J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: <strong>of</strong>fice@krismer.<strong>at</strong> | http://www.krismer.com<br />

<strong>Project</strong> <strong>Report</strong><br />

<strong>Channel</strong> <strong>Lining</strong> <strong>at</strong> <strong>the</strong> <strong>Bank</strong> <strong>of</strong> <strong>the</strong> <strong>River</strong> Traun<br />

in Schleißheim near Wels<br />

Fig. 1: Stabilised terrain - lower section<br />

(View from <strong>the</strong> river Traun up to <strong>the</strong> forest street)<br />

CHANNEL LINING AT THE BANK OF THE RIVER TRAUN 1 / 18<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilis<strong>at</strong>ion<br />

Hydraulic Engineering/ Drainage<br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: <strong>of</strong>fice@krismer.<strong>at</strong> | http://www.krismer.com<br />

General project d<strong>at</strong>a Slope/ Embankment Stabilis<strong>at</strong>ion<br />

Client Energie AG Oberösterreich,<br />

4020 Linz, Oberösterreich<br />

Design Horst Felbermayr Bau GmbH<br />

Machstraße 7 , 4600 Wels<br />

J. <strong>Krismer</strong> Handelsgesellschaft m.b.H.<br />

Execution <strong>of</strong> constructing Horst Felbermayr Bau GmbH<br />

Machstraße 7 , 4600 Wels<br />

Setting <strong>of</strong> tasks <strong>Lining</strong> <strong>of</strong> a deep erosion trench in <strong>the</strong> area between <strong>the</strong> country<br />

road to Weisskirchen and <strong>the</strong> bank <strong>of</strong> <strong>the</strong> river Traun near<br />

Schleißheim/ Wels<br />

Constructing a stabilised slope drainage and a fastened channel<br />

in a steep slope to drain <strong>of</strong>f surface w<strong>at</strong>er <strong>of</strong> <strong>the</strong> road down to<br />

<strong>the</strong> river Traun<br />

Construction method The existing erosion trench was extended to a drainage trench<br />

which was reinforced with <strong>Krismer</strong>® System. The trench has a<br />

draining channel in <strong>the</strong> form <strong>of</strong> a trough situ<strong>at</strong>ed above it, with a<br />

surface stabilis<strong>at</strong>ion also out <strong>of</strong> <strong>Krismer</strong>® System.<br />

Execution time Spring to Summer 2000<br />

<strong>Project</strong> volume Total length <strong>of</strong> <strong>the</strong> channel measured inclined: ~ 117 m<br />

Total surface to be reconstructed: ~ 700 m²<br />

Width <strong>of</strong> <strong>the</strong> draining trench: ~ 0.6 - 1.2 m<br />

Total width <strong>of</strong> <strong>the</strong> channel: ~ 6 m<br />

Angle <strong>of</strong> gradient <strong>of</strong> <strong>the</strong> slope or channel: ~ 40°<br />

Vertical height (difference <strong>of</strong> level river- street): ~ 75 m<br />

CHANNEL LINING AT THE BANK OF THE RIVER TRAUN 2 / 18<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Hydraulic Engineering/ Drainage<br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: <strong>of</strong>fice@krismer.<strong>at</strong> | http://www.krismer.com<br />

Initial Situ<strong>at</strong>ion Slope/ Embankment Stabilis<strong>at</strong>ion<br />

To maintain a secure use <strong>of</strong> <strong>the</strong> street <strong>the</strong> occurring rain and snow w<strong>at</strong>er is drained <strong>of</strong>f <strong>the</strong><br />

street through a small l<strong>at</strong>eral inclin<strong>at</strong>ion into parallel running longitudinal draining facilities on<br />

<strong>the</strong> side, most <strong>of</strong>ten draining troughs or spherical shell channels.<br />

