J. KRISMER Handelsgesellschaft m.b.H<br />
A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />
E-mail: office@krismer.at | http://www.krismer.com<br />
<strong>Project</strong> <strong>Report</strong><br />
<strong>Main</strong> <strong>Drainage</strong> <strong>Channel</strong> - <strong>Branzoll</strong><br />
Bozen, South Tyrol/Italy<br />
MAIN DRAINAGE CHANNEL - BRANZOLL 1 / 13<br />
© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />
Slope/ Embankment Stabilisation<br />
Hydraulic Engineering/ <strong>Drainage</strong><br />
Retaining Structures<br />
Services Special Constructions Rockfall/ Avalanche Protection
J. KRISMER Handelsgesellschaft m.b.H<br />
A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />
E-mail: office@krismer.at | http://www.krismer.com<br />
<strong>Project</strong> Data Slope/ Embankment Stabilisation<br />
Contractor Consortium for the <strong>Main</strong> <strong>Drainage</strong> <strong>Channel</strong> - <strong>Branzoll</strong><br />
Gerbergasse 24<br />
I - 39100 Bozen<br />
Planning company Studio Technico - Associato VOLANTE MONTALI<br />
Theaterplatz 23/II<br />
I - 39012 Meran<br />
Execution of construction Dept. of Torrent and Avalanche Control for South Tyrol<br />
Cesare Battisti Straße 23<br />
I - 39100 Bozen<br />
Task Widening and heightening of the main drainage channel;<br />
Construction of service streets and cycle tracks on both<br />
bank sides within the existing boundaries<br />
Construction methods Riprapping and Embankment stabilisation<br />
with the <strong>Krismer</strong> System®<br />
Execution time Autumn 2001 until Summer 2002<br />
<strong>Project</strong> volume Total length of the embankment: ~ 3.600 m (2 x 1.800 m)<br />
Reconstruction surface: ~ 18.200 m²<br />
Integration of the System <strong>Krismer</strong> ® into border zones: ~ 5400 m²<br />
Inclination of the embankment: - 45 °<br />
Height of the embankment: 6 – 6.5 m<br />
MAIN DRAINAGE CHANNEL - BRANZOLL 2 / 13<br />
© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />
Hydraulic Engineering/ <strong>Drainage</strong><br />
Retaining Structures<br />
Services Special Constructions Rockfall/ Avalanche Protection
J. KRISMER Handelsgesellschaft m.b.H<br />
A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />
E-mail: office@krismer.at | http://www.krismer.com<br />
Initial Situation Slope/ Embankment Stabilisation<br />
On account of the global climate changes and the increase of extreme weather caprioles<br />
conditioned thereby, the frequency and amplitude of extreme flood events has strongly<br />
increased in wide parts of Europe during the past years. From this was also concerned the<br />
main drainage channel of <strong>Branzoll</strong> which could not lead away the occurred flood.<br />
This led to the fact that the adjoining cultural landscape and the fruit plantations were<br />
flooded over and over again. Besides, the embankments of the drainage channel were<br />
strongly attacked in the course of the time, so that the maintenance was not possible any<br />
more.<br />
Hence, it was the central task to enlarge the channel according to a higher, acceptable<br />
calculated quantity of water. Accordingly the drainage cross section was to be extended in<br />
his width and height.<br />
The embankment should be carried out with an inclination of approx. 42° - 45° and with a<br />
surface drainage. Besides, a wash-out of fine parts should be prevented as much as possible.<br />
The construction method with the <strong>Krismer</strong> System® was predestined to meet these<br />
requirements for the embankment stabilisation optimally.<br />
Abb. 1: <strong>Main</strong> drainage channel before beginning the construction works<br />
MAIN DRAINAGE CHANNEL - BRANZOLL 3 / 13<br />
© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />
Hydraulic Engineering/ <strong>Drainage</strong><br />
Retaining Structures<br />
Services Special Constructions Rockfall/ Avalanche Protection
J. KRISMER Handelsgesellschaft m.b.H<br />
A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />
E-mail: office@krismer.at | http://www.krismer.com<br />
Embankment Stabilisation with the <strong>Krismer</strong> System® - System Structure Slope/ Embankment Stabilisation<br />
Embankment surface:<br />
(starting from the finished embankment surface)<br />
- layer of top soil (thickness ~ 3 cm) with seeds (for the formation of a compact sward)<br />
- <strong>Krismer</strong> System®: three-dimensional steel grid panel (J.K.S. panel), type J.K.S. A02-80|1.5-FEZ,<br />
height = 8 cm, fixed with special ground nails (with welded-on hook and point) and<br />
strengthened with hot-dip galvanised distribution rods Ø 12 mm, type R12/2500 or R12/3700<br />
- gravel filling (into the three-dimensional J.K.S. panel):<br />
grain size 32/60 mm, cubature 6 m³/100 m²<br />
- geotextile: width = 4 m, grammage 200g/m²<br />
Integration of the <strong>Krismer</strong> System® at the embankment base<br />
(border zone - riprapping / <strong>Krismer</strong> System®):<br />
- cover net: wire netting, type Maccafferi, mesh size 50/70 mm, wire size 2 mm, galvanised,<br />
