30.12.2012 Views

Final Site Information Package for National Remedy Review Board ...

Final Site Information Package for National Remedy Review Board ...

Final Site Information Package for National Remedy Review Board ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

[Two Updated<br />

Updated Woodland<br />

Ecological<br />

Park Components of Combined Remedial<br />

OU 2 a<br />

Alternatives from Ecological Alternatives Alternatives*<br />

the 2001 FS] 3 and 4 [Five Remedial Alternatives] [10 Action Alternatives]<br />

Alternative 3+:<br />

More Extensive<br />

Removal,<br />

Disposal, and<br />

Treatment<br />

Alternative 4+:<br />

Maximum Removal,<br />

Disposal,<br />

and Treatment<br />

Targeted source<br />

control,<br />

French drains/stream<br />

lining<br />

Alternative (a): Minimal Stream<br />

Lining<br />

+ =<br />

Equivalent to 2001 FS<br />

Ecological Alternative<br />

4, except <strong>for</strong> changes<br />

to the water treatment<br />

TCD<br />

+<br />

Alternative (b): Extensive Stream<br />

Lining<br />

Alternative (c): French Drains b<br />

Alternative (d): Stream<br />

Lining/French Drain Combination b<br />

+ =<br />

Alternative (e): Extensive Stream<br />

Lining/French Drain Combination<br />

Alternative 3+(a)<br />

Alternative 3+(b)<br />

Alternative 3+(c)<br />

Alternative 3+(d)<br />

Alternative 3+(e)<br />

Alternative 4+(a)<br />

Alternative 4+(b)<br />

Alternative 4+(c)<br />

Alternative 4+(d)<br />

Alternative 4+(e)<br />

* The five OU 2 alternatives are combined with each of the two OU 3 alternatives to <strong>for</strong>m 10 action alternatives.<br />

With the addition of the No Action Alternative, a total of 11 remedial alternatives were evaluated in the FFS<br />

Report (USEPA, 2010).<br />

FS = Feasibility Study<br />

OU = Operable Unit<br />

TCD = typical conceptual design<br />

a<br />

All the OU 2 alternatives also include the same set of actions <strong>for</strong> the Reed and Russell Tunnel adit flows: installation of a check dam<br />

to reduce or eliminate the flow of contaminated water, with a contingency plan <strong>for</strong> collection and treatment of discharge water if<br />

needed.<br />

b A limestone permeable reactive barrier (PRB) was evaluated as a potential option in place of a portion of the French drain in these<br />

alternatives (FFS Report [USEPA, 2010], Section 6.3 and Appendix F). However, based on the results of this evaluation, the PRB<br />

option has not been retained <strong>for</strong> direct inclusion in the alternatives. Additional study would be needed to further evaluate the potential<br />

effectiveness and cost of the PRB option.<br />

Figure B8-1<br />

Schematic Illustration of the Remedial Alternatives<br />

<strong>Site</strong> <strong>In<strong>for</strong>mation</strong> <strong>Package</strong> <strong>for</strong><br />

<strong>National</strong> <strong>Remedy</strong> <strong>Review</strong> <strong>Board</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!