avalanche Control for South Tyrol<br />

Cesare Battisti Straße 23<br />

I - 39100 Bozen<br />

Task Widening and heightening of the main drainage channel;<br />

Construction of service streets and cycle tracks on both<br />

bank sides within the existing boundaries<br />

Construction methods Riprapping and Embankment stabilisation<br />

with the <strong>Krismer</strong> System®<br />

Execution time Autumn 2001 until Summer 2002<br />

<strong>Project</strong> volume Total length of the embankment: ~ 3.600 m (2 x 1.800 m)<br />

Reconstruction surface: ~ 18.200 m²<br />

Integration of the System <strong>Krismer</strong> ® into border zones: ~ 5400 m²<br />

Inclination of the embankment: - 45 °<br />

Height of the embankment: 6 – 6.5 m<br />

MAIN DRAINAGE CHANNEL - BRANZOLL 2 / 13<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Hydraulic Engineering/ <strong>Drainage</strong><br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: office@krismer.at | http://www.krismer.com<br />

Initial Situation Slope/ Embankment Stabilisation<br />

On account of the global climate changes and the increase of extreme weather caprioles<br />

conditioned thereby, the frequency and amplitude of extreme flood events has strongly<br />

increased in wide parts of Europe during the past years. From this was also concerned the<br />

main drainage channel of <strong>Branzoll</strong> which could not lead away the occurred flood.<br />

This led to the fact that the adjoining cultural landscape and the fruit plantations were<br />

flooded over and over again. Besides, the embankments of the drainage channel were<br />

strongly attacked in the course of the time, so that the maintenance was not possible any<br />

more.<br />

Hence, it was the central task to enlarge the channel according to a higher, acceptable<br />

calculated quantity of water. Accordingly the drainage cross section was to be extended in<br />

his width and height.<br />

The embankment should be carried out with an inclination of approx. 42° - 45° and with a<br />

surface drainage. Besides, a wash-out of fine parts should be prevented as much as possible.<br />

The construction method with the <strong>Krismer</strong> System® was predestined to meet these<br />

requirements for the embankment stabilisation optimally.<br />

Abb. 1: <strong>Main</strong> drainage channel before beginning the construction works<br />

MAIN DRAINAGE CHANNEL - BRANZOLL 3 / 13<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Hydraulic Engineering/ <strong>Drainage</strong><br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: office@krismer.at | http://www.krismer.com<br />

Embankment Stabilisation with the <strong>Krismer</strong> System® - System Structure Slope/ Embankment Stabilisation<br />

Embankment surface:<br />

(starting from the finished embankment surface)<br />

- layer of top soil (thickness ~ 3 cm) with seeds (for the formation of a compact sward)<br />

- <strong>Krismer</strong> System®: three-dimensional steel grid panel (J.K.S. panel), type J.K.S. A02-80|1.5-FEZ,<br />

height = 8 cm, fixed with special ground nails (with welded-on hook and point) and<br />

strengthened with hot-dip galvanised distribution rods Ø 12 mm, type R12/2500 or R12/3700<br />

- gravel filling (into the three-dimensional J.K.S. panel):<br />

grain size 32/60 mm, cubature 6 m³/100 m²<br />

- geotextile: width = 4 m, grammage 200g/m²<br />

Integration of the <strong>Krismer</strong> System® at the embankment base<br />

(border zone - riprapping / <strong>Krismer</strong> System®):<br />

- cover net: wire netting, type Maccafferi, mesh size 50/70 mm, wire size 2 mm, galvanised,<br />

up-clasped with steel clips, type Spenax 11 G 40<br />

- sack gabions: Ø 0.5 m, length = 2 m<br />

- geotextile: width = 2 m, grammage 200g/m²<br />

MAIN DRAINAGE CHANNEL - BRANZOLL 4 / 13<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Hydraulic Engineering/ <strong>Drainage</strong><br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: office@krismer.at | http://www.krismer.com<br />

<strong>Project</strong> Realisation Slope/ Embankment Stabilisation<br />

Fig. 2: Widening of the existing riverbed and constructing of the<br />

required embankment inclination<br />

Fig. 3: Delivery of river stones for the construction of a stone wall<br />

(riprapping) for the integration of the embankment in the river sole<br />

MAIN DRAINAGE CHANNEL - BRANZOLL 5 / 13<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Hydraulic Engineering/ <strong>Drainage</strong><br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: office@krismer.at | http://www.krismer.com<br />

Fig. 4: Placing of the river stones<br />

Fig. 5: Integration of the <strong>Krismer</strong> System® at the embankment base<br />

MAIN DRAINAGE CHANNEL - BRANZOLL 6 / 13<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilisation<br />

Hydraulic Engineering/ <strong>Drainage</strong><br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: office@krismer.at | http://www.krismer.com<br />

For the integration of the <strong>Krismer</strong> System® at the embankment base a wire netting (type<br />

Maccaferri, mesh size 50/70 mm, width = 4 m) and about that a layer of geotextile<br />

(grammature 200 g/m ², width = 2 m) was laid along the riprapping. By means of sack<br />

gabions (fig. 5) the wire netting and the geotextile were weighted.<br />

The wire netting had to show a river-sided excess end of 2-3 m, so that it could be folded after<br />

integration of the <strong>Krismer</strong> System® (back-sided of the sack gabions) about the sack gabions<br />

and be fastened at the three-dimensional J.K.S. panels.<br />

The steady integration of the system is guaranteed by the high extra load of the sack<br />

gabions.<br />

Besides, sack gabions were laid on the stone wall (riprapping) along the whole length. They<br />

have the function to prevent a possible erosion of the embankment surface by the water due<br />

to gaps between the coarse block stones.<br />

Fig. 6: Wire netting, geotextile and sack gabions were used for the integration<br />

of the <strong>Krismer</strong> System® at the embankment base<br />

MAIN DRAINAGE CHANNEL - BRANZOLL 7 / 13<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilisation<br />

