14. Cost <strong>In<strong>for</strong>mation</strong><br />

This section summarizes the cost estimates, as well as the methodology and assumptions<br />

used to develop the cost estimates, <strong>for</strong> the remedial alternatives defined <strong>for</strong> OU 2 and the<br />

Upper Basin portion of OU 3 as well as <strong>for</strong> the remedy protection alternatives. Costs were<br />

developed based upon principles outlined in A Guide to Developing and Documenting Cost<br />

Estimates during the Feasibility Study (USEPA, 2000b).<br />

Cost estimates <strong>for</strong> each of the remedial alternatives and remedy protection alternatives are<br />

summarized in following sections. Table B14-1 provides an overall summary of the costs <strong>for</strong><br />

each remedial alternative and remedy protection alternative. For the remedial alternatives,<br />

Alternative 3+ estimated costs range from $1,280 million <strong>for</strong> Alternative 3+(c) to $1,520<br />

million <strong>for</strong> Alternative 3+(e); and Alternative 4+ estimated costs range from $1,930 million<br />

<strong>for</strong> Alternatives 4+(b) and (c) to $2,160 million <strong>for</strong> Alternative 4+(e).<br />

These costs are presented as total capital cost, annual average and 30-year NPV O&M costs,<br />

and total 30-year NPV cost <strong>for</strong> each alternative. (For detailed cost breakdowns and<br />

assumptions, see Appendix D of the FFS Report, which is included as File 14-1 on the<br />

Supplemental CD provided with this <strong>Site</strong> <strong>In<strong>for</strong>mation</strong> <strong>Package</strong>.) NPV costs are based on a<br />

30-year planning period and a discount rate of 7 percent. The costs listed in Table B14-1 are<br />

in 2009 dollars, do not include future escalation, and assume that all construction occurs in<br />

year 1. The nominal accuracy of these estimates is –30 percent to +50 percent.<br />

14.1 Remedial Alternative Costs<br />

As described in Part B, Section 8, multiple combinations of remedial alternatives were<br />

developed and evaluated to define a comprehensive cleanup approach <strong>for</strong> Upper Basin<br />

surface water. The costs <strong>for</strong> the remedial alternatives were based on the development of<br />

TCDs (see Table B8-1 <strong>for</strong> descriptions of the TCDs).<br />

Table B14-2 summarizes the unit cost estimates <strong>for</strong> each TCD. Direct capital costs were<br />

calculated <strong>for</strong> each individual action, characterized by a TCD, on a source material. The<br />

direct capital cost was calculated using the TCD unit cost and an appropriate measurement<br />

that is specific to the site and source material. The indirect capital costs were assumed to be<br />

70 percent of the direct capital costs <strong>for</strong> all the TCDs except WT01, active treatment at the<br />

CTP. This assumption was based on in<strong>for</strong>mation provided in USEPA (2000b). O&M costs,<br />

varied by TCD, but some examples of O&M activities included repairs, sampling and<br />

analysis, and replacement of media. For TCDs retained from the 2001 FS Report (USEPA,<br />

2001d), costs were escalated to 2009 dollars assuming an escalation factor of 1.358. This<br />

value was developed from the Engineering News Record Construction and Building Cost<br />

Index (2008). For new TCDs, costs were developed by calculating unit costs <strong>for</strong> materials,<br />

labor, and equipment. These values were then summed to determine the direct capital unit<br />

cost <strong>for</strong> the TCD.<br />