TABLE B8-3<br />

Technologies and Process Options <strong>for</strong> <strong>Remedy</strong> Protection<br />

<strong>Site</strong> <strong>In<strong>for</strong>mation</strong> <strong>Package</strong> <strong>for</strong> <strong>National</strong> <strong>Remedy</strong> <strong>Review</strong> <strong>Board</strong><br />

Technology Process Option Description<br />

Creek Channel Modifications<br />

Channel Hydraulic Capacity Enlargement of cross-sectional area (widening, deepening, increasing bank height, and/or removal of material)<br />

Improvements<br />

New Channel Reroute of creek to new channel; development of new channel<br />

Channel Stabilization - Vegetation Bank stabilization (vegetation, other)<br />

Channel Stabilization - Riprap Bank stabilization (riprap)<br />

Channel Stabilization - Concrete Bank stabilization (concrete channel)<br />

Channel Realignment Change in channel alignment to remove sharp bend and improve hydraulic capacity of the channel<br />

Creek Culvert - Box Concrete box/bridge (new or replacement) <strong>for</strong> roadways and/or driveway stream crossings<br />

Creek Culvert - Pipe Installation of new pipe culverts or replace existing culverts with larger sizes<br />

Inlet and Diversion Structures<br />

Diversion Structure Diversion structure <strong>for</strong> high-flow bypass<br />

Inlet Structure New or improved existing inlet structure to collect creek flows<br />

General Drainage Improvements<br />

Stormwater Drainage Network Network of inlets, catch basins, pipes, and vaults <strong>for</strong> conveyance of local precipitation runoff; either new discharge<br />

location or tie into existing system<br />

High-Flow Bypass Drainage Network Network pipes and manholes/vaults <strong>for</strong> conveyance of creek high-flow bypass; either new discharge location or tie<br />

into existing system<br />

Drainage Network Maintenance Installation of manhole or cleanout in existing drainage system to allow <strong>for</strong> more effective cleaning and<br />

Improvements to Existing Drainage maintenance of existing infrastructure<br />

System<br />

High-Capacity Stormwater Inlet Cattle guard or oversized Department of Transportation-type inlet structure to collect runoff; tie into drainage<br />

system<br />

Rolling Dip Rolling dip on roadway surface to channel water<br />

Road Shoulder Drainage Improvements<br />

Road Shoulder - Pavement Pavement of roadway shoulder<br />

Road Shoulder - Gravel Replacement of contaminated road shoulder gravel with clean materials<br />

Road Shoulder - Armoring Placement of larger rock along road shoulder to limit scouring<br />

Paved Roadside Ditches Paved roadside ditches (asphalt); either add new ditches and/or line existing ditches with asphalt<br />

Rock-Lined Roadside Ditches Rock-lined roadside ditches with rock sized <strong>for</strong> estimated flow velocities and with check dams if necessary<br />

Inspection<br />

Curb and Gutter Curb and gutter network<br />

Rolled Curb Rolled concrete curb across driveway approaches<br />

Visual Observation and Documentation Observation and documentation of the condition of watersheds and drainage systems<br />