22.09.2012 Views

Project Report Stabilisation of a Steep Slope - Krismer

Project Report Stabilisation of a Steep Slope - Krismer

Project Report Stabilisation of a Steep Slope - Krismer

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: <strong>of</strong>fice@krismer.at | http://www.krismer.com<br />

Afterwards the top soil was filled into the J.K.S. panels using the dry spraying method.<br />

Fig. 6: Filling the top soil by means <strong>of</strong> the spraying machine<br />

The spraying machine was filled with dry, prepared top soil which is carried with compressed<br />

air through the conveyor tubes and is mixed at the nozzle with the necessary amount <strong>of</strong><br />

water.<br />

The resultant soil-water mixture is blown by means <strong>of</strong> compressed air into the J.K.S. panels, is<br />

compressed thereby and remains adhere in this manner on a continuing basis.<br />

SLOPE STABILISATION - COUNTY ROAD K 1897 8 / 15<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

<strong>Slope</strong>/ Embankment <strong>Stabilisation</strong><br />

Services Special Constructions Rockfall/ Avalanche Protection<br />

Retaining Structures Hydraulic Engineering/ Drainage

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!