GOAL: Other Action Items<br />
<strong>ACTION</strong> <strong>PLAN</strong><br />
KEY STRATEGY A: Develop a Fiscal Analysis <strong>of</strong> Retention/ Cost Benefit Analysis worksheet for faculty,<br />
administrators, staff, students and other stakeholders.<br />
Description/Explanation: Assign the individual based on their experience, knowledge, availability and<br />
willingness to participate for this project. To produce a document that will clearly identify the costs and<br />
benefits <strong>of</strong> retention based on a scale <strong>of</strong> 1%, 5%, and 10% increases and decreases in enrollment. The process<br />
must be kept simple and evaluate only tuition and fee revenue. The document must be developed in a manner<br />
that all audiences involved in student engagement can understand it.<br />
IMPLEMENTATION SCHEDULE/TIMETABLE<br />
Steps Responsibility Target Date /<br />
Completion Date<br />
Assign an individual from Business Affairs to develop a<br />
cost/benefit analysis document<br />
Perform research and data analysis <strong>of</strong> data available Controller<br />
Create document to be issued with retention plan Controller<br />
Allow document to be analyzed by a mock group <strong>of</strong> constituents Controller<br />
Create final output document Controller<br />
Evaluate and analyze on a semester basis the data to fiscally<br />
measure the retention efforts <strong>of</strong> the <strong>University</strong>’s Retention Plan<br />
Coordinator: Dr. Bruno<br />
Retention Committee Contact:: Ralph Perri<br />
Budget/Reallocation Plan:<br />
No Dollars, but time will be required.<br />
Evaluation:<br />
Was the proper individual chosen?<br />
Was a document created to meet the needs <strong>of</strong> all constituents?<br />
Were the document and data available in a timely fashion?<br />
VPBA May 1<br />
Controller Oct 1<br />
Did the VPBA and the controller meet on a semester basis to revaluate the process and data?