TABLE B14-1<br />

Estimated Costs Summarized by Alternative<br />

<strong>Site</strong> <strong>In<strong>for</strong>mation</strong> <strong>Package</strong> <strong>for</strong> <strong>National</strong> <strong>Remedy</strong> <strong>Review</strong> <strong>Board</strong><br />

Total Capital O&M Cost (30-<br />

O&M Cost<br />

(Annual Total Cost<br />

Alternative Description Cost Year NPV) Average) (30-Year NPV)<br />

Alternative 3+ (a) More Extensive Removal, Disposal, and<br />

Treatment w/ Minimal Stream Lining<br />

$ 1,140,000,000 $ 87,700,000 $ 7,080,000 $ 1,320,000,000<br />

Alternative 3+ (b) More Extensive Removal, Disposal, and<br />

Treatment w/ Extensive Stream Lining<br />

$ 1,110,000,000 $ 87,500,000 $ 7,060,000 $ 1,290,000,000<br />

Alternative 3+ (c) More Extensive Removal, Disposal, and<br />

Treatment w/ French Drains<br />

$ 1,100,000,000 $ 88,400,000 $ 7,140,000 $ 1,280,000,000<br />

Alternative 3+ (d) More Extensive Removal, Disposal, and<br />

Treatment w/ Stream Lining and French<br />

Drain Combination<br />

Alternative 3+ (e) More Extensive Removal, Disposal, and<br />

Treatment w/ Extensive Stream Lining and<br />

French Drain Combination<br />

Alternative 4+ (a) Maximum Removal, Disposal, and<br />

Treatment w/ Minimal Stream Lining<br />

Alternative 4+ (b) Maximum Removal, Disposal, and<br />

Treatment w/ Extensive Stream Lining<br />

Alternative 4+ (c) Maximum Removal, Disposal, and<br />

Treatment w/ French Drains<br />

Alternative 4+ (d) Maximum Removal, Disposal, and<br />

Treatment w/ Stream Lining and French<br />

Drain Combination<br />

Alternative 4+ (e) Maximum Removal, Disposal, and<br />

Treatment w/ Extensive Stream Lining and<br />

French Drain Combination<br />

Alternative RP-1 No Further Action (Post-Event Response) a<br />

$<br />

$<br />

$<br />

$<br />

1,110,000,000<br />

1,330,000,000<br />

1,690,000,000<br />

1,650,000,000<br />

$<br />

$<br />

$<br />

$<br />

89,100,000<br />

94,200,000<br />

137,900,000<br />

137,700,000<br />

$<br />

$<br />

$<br />

$<br />

7,190,000<br />

7,600,000<br />

11,130,000<br />

11,110,000<br />

$<br />

$<br />

$<br />

$<br />

1,290,000,000<br />

1,520,000,000<br />

1,970,000,000<br />

1,930,000,000<br />

$ 1,650,000,000 $ 138,600,000 $ 11,190,000 $ 1,930,000,000<br />

$<br />

$<br />

--<br />

1,660,000,000<br />

1,870,000,000<br />

$<br />

$<br />

--<br />

139,300,000<br />

144,400,000<br />

$<br />

$<br />

--<br />

11,240,000<br />

11,660,000<br />

$<br />

$<br />

1,940,000,000<br />

2,160,000,000<br />

$50,100,000<br />

Alternative RP-2 <strong>Remedy</strong> Protection Projects $ 24,600,000 $ 9,160,000 $ 401,000 $33,900,000<br />

Notes:<br />

O&M = operation and maintenance; NPV = net present value<br />

a<br />

Costs <strong>for</strong> RP-1 include expected post-event response costs based on methodology described in Memorandum: Methodology <strong>for</strong> Estimating<br />

Expected Loss from Damage to Remedies (CH2M HILL, 2009e).<br />

NOTE: The above costs are presented rounded to three significant figures.<br />

NOTE: The above cost opinion is a Feasibility Study-level estimate with a nominal accuracy of –30 percent to +50 percent (–30/+50%).<br />

NOTE: The above cost opinion is in 2009 dollars and does not include future escalation. The order-of-magnitude cost opinion shown has been<br />

prepared <strong>for</strong> guidance in project costs, actual site conditions, productivity, competitive market conditions, the final project scope, the final<br />

project schedule, and other variable factors. As a result, the final project costs will vary from those presented above. Because of these factors,<br />

funding needs must be carefully reviewed prior to making specific financial decisions or establishing final budgets.<br />

NOTE: Active treatment is not included in OU 2 Alternatives (a) and (b); there<strong>for</strong>e, total flows <strong>for</strong> Alternatives 3+(a) and<br />

3+(b) and Alternatives 4+(a) and 4+(b) will be identical.<br />

NOTE: The O&M Cost (Annual Average) is calculated by dividing the O&M Cost (30-Year NPV) by a factor of 12.409 to account <strong>for</strong> the<br />

30 years at 7%.<br />

Page 1 of 1