Project Report Stabilisation of a Steep Slope - Krismer
Project Report Stabilisation of a Steep Slope - Krismer
Project Report Stabilisation of a Steep Slope - Krismer
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
J. KRISMER Handelsgesellschaft m.b.H<br />
A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />
E-mail: <strong>of</strong>fice@krismer.at | http://www.krismer.com<br />
Afterwards the top soil was filled into the J.K.S. panels using the dry spraying method.<br />
Fig. 6: Filling the top soil by means <strong>of</strong> the spraying machine<br />
The spraying machine was filled with dry, prepared top soil which is carried with compressed<br />
air through the conveyor tubes and is mixed at the nozzle with the necessary amount <strong>of</strong><br />
water.<br />
The resultant soil-water mixture is blown by means <strong>of</strong> compressed air into the J.K.S. panels, is<br />
compressed thereby and remains adhere in this manner on a continuing basis.<br />
SLOPE STABILISATION - COUNTY ROAD K 1897 8 / 15<br />
© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />
<strong>Slope</strong>/ Embankment <strong>Stabilisation</strong><br />
Services Special Constructions Rockfall/ Avalanche Protection<br />
Retaining Structures Hydraulic Engineering/ Drainage