Chapter 4 / Adaptations to <strong>the</strong> project plan<br />
The project did achieved its goals, though it was a fascinating challenge, since <strong>the</strong> goals<br />
were high, compromises were not acceptable <strong>for</strong> <strong>the</strong> project partners, <strong>the</strong> environment was<br />
dynamic and <strong>the</strong> processes relatively new. During <strong>the</strong> project work and <strong>the</strong> consultations<br />
some adaptations had to be made ensuring <strong>the</strong> project outcomes realisation, in some cases<br />
with ra<strong>the</strong>r higher quality than planned. The work was adjusted to <strong>the</strong> new circumstances<br />
and environment. This did not require significant changes in <strong>the</strong> budget planning, but in <strong>the</strong><br />
focus of <strong>the</strong> activities envisaged and <strong>the</strong> time booked <strong>for</strong> <strong>the</strong>m. There were also some<br />
fluctuations in <strong>the</strong> persons involved, but <strong>the</strong>y were successfully compensated.<br />
There was a moment when <strong>the</strong> team in DKM lacked a Project Assistant. That caused work<br />
to progress <strong>for</strong> a while slower than planned. Later, luckily an experienced Turkish biologist<br />
and conservationist have joined <strong>the</strong> project <strong>for</strong> <strong>the</strong> final 6 months, which ensured <strong>the</strong><br />
successful completion of <strong>the</strong> work as quality and time planning.<br />
Development of <strong>the</strong> digital data set has been a huge, undertaking which has taken longer<br />
than anticipated to finalise – this has been due both to <strong>the</strong> size of <strong>the</strong> data set (more than<br />
70 000 records) and <strong>the</strong> number of errors inherent within it. Work on error correction<br />
continued longer than planned, but was finalized well on time enabling to deliver <strong>the</strong> o<strong>the</strong>r<br />
project results depending on it.<br />
The Red List, arguably <strong>the</strong> most important output of <strong>the</strong> whole project, has involved many<br />
un<strong>for</strong>eseen tasks and thus delays. First <strong>the</strong>re was <strong>the</strong> need to develop a single updated<br />
checklist from <strong>the</strong> three available; <strong>the</strong>n <strong>the</strong>re was <strong>the</strong> issue of accessing new data and<br />
knowledge of <strong>the</strong> rarer butterflies in order to assess threat status without <strong>the</strong> support of<br />
Turkey’s most experienced lepidopterists; finally <strong>the</strong>re was <strong>the</strong> important issue of ensuring<br />
that <strong>the</strong> species assessments followed IUCN’s guidelines and criteria in order that <strong>the</strong><br />
endemic species assessments were to a standard acceptable <strong>for</strong> IUCN’s global list. All of<br />
<strong>the</strong>se issues have been resolved very satisfactorily but have inevitably resulted in delays to<br />
o<strong>the</strong>r related activities.<br />
The desire to communicate <strong>the</strong> work and involve actively <strong>the</strong> important Turkish authorities<br />
in <strong>the</strong> development and launch of <strong>the</strong> project outputs, particularly <strong>the</strong> Red List, also caused<br />
delays in <strong>the</strong> first half of 2010 when we were still hopeful and expected a positive outcome.<br />
Given <strong>the</strong> way support <strong>for</strong> nature conservation is slowly developing in Turkey, putting more<br />
ef<strong>for</strong>t into increasing <strong>the</strong> number of butterfly watchers (see verifiable indicators) will<br />
contribute little to <strong>the</strong> establishment of <strong>the</strong> dedicated and capable group of butterfly<br />
fieldworkers which DKM and <strong>the</strong> project require. Our ef<strong>for</strong>ts had to focus on maintaining<br />
and developing <strong>the</strong> core group so that in time <strong>the</strong>y will mature and develop as future role<br />
models through which <strong>the</strong> network can grow.<br />
In Turkey’s changing political climate it was considered vital that <strong>the</strong> project’s most<br />
authoritative and internationally recognised output – <strong>the</strong> national Red List – should be made<br />
widely available. The aims were to ensure that it received serious attention at all levels<br />
within Turkey, and to make it available internationally <strong>for</strong> peer review and endorsement.<br />
Thus, adjustments were agreed <strong>for</strong> <strong>the</strong> final product. The project had planned to produce a<br />
provisional red list, and to make it available electronically. The decision was made to<br />
prepare a final list, ensuring its approval through <strong>the</strong> involvement of international experts in<br />
writing detailed species assessments, to publish it electronically in Turkish and English, to<br />
print 2000 copies as a Red Book (in Turkish), and to launch it toge<strong>the</strong>r with influential<br />
partners, like <strong>the</strong> Dutch Embassy and <strong>the</strong> EU delegation in Turkey. Some adjustments were<br />
made to <strong>the</strong> work plan to ensure that this change did not affect any of <strong>the</strong> o<strong>the</strong>r project<br />
outputs, nei<strong>the</strong>r <strong>the</strong> agreements regarding <strong>the</strong> financial frames.<br />
DE VLINDERSTICHTING & BCE <strong>2011</strong> | Butterfly Conservation in Turkey – <strong>Final</strong> report <strong>2011</strong> 57