up-clasped with steel clips, type Spenax 11 G 40<br />
- sack gabions: Ø 0.5 m, length = 2 m<br />
- geotextile: width = 2 m, grammage 200g/m²<br />
MAIN DRAINAGE CHANNEL - BRANZOLL 4 / 13<br />
© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />
Hydraulic Engineering/ <strong>Drainage</strong><br />
Retaining Structures<br />
Services Special Constructions Rockfall/ Avalanche Protection
J. KRISMER Handelsgesellschaft m.b.H<br />
A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />
E-mail: office@krismer.at | http://www.krismer.com<br />
<strong>Project</strong> Realisation Slope/ Embankment Stabilisation<br />
Fig. 2: Widening of the existing riverbed and constructing of the<br />
required embankment inclination<br />
Fig. 3: Delivery of river stones for the construction of a stone wall<br />
(riprapping) for the integration of the embankment in the river sole<br />
MAIN DRAINAGE CHANNEL - BRANZOLL 5 / 13<br />
© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />
Hydraulic Engineering/ <strong>Drainage</strong><br />
Retaining Structures<br />
Services Special Constructions Rockfall/ Avalanche Protection
J. KRISMER Handelsgesellschaft m.b.H<br />
A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />
E-mail: office@krismer.at | http://www.krismer.com<br />
Fig. 4: Placing of the river stones<br />
Fig. 5: Integration of the <strong>Krismer</strong> System® at the embankment base<br />
MAIN DRAINAGE CHANNEL - BRANZOLL 6 / 13<br />
© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />
Slope/ Embankment Stabilisation<br />
Hydraulic Engineering/ <strong>Drainage</strong><br />
Retaining Structures<br />
Services Special Constructions Rockfall/ Avalanche Protection
J. KRISMER Handelsgesellschaft m.b.H<br />
A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />
E-mail: office@krismer.at | http://www.krismer.com<br />
For the integration of the <strong>Krismer</strong> System® at the embankment base a wire netting (type<br />
Maccaferri, mesh size 50/70 mm, width = 4 m) and about that a layer of geotextile<br />
(grammature 200 g/m ², width = 2 m) was laid along the riprapping. By means of sack<br />
gabions (fig. 5) the wire netting and the geotextile were weighted.<br />
The wire netting had to show a river-sided excess end of 2-3 m, so that it could be folded after<br />
integration of the <strong>Krismer</strong> System® (back-sided of the sack gabions) about the sack gabions<br />
and be fastened at the three-dimensional J.K.S. panels.<br />
The steady integration of the system is guaranteed by the high extra load of the sack<br />
gabions.<br />
Besides, sack gabions were laid on the stone wall (riprapping) along the whole length. They<br />
have the function to prevent a possible erosion of the embankment surface by the water due<br />
to gaps between the coarse block stones.<br />
Fig. 6: Wire netting, geotextile and sack gabions were used for the integration<br />
of the <strong>Krismer</strong> System® at the embankment base<br />
MAIN DRAINAGE CHANNEL - BRANZOLL 7 / 13<br />
© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />
Slope/ Embankment Stabilisation<br />
Hydraulic Engineering/ <strong>Drainage</strong><br />
Retaining Structures<br />
Services Special Constructions Rockfall/ Avalanche Protection
J. KRISMER Handelsgesellschaft m.b.H<br />
A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />
E-mail: office@krismer.at | http://www.krismer.com<br />
The step-by-step installation of the whole embankment stabilisation system proceeded as<br />
follows:<br />
First of all, the embankment surface was cleaned. Uneven terrains were filled-up. Then the<br />
geotextile was laid as a lowest layer (fig. 7) on the embankment surface. This serves to<br />
prevent a wash-out of fine parts.<br />
The geotextiles (width = 4 m) were overlapped 20 cm at the longitudinal-sided joining. In the<br />
course of that the excess end of the geotextile which was used for the system integration on<br />
the embankment base was also overlapped by these geotextiles.<br />
Fig. 7: Installation of the geotextile on the embankment surface<br />
After a low follow-up time the installation team started to join the single J.K.S. panels<br />
longitudinally and laterally to bigger units at the level area which is bordering to the<br />
embankment.<br />
These units were laid on the geotextile (fig. 8, 9) and interconnected with rust-free wire<br />
binding loops, by overlapping. Besides, it was to be paid attention to the fact that the J.K.S.<br />
panels are laid on the embankment crosswise to the fall line and against the flow direction of<br />
the watercourse (fig. 9).<br />
The steady anchorage in the subsoil occurred by means of special T-steel nails which were<br />
rammed into the subsoil.<br />
For the rise of the compound effect of the <strong>Krismer</strong> System®, distribution rods were inserted<br />
consecutively in the J.K.S. panels.<br />
MAIN DRAINAGE CHANNEL - BRANZOLL 8 / 13<br />
© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />
Slope/ Embankment Stabilisation<br />
Hydraulic Engineering/ <strong>Drainage</strong><br />
Retaining Structures<br />
Services Special Constructions Rockfall/ Avalanche Protection