Coming from st<strong>at</strong>utory regul<strong>at</strong>ions <strong>the</strong> w<strong>at</strong>er has to be brought back again into <strong>the</strong> n<strong>at</strong>ural<br />

circle <strong>of</strong> <strong>the</strong> w<strong>at</strong>er. Mostly this happens immedi<strong>at</strong>ely where possible through l<strong>at</strong>erally passing<br />

<strong>the</strong> w<strong>at</strong>er out into <strong>the</strong> surrounding terrain. In <strong>the</strong> surrounding terrain <strong>the</strong> w<strong>at</strong>er should ooze<br />

away.<br />

On account <strong>of</strong> <strong>the</strong> global clim<strong>at</strong>e changes and <strong>the</strong> increase <strong>of</strong> extreme we<strong>at</strong>her caprioles<br />

conditioned <strong>the</strong>reby, <strong>the</strong> frequency and amplitude <strong>of</strong> extreme rain and snow fall incidents<br />

has strongly increased in wide parts <strong>of</strong> Europe during <strong>the</strong> past years. Also <strong>the</strong> street draining<br />

facilities are immedi<strong>at</strong>ely affected <strong>of</strong> this. They can not ooze away <strong>the</strong> big quantities <strong>of</strong> rain<br />

and snow w<strong>at</strong>er in <strong>the</strong> surrounding terrain without causing damages as initially planed.<br />

In <strong>the</strong> here mentioned project „Traunufer/ Wels“ <strong>the</strong> draining <strong>of</strong>f <strong>the</strong> w<strong>at</strong>er from <strong>the</strong> street into<br />

<strong>the</strong> surrounding wooded area caused an always deeper eroding trench because <strong>of</strong> <strong>the</strong> big<br />

quantity <strong>of</strong> <strong>the</strong> surface w<strong>at</strong>er.<br />

The terrain steeply sloping from <strong>the</strong> country road to <strong>the</strong> river Traun was eroded on a length <strong>of</strong><br />

117m up to a depth <strong>of</strong> 1.50 m. Half <strong>of</strong> <strong>the</strong> width <strong>of</strong> a forest road crossing this section was<br />

swept away by <strong>the</strong> erosion. In <strong>the</strong> sequel <strong>the</strong> forest road was unusable for <strong>the</strong> managing <strong>of</strong><br />

<strong>the</strong> forest.<br />

In this area near Wels <strong>the</strong> river Traun is used for <strong>the</strong> energy production and <strong>the</strong>refore it is<br />

dammed up to a river power st<strong>at</strong>ion. Through <strong>the</strong> erosion <strong>of</strong> <strong>the</strong> embankment <strong>the</strong> dammed<br />

w<strong>at</strong>er <strong>of</strong>ten became muddy. Because <strong>of</strong> <strong>the</strong> washed in fine sediments a damage <strong>of</strong> <strong>the</strong><br />

power st<strong>at</strong>ion equipment could not longer be excluded.<br />

Central setting <strong>of</strong> task for <strong>the</strong> reconstructing work was to elimin<strong>at</strong>e <strong>the</strong> damage in form <strong>of</strong> a<br />

very deep erosion trench, to make <strong>the</strong> forest road usable again and to construct a stable<br />

channel for <strong>the</strong> future drainage <strong>of</strong> <strong>the</strong> street w<strong>at</strong>er.<br />

The first design intended to build a coursed rock fill out <strong>of</strong> coarse river stones which would<br />

have had a single weight <strong>of</strong> approx. 1.000 up to 2.000 kg per piece.<br />

