30.12.2012 Views

Final Site Information Package for National Remedy Review Board ...

Final Site Information Package for National Remedy Review Board ...

Final Site Information Package for National Remedy Review Board ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SITE INFORMATION PACKAGE FOR NATIONAL REMEDY REVIEW BOARD<br />

PART B, SECTION 16: REFERENCES<br />

U. S. Environmental Protection Agency (USEPA). February 2000 (2000a). Bunker Hill<br />

Populated Areas Operable Unit First Five-Year <strong>Review</strong> Report.<br />

U. S. Environmental Protection Agency (USEPA). July 2000 (2000b). A Guide to Developing<br />

and Documenting Cost Estimates during the Feasibility Study.<br />

U. S. Environmental Protection Agency (USEPA). September 2000 (2000c). First Five-Year<br />

<strong>Review</strong> of the Non-Populated Area Operable Unit Bunker Hill Mining and Metallurgical Complex,<br />

Shoshone County, Idaho.<br />

U. S. Environmental Protection Agency (USEPA). April 2001 (2001a). Bunker Hill<br />

Mine Water Management Remedial Investigation/Feasibility Study.<br />

U.S. Environmental Protection Agency (USEPA). July 2001 (2001b). <strong>National</strong> <strong>Remedy</strong> <strong>Review</strong><br />

<strong>Board</strong> Presentation <strong>In<strong>for</strong>mation</strong>, Coeur d’Alene Basin Remedial Investigation/Feasibility Study.<br />

Prepared by URS Greiner and CH2M HILL <strong>for</strong> USEPA Region 10.<br />

U. S. Environmental Protection Agency (USEPA). September 2001 (2001c). <strong>Final</strong> (Revision 2)<br />

Remedial Investigation Report, Coeur d’Alene Basin Remedial Investigation/Feasibility Study.<br />

Prepared by URS Greiner and CH2M HILL <strong>for</strong> USEPA Region 10.<br />

U. S. Environmental Protection Agency (USEPA). October 2001 (2001d). <strong>Final</strong> (Revision 2)<br />

Feasibility Study Report, Coeur d’Alene Basin Remedial Investigation/Feasibility Study. Prepared<br />

by URS Greiner and CH2M HILL <strong>for</strong> USEPA Region 10.<br />

U. S. Environmental Protection Agency (USEPA). December 10, 2001 (2001e). Record of<br />

Decision Amendment: Bunker Hill Mining and Metallurgical Complex Acid Mine Drainage,<br />

Smelterville, Idaho.<br />

U. S. Environmental Protection Agency (USEPA). September 2002. Record of Decision, The<br />

Bunker Hill Mining and Metallurgical Complex Operable Unit 3.<br />

U. S. Environmental Protection Agency (USEPA). March 26, 2004. Basin Environmental<br />

Monitoring Plan, Bunker Hill Mining and Metallurgical Complex Operable Unit 3.<br />

U. S. Environmental Protection Agency (USEPA). October 2005. Five-Year <strong>Review</strong> Report:<br />

Second Five-Year <strong>Review</strong> <strong>for</strong> the Bunker Hill Mining and Metallurgical Complex Superfund <strong>Site</strong>,<br />

Operable Units 1, 2, and 3, Idaho and Washington.<br />

U.S. Environmental Protection Agency (USEPA). October 2006. OU 2 Environmental<br />

Monitoring Plan, Bunker Hill Mining and Metallurgical Complex, Shoshone County, Idaho.<br />

U. S. Environmental Protection Agency (USEPA). October 1, 2007. A Predictive Analysis of<br />

Post-Remediation Metals Loading.<br />

U.S. Environmental Protection Agency (USEPA). September 2009. Draft Data Summary<br />

Report <strong>for</strong> the Coeur d’Alene Basin Remedial Action Monitoring Program.<br />

U.S. Environmental Protection Agency (USEPA). February 2010. Draft Focused Feasibility<br />

Study Report, Upper Basin of the Coeur d’Alene River, Bunker Hill Mining and Metallurgical<br />

Complex Superfund <strong>Site</strong>.<br />

B16-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!