J. KRISMER Handelsgesellschaft m.b.H<br />
A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />
E-mail: office@krismer.at | http://www.krismer.com<br />
Fig. 8: Installation of the J.K.S. panels, pre-assembled to bigger units<br />
Fig. 9: Laying the units of the J.K.S. panels crosswise to the fall line of the<br />
embankment and against the flow direction of the watercourse<br />
MAIN DRAINAGE CHANNEL - BRANZOLL 9 / 13<br />
© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />
Slope/ Embankment Stabilisation<br />
Hydraulic Engineering/ <strong>Drainage</strong><br />
Retaining Structures<br />
Services Special Constructions Rockfall/ Avalanche Protection
J. KRISMER Handelsgesellschaft m.b.H<br />
A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />
E-mail: office@krismer.at | http://www.krismer.com<br />
Fig. 10: Ramming of the ground nails<br />
Ramming of the ground nails took<br />
place after a defined raster which<br />
was calculated - as well as the nail<br />
lengths - according to the static<br />
requirements<br />
Fig. 11: Integration of the <strong>Krismer</strong> System® into the adjacent area (border zone)<br />
MAIN DRAINAGE CHANNEL - BRANZOLL 10 / 13<br />
© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />
Slope/ Embankment Stabilisation<br />
Hydraulic Engineering/ <strong>Drainage</strong><br />
Retaining Structures<br />
Services Special Constructions Rockfall/ Avalanche Protection
J. KRISMER Handelsgesellschaft m.b.H<br />
A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />
E-mail: office@krismer.at | http://www.krismer.com<br />
At the top of the embankment the complete system was integrated into the border zone on<br />
a width of about 1.5 m. Along the tear-off edge the J.K.S. panels were fastened with earth<br />
nails in the distance of approx. 1 m.<br />
The application of the <strong>Krismer</strong> System® for the embankment stabilisation enables a surface<br />
drainage. For this the concept of the system intends a filling of the J.K.S. panels with gravel<br />
(grain size 32/60 mm). These works were carried out with an excavator from the terrain<br />
bordering to the embankment.<br />
Afterwards the J.K.S. panels were filled with humus.<br />
The sowing took place by use of mineral as well as biological (long time)fertiliser. The plant<br />
growth should be thereby accelerated and a quick rooting be reached what leads to an<br />
additional strengthening of the erosion protection.<br />
At customer's option it was renounced the installation of the cover net.<br />
Fig. 12: Filling of gravel and humus<br />
into the J.K.S. panels with<br />
an excavator<br />
MAIN DRAINAGE CHANNEL - BRANZOLL 11 / 13<br />
© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />
Slope/ Embankment Stabilisation<br />
Hydraulic Engineering/ <strong>Drainage</strong><br />
Retaining Structures<br />
Services Special Constructions Rockfall/ Avalanche Protection
J. KRISMER Handelsgesellschaft m.b.H<br />
A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />
E-mail: office@krismer.at | http://www.krismer.com<br />
Fig. 13: Embankment stabilisation with the <strong>Krismer</strong> System® (03/2004)<br />
A year after finishing the construction work a post-fertilisation of the embankment surface<br />
took place. This serves for the fact that an even steadier and compact sward can be formed<br />
(fig.13).<br />
MAIN DRAINAGE CHANNEL - BRANZOLL 12 / 13<br />
© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />
Slope/ Embankment Stabilisation<br />
Hydraulic Engineering/ <strong>Drainage</strong><br />
Retaining Structures<br />
Services Special Constructions Rockfall/ Avalanche Protection
J. KRISMER Handelsgesellschaft m.b.H<br />
Stabilisation<br />
A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />
E-mail: office@krismer.at | http://www.krismer.com<br />
Embankment<br />
Results Slope/<br />
In the course of the extension of the main drainage channel <strong>Branzoll</strong> the <strong>Krismer</strong> System® for<br />
the stabilisation of the embankment was applied.<br />
Up to the present the following effects could be achieved as a verifiable result of this<br />
construction measure:<br />
• sustainable protection of the embankment from erosion<br />
• the excellent compound effect and the stable construction of the J.K.S. panels counteract<br />
the flow pressure optimally<br />
• the carried out embankment stabilisation drains perfect and prevents a high formation of<br />
flow pressure<br />
• the stabilised layer of top soil forms the base for a lasting growth<br />
• the application of the <strong>Krismer</strong> System® enabled carrying out the embankment stabilisation<br />
very well with an inclination of 45°, so that several hectares of valuable cultural landscape<br />
could be won<br />
Fig. 14: <strong>Main</strong> drainage channel - <strong>Branzoll</strong> (03/2004)<br />
MAIN DRAINAGE CHANNEL - BRANZOLL 13 / 13<br />
© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />
Hydraulic Engineering/ <strong>Drainage</strong><br />
Retaining Structures<br />
Services Special Constructions Rockfall/ Avalanche Protection