The coursed rock fill should start <strong>at</strong> <strong>the</strong> bank <strong>of</strong> <strong>the</strong> river Traun and should <strong>at</strong> least be built up<br />

to <strong>the</strong> level <strong>of</strong> <strong>the</strong> forest road. For <strong>the</strong> section above <strong>the</strong> forest road <strong>the</strong> construction <strong>of</strong> a<br />

draining pipe was planed which should have drained <strong>of</strong>f <strong>the</strong> street w<strong>at</strong>er into <strong>the</strong> coursed<br />

rock fill.<br />

This variant for <strong>the</strong> project was too expensive and too troublesome because <strong>of</strong> some<br />

problems with <strong>the</strong> basement for <strong>the</strong> coursed rock filling, <strong>the</strong> troublesome and expensive<br />

transport<strong>at</strong>ion <strong>of</strong> <strong>the</strong> stones to <strong>the</strong> constructing site (entry way was only possible on <strong>the</strong> little<br />

bearing forest road) and <strong>the</strong> technically very troublesome install<strong>at</strong>ion <strong>of</strong> <strong>the</strong> piping line in <strong>the</strong><br />

steep slope.<br />

CHANNEL LINING AT THE BANK OF THE RIVER TRAUN 3 / 18<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Hydraulic Engineering/ Drainage<br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: <strong>of</strong>fice@krismer.<strong>at</strong> | http://www.krismer.com<br />

Additionally <strong>the</strong> whole stabilis<strong>at</strong>ion work should be done without severe affects on and<br />

constant injuries to <strong>the</strong> landscape because <strong>the</strong> terrain is very good seen and is used as close<br />

recre<strong>at</strong>ion area.<br />

The mentioned situ<strong>at</strong>ion induced <strong>the</strong> constructing company Felbermayr to give a special<br />

constructing suggestion using <strong>the</strong> <strong>Krismer</strong>® System.<br />

Constructing suggestion with <strong>Krismer</strong>® System<br />

- Extension <strong>of</strong> <strong>the</strong> existing erosion trench to a drainage trench, width <strong>at</strong> least 0.60 m up to<br />

1.20m, depth <strong>at</strong> least 1.0 m to 1.50 m;<br />

- Filling up <strong>the</strong> drainage trench with easy to deliver stone m<strong>at</strong>erial in stone sizes up to maximal<br />

32 mm to 60 mm;<br />

- Stabilising <strong>of</strong> <strong>the</strong> draining body with three-dimensional steel l<strong>at</strong>tice m<strong>at</strong>s, anchored with <strong>the</strong><br />

underground with earth nails; forming a terrain trough (opening width approx. 6 m) and<br />

- stabilising <strong>of</strong> <strong>the</strong> whole trough with <strong>Krismer</strong>® System as additional possible draining facility for<br />

<strong>the</strong> street w<strong>at</strong>er in <strong>the</strong> case <strong>of</strong> a flood.<br />

- Applying humus and greening <strong>of</strong> all parts which are not permanently overflowed with w<strong>at</strong>er<br />

guaranties a perfect reintegr<strong>at</strong>ion <strong>of</strong> <strong>the</strong> construction work into <strong>the</strong> surrounding n<strong>at</strong>ural river<br />

landscape.<br />

The construction method drainage-and channel-constructing with “<strong>Krismer</strong>® System” as<br />

presented was proved to meet all <strong>the</strong>se requirements <strong>of</strong> <strong>the</strong> stabiliz<strong>at</strong>ion in a perfect way,<br />

<strong>the</strong>refore this method was executed.<br />

Fig. 2: Excav<strong>at</strong>ion work for <strong>the</strong> drainage trench, reconstructing an<br />

<strong>at</strong>tractive terrain course and constructing a terrain trough<br />

The work was realised with a cross country digger and partly<br />

manual<br />

CHANNEL LINING AT THE BANK OF THE RIVER TRAUN 4 / 18<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilis<strong>at</strong>ion<br />

Hydraulic Engineering/ Drainage<br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: <strong>of</strong>fice@krismer.<strong>at</strong> | http://www.krismer.com<br />

Drainage and <strong>Channel</strong> Constructing with <strong>Krismer</strong>® System - System Structure Slope/ Embankment Stabilis<strong>at</strong>ion<br />

Construction – middle part with underne<strong>at</strong>h laying draining trench<br />

