23.09.2012 Views

JIB CRANES WITH AN ARTICULATED ARM MANUALLY ROTATED

JIB CRANES WITH AN ARTICULATED ARM MANUALLY ROTATED

JIB CRANES WITH AN ARTICULATED ARM MANUALLY ROTATED

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DONATI SOLLEVAMENTI S.r.l. - Via Roma, 55 - 21020 Daverio (VA) - Tel. 0332 942611 - Fax. 0332 948597<br />

INDEX<br />

1. PRELIMINARY INFORMATION 1<br />

1.1 Contents and use of the manual 1<br />

1.2 Symbols: meaning and use 1<br />

1.3 Co-operation with the user 2<br />

1.4 Conformity with safety regulations 2<br />

1.5 The manufacturer’s responsibility and the warranty 3<br />

2. DESCRIPTION OF THE MACHINE <strong>AN</strong>D TECHNICAL INFORMATION 4<br />

2.1 The manually rotated jib cranes with an articulated arm 4<br />

2.1.1 Intended use - Foreseen use - Designated use 4<br />

2.1.2 Constraints when installing 4<br />

2.1.3 The composition of the jib cranes 4<br />

2.2 Technical information and service conditions 7<br />

2.2.1 Safety reference list 7<br />

2.2.2 Protection and insulation of electrical parts 7<br />

2.2.3 Electrical power supply 7<br />

2.2.4 Environment conditions of use 7<br />

2.2.5 Noise - Vibrations 8<br />

2.2.6 Criteria of use and conditions of use 8<br />

2.2.7 Characteristics and technical data - Weights - Reactions on constraints 9<br />

3. SAFETY <strong>AN</strong>D ACCIDENT PREVENTION 13<br />

3.1 Qualifications of qualified operators 13<br />

3.2 General safety regulations 14<br />

3.3 Safety symbols 14<br />

3.4 Warning about remaining risks 16<br />

3.5 Safety measures and instructions 17<br />

3.5.1 Control devices 17<br />

3.5.2 Safety and emergency devices 17<br />

3.5.3 Warning and signalling devices - List of labels 18<br />

4. H<strong>AN</strong>DLING - INSTALLATION - PUTTING INTO OPERATION 19<br />

4.1 General notes at delivery 19<br />

4.2 Packing, transportation and handling 20<br />

4.2.1 Standard packing 20<br />

4.2.2 Transportation 20<br />

4.2.3 Handling 21<br />

4.2.4 Removing the packing and/or check of the crane parts 21<br />

4.3 Installation of the jib crane 22<br />

4.3.1 Duties and responsibilities of the installer 22<br />

4.3.2 Preparing the place of installation 23<br />

4.3.3 Assembly of the column – For CBB column-mounted cranes 24<br />

4.3.4 Assembly of the bracket – For MBB wall-mounted cranes 26<br />

4.3.5 Assembly of the arm – For CBB column-mounted cranes and MBB wall-mounted cranes 28<br />

4.3.6 Assembly of the electric system with the connector block 30<br />

4.3.7 Assembly of the trolley/hoist 31<br />

4.4 Putting the machine into operation 32<br />

4.4.1 Preliminary operations – Adjustments and test runs 33<br />

4.4.2 Inspection of the jib crane – Suitability for use 33<br />

4.5 Out of service 34<br />

4.5.1 Storage and conservation of parts 36<br />

4.5.2 Reuse after storage 36<br />

4.1 General notes at delivery 36<br />

II<br />

Pag.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!