TABLE B9-1b<br />

Comparative Analysis of Alternatives 4+(a) through 4+(e)<br />

<strong>Site</strong> <strong>In<strong>for</strong>mation</strong> <strong>Package</strong> <strong>for</strong> <strong>National</strong> <strong>Remedy</strong> <strong>Review</strong> <strong>Board</strong><br />

Notes:<br />

Criteria<br />

OU 2 Alternative (a)<br />

Minimal Stream Lining<br />

OU 2 Alternative (b)<br />

Extensive Stream Lining<br />

OU 3 Component<br />

Alternative 4+: Maximum Removal, Disposal, and Treatment<br />

OU 2 Component<br />

OU 2 Alternative (c)<br />

French Drains<br />

OU 2 Alternative (d)<br />

Stream Lining/French Drain Combination<br />

OU 2 Alternative (e)<br />

Extensive Stream Lining/French Drain<br />

Combination<br />

Combined Upper Basin Alternative<br />

Alternative 4+(a) Alternative 4+(b) Alternative 4+(c) Alternative 4+(d) Alternative 4+(e)<br />

a O&M costs over 30 years in current dollars, assuming a 7% discount factor.<br />

b Total NPV cost equals the total equivalent cost of the alternative over 30 years in current dollars, assuming a 7% discount factor.<br />

c This assumes a rough estimated range of $15M/yr to $25M/yr of available annual funding to cover capital costs.<br />

ARARs = applicable or relevant and appropriate requirements<br />

CTP = Central Treatment Plant<br />

CWA = Clean Water Act<br />

cy = cubic yards<br />

gpm = gallons per minute<br />

LF = linear feet<br />

NPV = net present value<br />

O&M = operation and maintenance<br />

OU = Operable Unit<br />

PRG = preliminary remediation goal<br />

RAO = Remedial Action Objective<br />

SFCDR = South Fork Coeur d'Alene River<br />

SRB = sulfate-reducing bioreactor<br />

NOTE: The above costs are presented rounded to three significant figures.<br />

NOTE: The above cost opinion is a Feasibility Study-level estimate with a nominal accuracy of –30 percent to +50 percent (–30/+50%).<br />

NOTE: The above cost opinion is in 2009 dollars and does not include future escalation. The order-of-magnitude cost opinion shown has been prepared <strong>for</strong> guidance<br />

in project evaluation from the in<strong>for</strong>mation available at the time of preparation. The final costs of the project will depend on actual labor and material costs, actual site<br />

conditions, productivity, competitive market conditions, the final project scope, the final project schedule, and other variable factors. As a result, the final project costs will vary<br />

from those presented above. Because of these factors, funding needs must be carefully reviewed prior to making specific financial decisions or establishing final budgets.<br />

Page 5 of 5