(starting from <strong>the</strong> finished surface)<br />

- cover net: wire netting, type Maccaferri, mesh size 50/70 mm, wire size 2 mm, galvanised,<br />

fixed with steel clamps type Spenax 11 G 40<br />

- first layer (top layer) <strong>Krismer</strong>® System: three-dimensional steel l<strong>at</strong>tice m<strong>at</strong>s laid diagonally to<br />

<strong>the</strong> drop line, type J.K.S. A02-80|1,5-FEZ, height = 80 mm, fixed with special T-steel nails (with<br />

welded-on hook and point), reinforced with galvanised distribution rods Ø 10 mm, type<br />

R10/2500 or R10/3700<br />

- approx. 50 – 60 cm deep stone filling <strong>of</strong> <strong>the</strong> trench underne<strong>at</strong>h <strong>the</strong> first layer <strong>of</strong> steel l<strong>at</strong>tice<br />

m<strong>at</strong>s, stone sizes 32 to 60mm, quantity per running metre approx. 0,50 m³<br />

- second layer <strong>Krismer</strong>® System: three-dimensional steel l<strong>at</strong>tice m<strong>at</strong>s laid like <strong>the</strong> drop line,<br />

type J.K.S. A02-80|1,5-FEZ, height = 80 mm, fixed with special T-steel nails (with welded-on<br />

hook and point), reinforced with galvanised distribution rods Ø 10 mm, type R10/1200<br />

- approx. 50 – 60 cm deep stone filling, quantity per running metre approx. 0,50 m³<br />

- third layer <strong>Krismer</strong>® System: like second layer<br />

- geotextile, grammage approx. 200g/m²<br />

Constructing a channel – l<strong>at</strong>eral parts (left and right <strong>of</strong> <strong>the</strong> middle part)<br />

(starting from <strong>the</strong> finished surface)<br />

- approx. 3 cm humus with seeding to develop a compact sward<br />

- cover net: wire netting, type Maccaferri, mesh size 50/70 mm, wire size 2 mm, galvanised,<br />

fixed with steel clamps type Spenax 11 G 40<br />

- top layer <strong>Krismer</strong>® System: three-dimensional steel l<strong>at</strong>tice m<strong>at</strong>s laid diagonally to <strong>the</strong> drop<br />

line, type J.K.S. A02-80|1,5-FEZ, height = 80 mm, fixed with special T-steel nails (with weldedon<br />

hook and point), reinforced with galvanised distribution rods Ø 10 mm, type R10/2500 or<br />

R10/3700<br />

- stone filling <strong>of</strong> <strong>the</strong> three-dimensional J.K.S. – steel l<strong>at</strong>tice m<strong>at</strong>s with crushed stones, stone size<br />

32 to 60 mm, volume approx. 5 to 6 m³ per 100 m²<br />

- geotextile, grammage approx. 200g/m²<br />

CHANNEL LINING AT THE BANK OF THE RIVER TRAUN 5 / 18<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Hydraulic Engineering/ Drainage<br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: <strong>of</strong>fice@krismer.<strong>at</strong> | http://www.krismer.com<br />

<strong>Project</strong> Realis<strong>at</strong>ion Slope/ Embankment Stabilis<strong>at</strong>ion<br />

Fig. 3: Line <strong>of</strong> sight from <strong>the</strong> street down to <strong>the</strong> river Traun<br />

+ with finished excav<strong>at</strong>ed trench<br />

+ laid out with geotextile<br />

+ three-dimensional steel l<strong>at</strong>tice m<strong>at</strong>s (third lowest layer) laid on <strong>the</strong> trench bottom,<br />

laid out like <strong>the</strong> drop line, width approx. 0,60 m, fixed with special T-steel nails<br />

