DONATI SOLLEVAMENTI S.r.l. - Via Roma, 55 - 21020 Daverio (VA) - Tel. 0332 942611 - Fax. 0332 948597<br />

4. - H<strong>AN</strong>DLING - INSTALLATION - PUTTING INTO OPERATION<br />

4.1 - General notes at delivery<br />

• The manually rotated jib cranes of the CBB column-mounted version and the<br />

MBB wall-mounted version, are delivered not assembled, in their main parts<br />

which are the column or bracket, the arm, the electric system and, when part<br />

of the supply, the lifting unit.<br />

• The user must therefore proceed to the phases of installation of the jib crane<br />

following the instructions contained in this chapter and assigning if possible<br />

the assembly to specialised installers.<br />

• The operations described in this chapter, because of their delicacy and<br />

importance, can cause, if badly performed, grave safety risks in particular<br />

for persons exposed during the installation and use phases of the jib crane.<br />

• In any case, the operations must be carried out by professionally qualified<br />

staff who specialise in industrial construction installing, with knowledge in<br />

electromechanics, equipped with work equipment and personal protection<br />

conforming to the current safety and accident prevention legislation in the<br />

workplace, and who have first read carefully this publication.<br />

On receiving the supplied goods check and ensure that :<br />

• The despatch data (receiver’s address n° of items, n° of order, etc.) correspond to the<br />

accompanying documentation (transport documents and/or related packing-list).<br />

• Technical/legal documentation which comes with the jib crane includes (fig 8):<br />

• The instruction manual for the use of the crane to be installed.<br />

• The CE declaration of Conformity or, alternatively, the Manufacturer’s Declaration.<br />

• The control register, when provided.<br />

• The instructions for the use of the hoist/trolley to be installed on the crane, if included in the supply.<br />

• The packing, if it is part of the supply, is in good condition, in one piece and free from damage.<br />

In case of damage or missing parts tell the courier, note it on the accompanying<br />

document and notify DONATI SOLLEVAMENTI S.r.l. within eight days of receiving the<br />

goods.<br />

fig.8<br />