23.09.2012 Views

JIB CRANES WITH AN ARTICULATED ARM MANUALLY ROTATED

JIB CRANES WITH AN ARTICULATED ARM MANUALLY ROTATED

JIB CRANES WITH AN ARTICULATED ARM MANUALLY ROTATED

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DONATI SOLLEVAMENTI S.r.l. - Via Roma, 55 - 21020 Daverio (VA) - Tel. 0332 942611 - Fax. 0332 948597<br />

4.3.6 Assembly of the electric system with the connector block<br />

For the assembly of the electric system proceed as follows:<br />

§ “Column” version – CBB series:<br />

4. Connect to the terminals 4 contained in the connector block the electric cable 1 and the cable of line L<br />

(inserted previously in the column- see 4.3.3 – Assembly column) - ( fig.42 ).<br />

§ “Wall” version – MBB series:<br />

1. Connect the electric cable 1 to the terminals 4 contained in the connector block,to be applied to the<br />

column or load-bearing wall and to which the cable of line L coming from the power supply will be<br />

connected ( fig.43 ).<br />

fig.42<br />

fig.43<br />

30<br />

fig.44<br />

The user or installer assigned by the user must:<br />

• install, in the immediate vicinity of the crane, a line switch, protected against short circuits,<br />

showing its function with the appropriate label.<br />

• Have earthing connected, to the structure of the crane, corresponding to the handling points<br />

for this purpose

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!