30.12.2012 Views

Final Site Information Package for National Remedy Review Board ...

Final Site Information Package for National Remedy Review Board ...

Final Site Information Package for National Remedy Review Board ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SITE INFORMATION PACKAGE FOR NATIONAL REMEDY REVIEW BOARD<br />

CONTENTS<br />

List of Figures<br />

A-1 Location Map: Bunker Hill Mining and Metallurgical Complex Superfund <strong>Site</strong><br />

A-2 Focused Feasibility Study Area and Source <strong>Site</strong>s<br />

B2-1 OU 2 Removal and Remedial Actions Timeline, Bunker Hill Superfund <strong>Site</strong><br />

B2-2 OU 3 Removal and Remedial Actions Timeline, Bunker Hill Superfund <strong>Site</strong><br />

B4-1 Upper Basin Hydrology<br />

B4-2 Zinc AWQC Ratio Distribution at Selected <strong>Site</strong>s<br />

B4-3 Maximum Basin-Wide Zinc AWQC Ratios in Surface Water, Post-2002<br />

B4-4 Maximum Bunker Hill Box Zinc AWQC Ratios in Surface Water, Post-2002<br />

B4-5 Pinehurst, SF-271 Total Lead and Discharge<br />

B4-6 Basin-Wide Total Lead Concentration in Surface Water, May 2008<br />

B4-7 Dissolved Zinc Concentrations in Groundwater and Hydrogeology at Woodland Park<br />

B4-8 Dissolved Zinc Concentrations in Groundwater and Hydrogeology at Osburn Flats<br />

B4-9 Dissolved Zinc Concentrations in Groundwater and Hydrogeology in the Bunker Hill<br />

Box<br />

B8-1 Schematic Illustration of the Remedial Alternatives<br />

B9-1 Total Net Present Value Costs Versus Predicted Post-Remediation AWQC Ratios at<br />

Pinehurst<br />

B11-1 Overview of Remedial Actions, Alternative 3+, Upper SFCDR Watershed<br />

B11-2 Overview of Remedial Actions, Alternative 3+, Canyon Creek Watershed<br />

B11-3 Overview of Remedial Actions, Alternative 3+, Ninemile Creek Watershed<br />

B11-4 Overview of Remedial Actions, Alternative 3+, Big Creek Watershed<br />

B11-5 Overview of Remedial Actions, Alternative 3+, Moon Creek Watershed<br />

B11-6 Overview of Remedial Actions, Alternative 3+, Pine Creek Watershed<br />

B11-7 Overview of Remedial Actions, Alternative 3+, Mainstem SFCDR Watershed<br />

B11-8 Water Treatment Approach, Alternative 3+(d)<br />

B11-9 OU 2 Alternative (d): Stream Lining/French Drain Combination<br />

List of Tables<br />

B1-1 History of Milling and Tailings Disposal Practices in the Coeur d’Alene Basin<br />

B2-1 Summary of Ongoing Data Collection Programs in Upper Basin of the Coeur d’Alene<br />

River<br />

B4-1 Contaminants of Concern and Affected Media<br />

B4-2 Screening Level Exceedances in Affected Media<br />

B5-1 Upper Basin Community Populations<br />

B7-1 Preliminary Remediation Goals <strong>for</strong> Surface Water <strong>for</strong> Protection of Human Health and<br />

Aquatic Organisms in the Upper Coeur d’Alene Basin<br />

vi

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!