proposal part b - The Bernstein Project
proposal part b - The Bernstein Project
proposal part b - The Bernstein Project
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CIP-ICT PSP Call 4 37<br />
Pilot B<br />
[Imperialle]<br />
Table 3: Template - Deliverables list<br />
Deliv. No. Deliverable title WP<br />
No.<br />
Nature Diss.<br />
level<br />
Delivery<br />
date<br />
1 D7.1 <strong>Project</strong> website 7 P PU m3<br />
2 D7.2 <strong>Project</strong> presentation (first version) 7 P PU m3<br />
3 D1.1 Digitisation rules specification 1 SP PU m6<br />
4 D1.2 Content selection report 1 R PU m6<br />
5 D8.1 Half-year progress report 8 R PU m6<br />
6 D2.1 Metadata specification (includes D.5.1) 2 SP PU m9<br />
7 D2.2 Database design specification (includes D.5.1) 2 SP PU m9<br />
8 D5.2 Architectural software design 5 R PU m12<br />
9 D8.2 Second half-year progress report. (includes D6.1) 8 R PU m12<br />
10 D8.3 First annual report. 8 R PU m12<br />
11 D1.3 Pre-processing report 1 R PU m15<br />
12 D4.1 Image processing and archival report 4 R PU m15<br />
13 D4.2 Metadata status report 4 R PU m15<br />
14 D2.3 Database implementation report 2 R PU m18<br />
15 D3.1 Digitisation report (first version) 3 R PU m18<br />
16 D5.3 <strong>Bernstein</strong> extension (first prototype) 5 P PU m18<br />
17 D8.4 Third half-year progress report (includes D4.3) 8 R PU m18<br />
18 D5.4 Integration report 5 R PU m21<br />
19 D7.3 Dissemination kit 7 P PU m21<br />
20 D5.5 OAI-PMH Implementation 5 P PU m24<br />
21 D8.5 Fourth half-year progress report (includes 6.2) 8 R PU m24<br />
22 D8.6 Second annual report 8 R PU m24<br />
23 D3.2 Digitisation report (final version) 3 R PU m27<br />
24 D4.4 Database population report (final version) 4 R PU m27<br />
25 D7.4 <strong>Project</strong> presentation (final version) 7 P PU m29<br />
26 D7.5 Exhibition report 7 R PU m29<br />
27 D7.6 <strong>Project</strong> website (final version). 7 P PU m30<br />
28 D8.7 Fifth half-year progress report. (incl. D6.3) 8 R PU m30<br />
29 D8.8 Final project report. 8 R PU m30