29.12.2012 Views

proposal part b - The Bernstein Project

proposal part b - The Bernstein Project

proposal part b - The Bernstein Project

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CIP-ICT PSP Call 4 34<br />

Pilot B<br />

[Imperialle]<br />

B3.2a. Chosen approach<br />

<strong>The</strong> Imperialle project has a clear and rather simple structure, and carries a logical sequence of the work<br />

packages. <strong>The</strong> project’s work plan is divided into five production work-packages (WPs) and three logistic<br />

work-packages. WP1 to WP5 follow the natural steps needed for digitisation, beginning with defining the<br />

digitisation rules, evaluating the technical resources, and the selection, restoration and preparation of the objects<br />

to be digitised. <strong>The</strong>se are the tasks of WP1. WP2 includes the preparation work concerning the software,<br />

database system, and metadata. WP3 follows with the digitisation itself. In WP4 the digital images are postprocessed,<br />

and put into the databases together with the metadata. WP5 is the integration work package<br />

responsible for the inter-operability between the databases.<br />

<strong>The</strong> logistic WPs put a strong emphasis on the exploitation aspect in addition to producing output. In WP6<br />

“Assessment and Evaluation”, we want to verify, in collaboration with external users, the quality and impact of<br />

our output. WP7 “Dissemination and Sustainability” takes care of accessibility (ergonomics and graphic appeal<br />

of user interfaces and other output; quality of documentation), manages awareness activities and prepares the<br />

dissemination kit. WP8 “<strong>Project</strong> management” is responsible for the day-to-day management of the project.<br />

<strong>The</strong> majority of the technical work is in WP2, which includes the database design and web presentation of the<br />

masterpieces, and in WP5 which entails the functional extension of the <strong>Bernstein</strong> portal and the implementation<br />

of the communication protocols.<br />

Partners’ roles – Most of the <strong>part</strong>ners will contribute to all tasks or activity areas of the project. However, each<br />

has a focal interest, which is outlined below.<br />

<strong>Bernstein</strong><br />

OAI-PMH<br />

EUROPEANA <strong>Bernstein</strong><br />

EUROPEANA<br />

OAI-PMH<br />

<strong>Bernstein</strong> with Imperialle extension<br />

WILC<br />

SRU<br />

database access protocol<br />

NIKI<br />

WZMA<br />

<strong>Bernstein</strong><br />

with<br />

Imperialle<br />

PO<br />

WILC NIKI WZMA<br />

Imperialle databases<br />

PO<br />

database access protocol<br />

WILC, NIKI, WZMA, and PO<br />

are the <strong>Bernstein</strong> watermark databases:<br />

PO: Piccard Online<br />

NIKI: Watermark database of the Dutch<br />

University Institute for Art History<br />

Florence<br />

WILC: Watermarks in Incunabula<br />

Printed in the Low Countries<br />

WZMA: Watermarks of the Middle-<br />

Ages

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!