Chapter 4<br />

iii) Equity<br />

(b) Sponsoring Agency's Own Fund<br />

(c) Private Investment<br />

(d) Local Body Services, if any<br />

(e) Non-Government Borrowing<br />

(f) Other Sources (e.g., Recoveries)<br />

Usually <strong>for</strong>eign aid negotiations should be undertaken after a project has been approved by the competent<br />

authority or at least cleared by the Concept Clearance Committee headed by the Deputy Chairman,<br />

<strong>Planning</strong> <strong>Commission</strong>.<br />

Financial Phasing<br />

4.17 The financial phasing of a project is to be given <strong>for</strong> each financial year related to the physical work<br />

proposed to be undertaken, keeping in view the implementation of similar projects in the past. It should be<br />

as realistic as possible. Funds utilization capacity of executing agency should be kept in view while<br />

determining financial phasing of project.<br />

Physical Scheduling of Activities<br />

4.18 The scheduling of activities and availability of physical facilities are interlinked with the completion<br />

period. The availability of physical facilities e.g., (i) access road, (ii) power supply, (iii) water, gas,<br />

telephone and other utilities, (iv) education facilities, (v) housing etc., have to be ensured. The sponsoring<br />

agency has also to indicate separately what facilities would be available from the project itself and to what<br />

extent these would be available from the public utilities. The scope of work to be carried out should be<br />

gone into very thoroughly to facilitate physical and financial phasing as well as supervision.<br />

Period of Implementation<br />

4.19 Time calculated <strong>for</strong> the completion of the project should be on a realistic basis. The following factors<br />

will have to be taken into consideration to firm up the implementation period:<br />

(a) Total allocation made in the Five Year Plan.<br />

(b) Expected allocations in the PSDP, keeping in view the past experience.<br />

Page 8 of 11<br />

(c) Time to be taken in preparing the detailed design(s), invitation of tenders and award of contract(s).<br />