DONATI SOLLEVAMENTI S.r.l. - Via Roma, 55 - 21020 Daverio (VA) - Tel. 0332 942611 - Fax. 0332 948597<br />

4.3.5 Assembly of the arms –For CBB column-mounted cranes and MBB wall-mounted cranes<br />

For the assembly of the arms proceed as follows:<br />

1. Sling the arm, using strips made of textile fibre arranged in a “loop”, corresponding to the handling<br />

points shown on the labelling and lift with suitable means ( overhead travelling crane, travelling crane,<br />

etc.). Keep the girder horizontal to the round and constantly check the stability of the slinging which<br />

must not move from the handling point. Avoid oscillations and swinging and, if necessary, to maintain<br />

the equilibrium use a rope tied to the ends of the arm.<br />

2. Line the arm up with the plates (of the bracket or column) and position in the upper part of the tube<br />

the bearing 1 the upper bearing pressure plate 8 and the clutch plate 9 with the clutch disc 12 (glued<br />

on the disc) against the tube, making sure at the same time that the bearing and the lower bearing<br />

support 14 fit into the lower part (fig.38 ).<br />

Fig.38<br />

3. Insert the tube between the plates 4 until the rotation axis of the tube coincides with that of of the<br />

plates and insert the rotation pivots 5, after lubricating them with grease ( fig.39 ).<br />