Chapter-7<br />

the project becomes a physical fact. The Project Director is appointed, staff of all categories arranged,<br />

the detailed designs got prepared, if need be, with the assistance of consultants, contractors pre-qualified<br />

and short-listed, tenders floated <strong>for</strong> civil works, equipment, and their installation, contracts awarded, all<br />

in timeliness with the objective of initiating the operations and getting them fully underway <strong>for</strong><br />

achieving the goals envisaged without any time and cost over-run, in order that the economic benefits<br />

accrue according to the promises made in the scheme.<br />

7.2 For achievement of the stipulated targets and tangible returns, however, it is imperative to entrust the<br />

management and supervision of the project during the implementation stage to capable and competent<br />

hands of required qualifications, experience and calibre.<br />

Appointment of Project Director<br />

Activity Description Immediate<br />

Predecessor<br />

1 Pre-feasibility A -<br />

2<br />

Concept clearance (where<br />

necessary)<br />

B A<br />

3<br />

Negotiation <strong>for</strong> <strong>for</strong>eign aid/loan<br />

(where necessary)<br />

C B<br />

4 Preparation of PC-II D C<br />

5 Feasibility E D<br />

6<br />

Project <strong>for</strong>mulation/preparation<br />

of PC-I<br />

F E<br />

7 Processing/Scrutiny of the Project G F<br />

8<br />

Approval of the project by<br />

competent authority.<br />

H G<br />

9<br />

Project documents (work plan/<br />

PERT/CPM)<br />

I H<br />

10<br />

Signing of <strong>for</strong>eign loan/aid<br />

agreement+<br />

J B<br />

11 Administrative approval K H<br />

12 Allocation of funds/ADP (PLA) L H<br />

13 Release of funds* M)<br />

- Appoint of Project Director N)<br />

- Land Acquisition<br />

O)<br />

Simultaneous<br />

- Creation of Posts and<br />

appointment of staff<br />

P) activity<br />

- Appoint of consultant Q)<br />

- Detailed design preparation R)<br />

http://hd2/pc/popup/ch7_p.html<br />

Page 3 of 26<br />

9/23/2010