+ stone filling first layer<br />

To increase <strong>the</strong> connecting effect <strong>of</strong> <strong>the</strong> <strong>Krismer</strong>® System with <strong>the</strong> under ground additional<br />

continuous distributions rods were pushed into <strong>the</strong> three-dimensional l<strong>at</strong>tice m<strong>at</strong>s. The<br />

distribution rods with <strong>the</strong> standard length <strong>of</strong> 2500 mm were manually cut into <strong>the</strong> fitting width<br />

for <strong>the</strong> install<strong>at</strong>ion in <strong>the</strong> trench (e.g. trench width = 0.60 m - length <strong>of</strong> distribution rod = 0.55 m)<br />

CHANNEL LINING AT THE BANK OF THE RIVER TRAUN 6 / 18<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Hydraulic Engineering/ Drainage<br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: <strong>of</strong>fice@krismer.<strong>at</strong> | http://www.krismer.com<br />

Fig. 4: Line <strong>of</strong> sight from <strong>the</strong> river Traun up to <strong>the</strong> street<br />

Installing <strong>of</strong> <strong>the</strong> second layer (middle layer) <strong>of</strong> three-dimensional steel l<strong>at</strong>tice m<strong>at</strong>s on top <strong>of</strong><br />

<strong>the</strong> first layer <strong>of</strong> stone filling (approx. 50 – 60 cm deep), three-dimensional steel l<strong>at</strong>tice m<strong>at</strong>s<br />

laid out like <strong>the</strong> drop line <strong>of</strong> <strong>the</strong> slope, width approx. 1.20 – 2.40 m<br />

To increase <strong>the</strong> compound effect <strong>of</strong> <strong>the</strong> <strong>Krismer</strong>® System with <strong>the</strong> subsoil additional<br />

continuous distributions rods were pushed into <strong>the</strong> three-dimensional l<strong>at</strong>tice m<strong>at</strong>s. The<br />

distribution rods with <strong>the</strong> standard length <strong>of</strong> 2500 mm were manually cut into <strong>the</strong> fitting width<br />

for <strong>the</strong> install<strong>at</strong>ion in <strong>the</strong> trench (e.g. trench width = 1.20 m - length <strong>of</strong> distribution rod = 1.10 m)<br />

CHANNEL LINING AT THE BANK OF THE RIVER TRAUN 7 / 18<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilis<strong>at</strong>ion<br />

Hydraulic Engineering/ Drainage<br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: <strong>of</strong>fice@krismer.<strong>at</strong> | http://www.krismer.com<br />

Fig. 5: Line <strong>of</strong> sight from <strong>the</strong> river Traun up to <strong>the</strong> street<br />

Cre<strong>at</strong>ing a trough, opening width approx. 6 m<br />

Installing <strong>of</strong> <strong>the</strong> first layer (top layer) <strong>of</strong> three-dimensional steel l<strong>at</strong>tice m<strong>at</strong>s on top <strong>of</strong> <strong>the</strong><br />

second layer <strong>of</strong> stone filling approx. 0.50 m deep, laying <strong>of</strong> <strong>the</strong> steel l<strong>at</strong>tice m<strong>at</strong>s diagonally to<br />

<strong>the</strong> run <strong>of</strong> <strong>the</strong> channel (=almost <strong>the</strong> drop line <strong>of</strong> <strong>the</strong> slope) reinforced with distribution rods R<br />

10/2500 and fixed with galvanised earth-nails T 25/1500 - T 25/1800.<br />

The ramming <strong>of</strong> <strong>the</strong> nails was done with a manual guided jack hammer with special<br />

percussion <strong>at</strong>tachment.<br />

Along <strong>the</strong> edges <strong>of</strong> <strong>the</strong> trough <strong>the</strong> complete construction was tied up into <strong>the</strong> original terrain<br />

1.0 m up to 1.5 m width. Along <strong>the</strong> marginal zones <strong>the</strong> steel l<strong>at</strong>tice m<strong>at</strong>s were fixed with earth<br />

nails <strong>at</strong> a distance <strong>of</strong> approx. 1 m.<br />

CHANNEL LINING AT THE BANK OF THE RIVER TRAUN 8 / 18<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilis<strong>at</strong>ion<br />

