29.12.2012 Views

proposal part b - The Bernstein Project

proposal part b - The Bernstein Project

proposal part b - The Bernstein Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CIP-ICT PSP Call 4 37<br />

Pilot B<br />

[Imperialle]<br />

Table 3: Template - Deliverables list<br />

Deliv. No. Deliverable title WP<br />

No.<br />

Nature Diss.<br />

level<br />

Delivery<br />

date<br />

1 D7.1 <strong>Project</strong> website 7 P PU m3<br />

2 D7.2 <strong>Project</strong> presentation (first version) 7 P PU m3<br />

3 D1.1 Digitisation rules specification 1 SP PU m6<br />

4 D1.2 Content selection report 1 R PU m6<br />

5 D8.1 Half-year progress report 8 R PU m6<br />

6 D2.1 Metadata specification (includes D.5.1) 2 SP PU m9<br />

7 D2.2 Database design specification (includes D.5.1) 2 SP PU m9<br />

8 D5.2 Architectural software design 5 R PU m12<br />

9 D8.2 Second half-year progress report. (includes D6.1) 8 R PU m12<br />

10 D8.3 First annual report. 8 R PU m12<br />

11 D1.3 Pre-processing report 1 R PU m15<br />

12 D4.1 Image processing and archival report 4 R PU m15<br />

13 D4.2 Metadata status report 4 R PU m15<br />

14 D2.3 Database implementation report 2 R PU m18<br />

15 D3.1 Digitisation report (first version) 3 R PU m18<br />

16 D5.3 <strong>Bernstein</strong> extension (first prototype) 5 P PU m18<br />

17 D8.4 Third half-year progress report (includes D4.3) 8 R PU m18<br />

18 D5.4 Integration report 5 R PU m21<br />

19 D7.3 Dissemination kit 7 P PU m21<br />

20 D5.5 OAI-PMH Implementation 5 P PU m24<br />

21 D8.5 Fourth half-year progress report (includes 6.2) 8 R PU m24<br />

22 D8.6 Second annual report 8 R PU m24<br />

23 D3.2 Digitisation report (final version) 3 R PU m27<br />

24 D4.4 Database population report (final version) 4 R PU m27<br />

25 D7.4 <strong>Project</strong> presentation (final version) 7 P PU m29<br />

26 D7.5 Exhibition report 7 R PU m29<br />

27 D7.6 <strong>Project</strong> website (final version). 7 P PU m30<br />

28 D8.7 Fifth half-year progress report. (incl. D6.3) 8 R PU m30<br />

29 D8.8 Final project report. 8 R PU m30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!