CIP-ICT PSP Call 4 48<br />
Pilot B<br />
[Imperialle]<br />
Table 6: Template – Risk assessment<br />
Description of possible risk Impact<br />
Quality of scans/metadata is<br />
insufficient according to the set<br />
standards<br />
Partner does not deliver<br />
Partner cannot deliver<br />
Key personnel loss<br />
insufficient<br />
quality<br />
data or<br />
service not<br />
delivered<br />
data or<br />
service not<br />
delivered<br />
delay and<br />
quality<br />
Probability of<br />
occurrence<br />
low<br />
low<br />
Remedial Actions<br />
1) Rework<br />
2) Escalation mechanism<br />
Escalation mechanism according to the<br />
consortium contract<br />
low Replacement of the <strong>part</strong>ner<br />
low<br />
<strong>The</strong> assigned substitute takes over the<br />
duties<br />
Imperialle is a project with a low risk probability because it is based on well-known and approved technologies<br />
and the consortium comprises specialists for conservation, paper research, digital scanning, web design, and<br />
digital libraries. Nevertheless, decision-making, conflict-solving, and contingency mechanisms have been<br />
chosen in a manner to minimize the risks and optimize the proper functioning of the project. <strong>The</strong>se mechanisms<br />
are <strong>part</strong> of the management structures described in more detail in B3.2c (<strong>Project</strong> Management). Responsibility<br />
for the project has been distributed to all <strong>part</strong>ners through the allocation of work packages and task leaderships.<br />
Several <strong>part</strong>ners are usually implicated in the realization of individual tasks, so that the progressive shifting of<br />
responsibilities is possible. <strong>The</strong> work packages and tasks have been designed to operate relatively<br />
autonomously in order to reduce their interdependencies in case a <strong>part</strong>icular product is delayed or fails to<br />
deliver.<br />
A monitoring cycle of 6 month (WP6) guarantees on-time detection of eventual delays, quality of products<br />
(scans, metadata) and other problems. All <strong>part</strong>ners will sign a consortium agreement at the beginning of the<br />
project. This consortium agreement will regulate the responsibilities and the actions to be taken if and when a<br />
contractor fails to meet a goal, and defines escalation mechanisms.<br />