Hydraulic Engineering/ Drainage<br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: <strong>of</strong>fice@krismer.<strong>at</strong> | http://www.krismer.com<br />

Fig. 6: Line <strong>of</strong> sight from <strong>the</strong> top to <strong>the</strong> forest road or to <strong>the</strong> river<br />

On both sides <strong>of</strong> <strong>the</strong> completed channel <strong>the</strong> parts which were tied up into <strong>the</strong> terrain are<br />

toped with humus and a cover net laid down on <strong>the</strong> whole surface.<br />

The use <strong>of</strong> <strong>Krismer</strong>® System for <strong>the</strong> construction <strong>of</strong> a channel enables an effective draining <strong>of</strong>f<br />

<strong>of</strong> surface w<strong>at</strong>er in combin<strong>at</strong>ion with a deeper lying drainage for <strong>the</strong> frost-resistant collecting<br />

and draining <strong>of</strong>f <strong>of</strong> slope w<strong>at</strong>er.<br />

CHANNEL LINING AT THE BANK OF THE RIVER TRAUN 9 / 18<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilis<strong>at</strong>ion<br />

Hydraulic Engineering/ Drainage<br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: <strong>of</strong>fice@krismer.<strong>at</strong> | http://www.krismer.com<br />

Fig. 7: Line <strong>of</strong> sight from <strong>the</strong> forest road down to <strong>the</strong> river<br />

The seeding was done with mineralogical and also with biological long-term-fertilizer. By<br />

doing this <strong>the</strong> growth <strong>of</strong> <strong>the</strong> plants should be acceler<strong>at</strong>ed and a fast and thick growing <strong>of</strong> <strong>the</strong><br />

roots should be achieved, which leads to an additional streng<strong>the</strong>ning <strong>of</strong> <strong>the</strong> protection<br />

against erosion.<br />

CHANNEL LINING AT THE BANK OF THE RIVER TRAUN 10 / 18<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilis<strong>at</strong>ion<br />

Hydraulic Engineering/ Drainage<br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: <strong>of</strong>fice@krismer.<strong>at</strong> | http://www.krismer.com<br />

Fig. 8: <strong>Bank</strong> stabilis<strong>at</strong>ion with <strong>Krismer</strong>® System (2000)<br />

One year after <strong>the</strong> completion <strong>of</strong> <strong>the</strong> construction works <strong>the</strong> channel- stabilis<strong>at</strong>ion concept<br />

with <strong>the</strong> <strong>Krismer</strong>® System requires an additional fertilizing <strong>of</strong> <strong>the</strong> bank surface.<br />

This was done and is good to form a stronger and thicker sward.<br />

CHANNEL LINING AT THE BANK OF THE RIVER TRAUN 11 / 18<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilis<strong>at</strong>ion<br />

Hydraulic Engineering/ Drainage<br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

Stabilis<strong>at</strong>ion<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: <strong>of</strong>fice@krismer.<strong>at</strong> | http://www.krismer.com<br />

Embankment<br />

Result Slope/<br />

In <strong>the</strong> course <strong>of</strong> <strong>the</strong> channel lining on <strong>the</strong> bank <strong>of</strong> <strong>the</strong> river Traun <strong>the</strong> <strong>Krismer</strong>® System was<br />

carried out to stabilise <strong>the</strong> terrain.<br />

As results <strong>of</strong> this construction project <strong>the</strong> following provable effects could be achieved:<br />

• long-lasting protection <strong>of</strong> <strong>the</strong> bank surface against all types <strong>of</strong> erosion<br />

• <strong>the</strong> deep reaching compound effect and <strong>the</strong> stable construction <strong>of</strong> <strong>the</strong> three-dimensional<br />

steel l<strong>at</strong>tice panels oppose optimally <strong>the</strong> tractive force <strong>of</strong> <strong>the</strong> w<strong>at</strong>er<br />

