Chapter-9<br />

expenditures incurred after July 1, 1993 including expenditure on eligible consulting services and operating<br />

costs, <strong>for</strong>warded to the Federal SAP Secretariat and approved by IDA/World Bank. The consulting<br />

services are to be used <strong>for</strong> procurement monitoring and other assistance, needed <strong>for</strong> monitoring and<br />

evaluation. Operating costs will include costs, incurred to strengthen the SAP Secretariat and the SAP<br />

monitoring cells in the provinces, AJK and the federal areas, auditing and the costs of carrying out the<br />

household survey <strong>for</strong> SAP monitoring. These costs will include equipment and training, needed in<br />

strengthening the SAP Secretariat and monitoring cells; and the salaries subsistence, transport and other<br />

related costs of incremental staff, needed to carry out the survey; and other additional equipment required<br />

<strong>for</strong> the survey.<br />

SAP Procurement Procedures<br />

a) Procurement Guidelines<br />

Page 10 of 14<br />

9.18 In a programme of this nature, it is extremely difficult to <strong>for</strong>ecast the total amount of procurement at<br />

the outset and to categorize it into civil works, goods, and services. Most SAP procurement including all<br />

civil works is expected to involve small contracts over widely dispersed geographical areas, suitable only<br />

<strong>for</strong> local competitive bidding and proudest shopping. Some procurement, however, will be suitable <strong>for</strong><br />

international competitive bidding which will be based on the World Bank's Standard Bidding Documents.<br />

This will include vehicle, chemicals, contraceptives, some pharmaceutical products and consulting<br />

contracts. The Government agencies can request UNICEF and UNFPA to carry out some of this<br />

procurement <strong>for</strong> it, under arrangements satisfactory to IDA.<br />

9.19 During appraisal, IDA reviewed the Government's local competitive bidding procedures, already in<br />

use in ongoing IDA funded projects, and found them to be in compliance with IDA guidelines. There have<br />

been some minor shortcomings, identified in their application of the rules/procedures. The SAP Project,<br />

there<strong>for</strong>e, makes special provision <strong>for</strong> training of staff involved in procurement and monitoring<br />

procurement practices.<br />

9.20 However, in order to comply with the requirements of SAP <strong>Development</strong> Credit Agreement between<br />

GOP and IDA dated April 4, 1994, World Bank/IDA Guidelines and the Staff Appraisal Report (SAR)<br />

dated, March 8, 1994, all the departments conducting procurement of goods, services, and civil works<br />

under Social Action Programme (SAP) should follow the instructions below:-<br />

i) All procurement exceeding $ 25,000 per contract should be advertised in the National<br />

Newspapers. However, this does not exempt the procuring agencies from following the<br />

Provincial/Federal Governments rules regarding advertisement/open tender <strong>for</strong> local<br />

procurement, costing Rs 25,000 or more;<br />

http://hd2/pc/popup/ch9_p.html<br />