29.12.2012 Views

proposal part b - The Bernstein Project

proposal part b - The Bernstein Project

proposal part b - The Bernstein Project

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CIP-ICT PSP Call 4 54<br />

Pilot B<br />

[Imperialle]<br />

B3.4. Indicators<br />

<strong>The</strong> project provides the means to monitor the progress of the work at various degrees of detail and intervals:<br />

1. Core indicators – See Table 7.<br />

2. Quarterly indicators – Deliverables are good indicators, most of them being reports or internet-based<br />

services. <strong>The</strong> deliverables are distributed on a three month basis over the full project length.<br />

3. Yearly indicators – <strong>The</strong> most detailed performance assessment is the yearly report to the EU. For facilitating<br />

monitoring we have introduced a “documented self-assessment” scheme, by which the <strong>part</strong>ners themselves<br />

assess their progress and document their claims. [1] Quantitative metrics – <strong>The</strong> report details what was done<br />

during the specific period (work quantity), what is left to be done (percentage of work) and provides<br />

information about the rhythm of progress, the encountered and foreseeable difficulties, etc. (difficulty level of<br />

work). <strong>The</strong> claims are documented with screenshots of outputs, links to online software and online documents.<br />

[2] Qualitative metrics: the report explains what the functionalities of the outputs are and provides links for<br />

testing with representative samples.<br />

Table 7: Template – Indicators<br />

Indicator<br />

No.<br />

Relating to which<br />

project objective /<br />

expected result?<br />

1 O1.2 pre-processing<br />

Indicator<br />

Objects ready for<br />

scanning<br />

Method of<br />

Expected Progress<br />

measurement Year 1 Year 2 Year 3<br />

Counting (all/SMK) 20,000 45,000 45,000<br />

2<br />

O2.3 database<br />

implementation<br />

Databases working Counting (OEAW) 4 10 10<br />

3 O3.1 scanning Objects Scanned Counting (all/SMK) 5,000 45,000 45,000<br />

4 O4.1 post-processing<br />

Images postprocessed<br />

Counting (all/SMK) 100 40,000 45,000<br />

5 O4.2 metadata Metadata available Counting (all/SMK) 1,000 40,000 45,000<br />

6<br />

O4.3 database<br />

population<br />

Data in databases<br />

Database statistics<br />

(OEAW)<br />

100 20,000 45,000<br />

7 Databases online Databases online Web (TUG) 2 6 10<br />

8<br />

O5.3 <strong>Bernstein</strong><br />

connection<br />

Data available in<br />

<strong>Bernstein</strong><br />

<strong>Bernstein</strong> portal<br />

(OEAW)<br />

0 20,000 45,000<br />

9<br />

O5.4 Europeana<br />

connection<br />

Data available in<br />

Europeana<br />

Europeana portal<br />

(OEAW)<br />

0 20,000 45,000<br />

<strong>The</strong> results of performance measurement and evaluation (indicators and their values) will be <strong>part</strong> of the<br />

progress reporting to the Commission.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!