• surface securing stays w<strong>at</strong>er permeable and prevents an excessive build up <strong>of</strong> <strong>the</strong> flow<br />

pressure<br />

• <strong>the</strong> stone filling <strong>of</strong> <strong>the</strong> drainage trench decisively reduces <strong>the</strong> r<strong>at</strong>e <strong>of</strong> flow<br />

• except <strong>the</strong> installed system nails no excessive basements were necessary<br />

• <strong>the</strong> construction is insensitive for consolid<strong>at</strong>ion <strong>of</strong> <strong>the</strong> subsoil (= flexible construction)<br />

• all system components including <strong>the</strong> filling m<strong>at</strong>erial can be transported to <strong>the</strong> constructing<br />

site in <strong>the</strong> steep slope very easily<br />

• <strong>the</strong> stabilised top soil layer forms <strong>the</strong> basis for a long-lasting growing <strong>of</strong> plants<br />

• Using <strong>the</strong> <strong>Krismer</strong>® System enabled us to optimally stabilise <strong>the</strong> channel in a steep slope<br />

with an inclin<strong>at</strong>ion <strong>of</strong> 40°. Using this ecologically desirable, plant-able construction<br />

valuable n<strong>at</strong>ural landscape could be saved or a once devast<strong>at</strong>ed surface could be recultiv<strong>at</strong>ed<br />

again.<br />

CHANNEL LINING AT THE BANK OF THE RIVER TRAUN 12 / 18<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Hydraulic Engineering/ Drainage<br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: <strong>of</strong>fice@krismer.<strong>at</strong> | http://www.krismer.com<br />

Appendix: Additional Photos Slope/ Embankment Stabilis<strong>at</strong>ion<br />

CHANNEL LINING AT THE BANK OF THE RIVER TRAUN 13 / 18<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Hydraulic Engineering/ Drainage<br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: <strong>of</strong>fice@krismer.<strong>at</strong> | http://www.krismer.com<br />

CHANNEL LINING AT THE BANK OF THE RIVER TRAUN 14 / 18<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilis<strong>at</strong>ion<br />

Hydraulic Engineering/ Drainage<br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: <strong>of</strong>fice@krismer.<strong>at</strong> | http://www.krismer.com<br />

CHANNEL LINING AT THE BANK OF THE RIVER TRAUN 15 / 18<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilis<strong>at</strong>ion<br />

Hydraulic Engineering/ Drainage<br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: <strong>of</strong>fice@krismer.<strong>at</strong> | http://www.krismer.com<br />

CHANNEL LINING AT THE BANK OF THE RIVER TRAUN 16 / 18<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilis<strong>at</strong>ion<br />

Hydraulic Engineering/ Drainage<br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: <strong>of</strong>fice@krismer.<strong>at</strong> | http://www.krismer.com<br />

CHANNEL LINING AT THE BANK OF THE RIVER TRAUN 17 / 18<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilis<strong>at</strong>ion<br />

Hydraulic Engineering/ Drainage<br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection


J. KRISMER Handelsgesellschaft m.b.H<br />

A - 6020 Innsbruck - Rum | Bundesstrasse 23 | Tel. (0043) 512/ 263800 | Fax. 263819<br />

E-mail: <strong>of</strong>fice@krismer.<strong>at</strong> | http://www.krismer.com<br />

CHANNEL LINING AT THE BANK OF THE RIVER TRAUN 18 / 18<br />

© 2007 J. KRISMER Handelsgesellschaft m.b.H. • This document is protected by copyright law. All rights reserved.<br />

Slope/ Embankment Stabilis<strong>at</strong>ion<br />

Hydraulic Engineering/ Drainage<br />

Retaining Structures<br />

Services Special Constructions Rockfall/ Avalanche Protection