Hydraulic Engineering/ <strong>Drainage</strong><br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: office@krismer.at | http://www.krismer.com<br />

The step-by-step installation of the whole embankment stabilisation system proceeded as<br />

follows:<br />

First of all, the embankment surface was cleaned. Uneven terrains were filled-up. Then the<br />

geotextile was laid as a lowest layer (fig. 7) on the embankment surface. This serves to<br />

prevent a wash-out of fine parts.<br />

The geotextiles (width = 4 m) were overlapped 20 cm at the longitudinal-sided joining. In the<br />

course of that the excess end of the geotextile which was used for the system integration on<br />

the embankment base was also overlapped by these geotextiles.<br />

Fig. 7: Installation of the geotextile on the embankment surface<br />

After a low follow-up time the installation team started to join the single J.K.S. panels<br />

longitudinally and laterally to bigger units at the level area which is bordering to the<br />

embankment.<br />

These units were laid on the geotextile (fig. 8, 9) and interconnected with rust-free wire<br />

binding loops, by overlapping. Besides, it was to be paid attention to the fact that the J.K.S.<br />

panels are laid on the embankment crosswise to the fall line and against the flow direction of<br />

the watercourse (fig. 9).<br />

The steady anchorage in the subsoil occurred by means of special T-steel nails which were<br />

rammed into the subsoil.<br />

For the rise of the compound effect of the <strong>Krismer</strong> System®, distribution rods were inserted<br />

consecutively in the J.K.S. panels.<br />

MAIN DRAINAGE CHANNEL - BRANZOLL 8 / 13<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilisation<br />

Hydraulic Engineering/ <strong>Drainage</strong><br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: office@krismer.at | http://www.krismer.com<br />

Fig. 8: Installation of the J.K.S. panels, pre-assembled to bigger units<br />

Fig. 9: Laying the units of the J.K.S. panels crosswise to the fall line of the<br />

embankment and against the flow direction of the watercourse<br />

MAIN DRAINAGE CHANNEL - BRANZOLL 9 / 13<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilisation<br />

Hydraulic Engineering/ <strong>Drainage</strong><br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: office@krismer.at | http://www.krismer.com<br />

Fig. 10: Ramming of the ground nails<br />

Ramming of the ground nails took<br />

place after a defined raster which<br />

was calculated - as well as the nail<br />

lengths - according to the static<br />

requirements<br />

Fig. 11: Integration of the <strong>Krismer</strong> System® into the adjacent area (border zone)<br />

MAIN DRAINAGE CHANNEL - BRANZOLL 10 / 13<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilisation<br />

Hydraulic Engineering/ <strong>Drainage</strong><br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: office@krismer.at | http://www.krismer.com<br />

At the top of the embankment the complete system was integrated into the border zone on<br />

a width of about 1.5 m. Along the tear-off edge the J.K.S. panels were fastened with earth<br />

nails in the distance of approx. 1 m.<br />

The application of the <strong>Krismer</strong> System® for the embankment stabilisation enables a surface<br />

drainage. For this the concept of the system intends a filling of the J.K.S. panels with gravel<br />

(grain size 32/60 mm). These works were carried out with an excavator from the terrain<br />

bordering to the embankment.<br />

Afterwards the J.K.S. panels were filled with humus.<br />

The sowing took place by use of mineral as well as biological (long time)fertiliser. The plant<br />

growth should be thereby accelerated and a quick rooting be reached what leads to an<br />

additional strengthening of the erosion protection.<br />

At customer's option it was renounced the installation of the cover net.<br />

Fig. 12: Filling of gravel and humus<br />

into the J.K.S. panels with<br />

an excavator<br />

MAIN DRAINAGE CHANNEL - BRANZOLL 11 / 13<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilisation<br />

Hydraulic Engineering/ <strong>Drainage</strong><br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: office@krismer.at | http://www.krismer.com<br />

Fig. 13: Embankment stabilisation with the <strong>Krismer</strong> System® (03/2004)<br />

A year after finishing the construction work a post-fertilisation of the embankment surface<br />

took place. This serves for the fact that an even steadier and compact sward can be formed<br />

(fig.13).<br />

MAIN DRAINAGE CHANNEL - BRANZOLL 12 / 13<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilisation<br />

Hydraulic Engineering/ <strong>Drainage</strong><br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

Stabilisation<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: office@krismer.at | http://www.krismer.com<br />

Embankment<br />

Results Slope/<br />

In the course of the extension of the main drainage channel <strong>Branzoll</strong> the <strong>Krismer</strong> System® for<br />

the stabilisation of the embankment was applied.<br />

Up to the present the following effects could be achieved as a verifiable result of this<br />

construction measure:<br />

• sustainable protection of the embankment from erosion<br />

• the excellent compound effect and the stable construction of the J.K.S. panels counteract<br />

the flow pressure optimally<br />

• the carried out embankment stabilisation drains perfect and prevents a high formation of<br />

flow pressure<br />

• the stabilised layer of top soil forms the base for a lasting growth<br />

• the application of the <strong>Krismer</strong> System® enabled carrying out the embankment stabilisation<br />

very well with an inclination of 45°, so that several hectares of valuable cultural landscape<br />

could be won<br />

Fig. 14: <strong>Main</strong> drainage channel - <strong>Branzoll</strong> (03/2004)<br />

MAIN DRAINAGE CHANNEL - BRANZOLL 13 / 13<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Hydraulic Engineering/ <strong>Drainage</strong><br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection