22.09.2012 Views

Complete list of references - iut.at

Complete list of references - iut.at

Complete list of references - iut.at

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Ingenieurgemeinschaft Innov<strong>at</strong>ive Umwelttechnik GmbH<br />

ISO 9001 zertifiziert<br />

R E F E R E N C E S<br />

Hamburgersiedlung 1<br />

A-2824 Seebenstein<br />

Austria<br />

www.ig-<strong>iut</strong>.<strong>at</strong><br />

e-mail: <strong>of</strong>fice@ig-<strong>iut</strong>.<strong>at</strong><br />

Tel: +43 (0) 2627 82197-0<br />

Fax: +43 (0) 2627 82197-14


Contents<br />

2<br />

Concepts, studies and assessments<br />

Waste management concepts<br />

Studies<br />

Waste and sorting analyses<br />

Expert evalu<strong>at</strong>ions<br />

Assessments according to the emission certific<strong>at</strong>es trade act<br />

Plant design and supervision <strong>of</strong> construction<br />

Mechanical waste tre<strong>at</strong>ment<br />

Biological waste tre<strong>at</strong>ment<br />

Landfills and waste storages<br />

Industrial facilities<br />

Fire prevention and safety engineering<br />

Fire prevention<br />

Explosion protection<br />

3<br />

3<br />

6<br />

15<br />

18<br />

21<br />

23<br />

23<br />

34<br />

38<br />

41<br />

43<br />

43<br />

46


Concepts, studies and surveys<br />

Waste management concepts<br />

2011<br />

2010<br />

2009<br />

2008<br />

2006<br />

2005<br />

Trügler Recycling und<br />

Transport GesmbH<br />

Fisching/A<br />

Buchhauser GmbH<br />

Voitsberg/A<br />

WSA Waste Service GmbH<br />

Hartberg/A<br />

Gaugl Metallhandel<br />

GmbH<br />

Schönau/A<br />

KAB Kärntner<br />

Abfallbewirtschaftung<br />

GmbH<br />

Klagenfurt/A<br />

ZUMA Beteiligungs GmbH<br />

& Co Abfallst<strong>of</strong>fverwertungs<br />

KG<br />

Wien/A<br />

Ministry <strong>of</strong> Infrastructure<br />

Tripolis/Libyen<br />

Intergeo<br />

Salzburg/A<br />

Zuser Umweltservice<br />

GmbH<br />

Peggau/A<br />

Neel Metal Products Ltd.<br />

Faridabad/Indien<br />

Fanalca S.A.<br />

Cali/Columbia<br />

Recycling und Transport<br />

GmbH<br />

Thersienfeld/A<br />

UNDP – Municipal<br />

Improvement and Revival<br />

Programm<br />

Vranje/South Serbia<br />

Waste mangement concept for the expansion <strong>of</strong> a waste<br />

tre<strong>at</strong>ment center from 34,999 t/a to 50,000 t/a and additional<br />

waste key numbers, activities and surfaces<br />

Waste management concept for a waste tre<strong>at</strong>ment center,<br />

consisting <strong>of</strong> a transfer st<strong>at</strong>ion, intermedi<strong>at</strong>e storage area and a<br />

mechanical waste sorting plant, capacity: 35,000 t/a<br />

Waste management concept for the reloc<strong>at</strong>ion and expansion <strong>of</strong><br />

an intermedi<strong>at</strong>e store for hazardous waste with a total capacity<br />

<strong>of</strong> 16,000 t/a<br />

Waste management concept for the construction <strong>of</strong> a scrap<br />

tre<strong>at</strong>ment plant including auxiliary equipment, a car wreck<br />

disassembling facility and a transfer st<strong>at</strong>ion for mixed<br />

construction waste, total capacity: 35,000 t/a<br />

Waste management concept for different expansions <strong>of</strong> a<br />

mechanical waste tre<strong>at</strong>ment plant with a capacity <strong>of</strong> 35,000 t/a<br />

Waste management concept for a plant to take-over and storage<br />

<strong>of</strong> wastes and construction m<strong>at</strong>erials, capacity 197,000 t/a<br />

Study <strong>of</strong> the adaption <strong>of</strong> the waste management to the European<br />

Standard for 4 districts in the Eastern Libya with 800,000<br />

inhabitants<br />

Waste tre<strong>at</strong>ment concept for the expansion <strong>of</strong> a tre<strong>at</strong>ment plant<br />

for solid recovered fuel and for bale storage with a capacity <strong>of</strong><br />

151,000 t/a, together with UV&P<br />

Pre-design („Masterplan“) and calcul<strong>at</strong>ion <strong>of</strong> the investment costs<br />

for integr<strong>at</strong>ed municipal solid waste processing facilities incl.<br />

reloading st<strong>at</strong>ion, recycling plant, composting plant and<br />

landfilling for the city Coimb<strong>at</strong>ore (Tamil Nadu, Indien), capacity<br />

219,000 t/a<br />

Pre-design („Masterplan“) and calcul<strong>at</strong>ion <strong>of</strong> the investment costs<br />

for integr<strong>at</strong>ed municipal solid waste processing facilities incl.<br />

reloading st<strong>at</strong>ion, recycling plant, composting plant and<br />

landfilling for the city Chennai (Tamil Nadu, Indien), capacity<br />

164,000 t/a<br />

Waste management concept for a complete waste management<br />

plant<br />

Pre-feasibility study for developing <strong>of</strong> waste management in the<br />

region<br />

3


4<br />

2004<br />

2003<br />

1999<br />

1998<br />

1997<br />

1996<br />

1995<br />

1993<br />

1992<br />

1991<br />

AEVG –<br />

Abfallentsorgungs- und<br />

Verwertungs GesmbH<br />

Graz/A<br />

Schlager GmbH<br />

Graz/A<br />

Zweckverband<br />

Abfallwirtschaft Zwickau<br />

Zwickau/GER<br />

Abfallwirtschaftsverband<br />

Schladming<br />

Schladming/A<br />

Abfallwirtschaftsverband<br />

Wolfsberg<br />

Wolfsberg/A<br />

AEVG Abfall-Entsorgungs-<br />

u. Verwertungs<br />

Ges.m.b.H.<br />

Graz/A<br />

Landkreis<br />

Freiberg/Sachsen<br />

Freiberg/Sachsen/GER<br />

Norikum Wohnungsbau<br />

Ges.m.b.H. & Co KG<br />

Wels/A<br />

LEG Landesentwicklungsgesellschaft<br />

Baden-<br />

Württemberg mbH/GER<br />

Amt der NÖ<br />

Landesregierung<br />

Wien/A<br />

Bezirksabfallverband<br />

Gmunden/A<br />

Bezirksabfallverband<br />

Kirchdorf a.d. Krems/A<br />

Republic Slovenia/SLO<br />

Waste management concept for the region South-Backa and Srem<br />

in Serbia in view <strong>of</strong> future EU legisl<strong>at</strong>ive regul<strong>at</strong>ions;<br />

as sub-contractor <strong>of</strong> the company Bluew<strong>at</strong>ers<br />

Evalu<strong>at</strong>ion <strong>of</strong> the waste management concept for the loc<strong>at</strong>ion <strong>of</strong><br />

a waste tre<strong>at</strong>ment plant in Graz<br />

Waste management concept for the local administr<strong>at</strong>ive body<br />

“Waste Management Zwickau”;<br />

In cooper<strong>at</strong>ion with INTECUS Dresden<br />

Waste management concept „Aich 2004“<br />

Residual waste management concept<br />

Waste management concept;<br />

In cooper<strong>at</strong>ion with Montanuniversität Leoben<br />

Concept on „Residual waste – splitting for the rural district <strong>of</strong><br />

Freiberg/Saxonia“<br />

Waste management concept, concept <strong>of</strong> logistics and design <strong>of</strong> a<br />

collection center for an apartment building, integr<strong>at</strong>ed<br />

businesses and a market hall<br />

Prepar<strong>at</strong>ion <strong>of</strong> the 3rd supplement to the waste management<br />

concept <strong>of</strong> the district <strong>of</strong> Ludwigsburg; development <strong>of</strong> the<br />

“Ludwigsburg approach” tot the tre<strong>at</strong>ment <strong>of</strong> residual waste<br />

Concept on tre<strong>at</strong>ment <strong>of</strong> residual waste and contamin<strong>at</strong>ed waste<br />

in Lower Austria;<br />

In cooper<strong>at</strong>ion with Ziv.Ing. J.Ringh<strong>of</strong>er<br />

Concept on residual waste tre<strong>at</strong>ment;<br />

In cooper<strong>at</strong>ion with Ziv.Ing. J.Ringh<strong>of</strong>er<br />

Waste management concept for the district <strong>of</strong> Gmunden/Upper<br />

Austria<br />

Sorting analyses <strong>of</strong> industrial waste and the total waste in<br />

Gmunden<br />

Waste management concept for the district Kirchdorf a.d.Krems<br />

in Upper Austria<br />

Analyses <strong>of</strong> the total waste in Kirchdorf a.d.Krems<br />

Waste management concept for the Republic <strong>of</strong> Slovenia;<br />

In cooper<strong>at</strong>ion with the companies Hidroinzeniring, Ekokemija,<br />

Saubermacher


1990<br />

1989<br />

Bezirksabfallverband<br />

Vöcklabruck/A<br />

Abfallwirtschaftsverband<br />

Feldbach<br />

Steiermark/A<br />

Abfallwirtschaftsverband<br />

Schladming/A<br />

Landr<strong>at</strong>samt Garmisch-<br />

Partenkirchen/GER<br />

W.Hamburger AG<br />

Pitten/A<br />

Grüne Tonne Niklasdorf<br />

GesmbH/A<br />

Gemeinde Kössen/A<br />

Abfallwirtschaftsverband<br />

Schladming/A<br />

Waste management concept for the district <strong>of</strong> Vöcklabruck /<br />

Upper Austria<br />

Sorting analyses <strong>of</strong> industrial waste and analyses <strong>of</strong> the total<br />

waste in Vöcklabruck<br />

Waste management concept for the district <strong>of</strong> Feldbach<br />

Analyses <strong>of</strong> residual waste and total waste in Feldbach<br />

Oper<strong>at</strong>ing plan rel<strong>at</strong>ing to waste management in the region <strong>of</strong><br />

Oberes Ennstal<br />

General study on waste management in the rural district<br />

Garmisch-Partenkirchen;<br />

In cooper<strong>at</strong>ion with the company IGW Witzenhausen<br />

Waste management concept in the district <strong>of</strong> Tulln and general<br />

study for Lower Austria<br />

Oper<strong>at</strong>ing plan for the project „Grüne Tonne Leoben”<br />

Waste management in Kaiserwinkl/Tyrol<br />

Waste management concept for the region Oberes<br />

Ennstales/Styria.<br />

5


6<br />

Studies<br />

2011<br />

2010<br />

2009<br />

Saubermacher<br />

Dienstleistungs AG<br />

Feldkirchen/A<br />

Ekokem Oy AB<br />

Riihimäki/FI<br />

Amt der Steiermärkischen<br />

Landesregierung<br />

Graz/A<br />

Thermo Team<br />

Altern<strong>at</strong>ivbrennst<strong>of</strong>fverwertungs<br />

GmbH<br />

Graz/A<br />

COWI Lietuva<br />

Vilnius/LT<br />

EUCS Ingenieurbüro<br />

GmbH<br />

Linz/A<br />

ZEMKA Ges.m.b.H.<br />

Zell am See/A<br />

Wiener Hafen GmbH<br />

Wien/A<br />

BT-Wolfgang Binder<br />

GmbH<br />

Gleisdorf/A<br />

UDB Umweltdienst<br />

Burgenland GmbH<br />

Oberpullendorf/A<br />

Feasibility study for the construction <strong>of</strong> a central tre<strong>at</strong>ment plant<br />

for fermentable wastes, with a capacity <strong>of</strong> 50,000 t/a<br />

Investig<strong>at</strong>ion <strong>of</strong> resources and technical capabilities to gener<strong>at</strong>e<br />

secondary recoverables from heterogeneous commercial waste<br />

streams<br />

Development <strong>of</strong> benchmarks for various waste tre<strong>at</strong>ment plants<br />

to identify performance levels according to previously defined<br />

framework conditions<br />

Analysis <strong>of</strong> a processing concept including an investig<strong>at</strong>ion <strong>of</strong><br />

the business processes in a multi-laned tre<strong>at</strong>ment plant in<br />

Slovenia<br />

Masterplan for the implement<strong>at</strong>ion <strong>of</strong> an SRF-tre<strong>at</strong>ment plant <strong>at</strong> a<br />

Hungarian industrial plant with a capacity <strong>of</strong> 40,000 t/a<br />

Feasibility study for the construction <strong>of</strong> a tre<strong>at</strong>ment plant for<br />

domestic and commercial wastes and a downstream ferment<strong>at</strong>ion<br />

plant for the separ<strong>at</strong>ed fine fraction<br />

Investig<strong>at</strong>ion <strong>of</strong> the technical possibilities to shred sandpaper<br />

wastes<br />

Investig<strong>at</strong>ion <strong>of</strong> mass flow streams and st<strong>at</strong>e <strong>of</strong> the art <strong>of</strong> the<br />

tre<strong>at</strong>ment plants for municipal waste in Styria<br />

Feasibility study on the minimiz<strong>at</strong>ion <strong>of</strong> the total chlorine load in<br />

the finished solid recovered fuel<br />

Feasibility study on the collection and tre<strong>at</strong>ment <strong>of</strong> biogenic<br />

wastes in the Kaunas region in Lithuania (Development <strong>of</strong> Kaunas<br />

region biodegradable waste management infrastructure)<br />

Feasibility study on the possibilities <strong>of</strong> a mechanical/biological<br />

tre<strong>at</strong>ment <strong>of</strong> 30,000 t/a <strong>of</strong> residual waste in a Czech city<br />

Feasibility study on the possibilities to redesign the biological<br />

tre<strong>at</strong>ment in a rotting hall<br />

Feasibility Study <strong>of</strong> removal optimiz<strong>at</strong>ion <strong>of</strong> the bulk m<strong>at</strong>erial<br />

storage facility<br />

Feasibility Study about the possibilities <strong>of</strong> autom<strong>at</strong>ic sorting <strong>of</strong><br />

80,000t/a <strong>of</strong> commercial wastes in Belo Horizonte in Brazil<br />

Feasibility Study <strong>of</strong> different variants <strong>of</strong> construction and plants<br />

for reducing <strong>of</strong> the odour emissions <strong>at</strong> the composting plant<br />

Föllig


2008<br />

2007<br />

2006<br />

COWI A/S<br />

Kongens Lyngby/DK<br />

Wirtschaftskammer<br />

Steiermark<br />

Graz/A<br />

W.Hamburger AG<br />

Pitten/A<br />

Magistr<strong>at</strong> der Stadt<br />

Wien/A<br />

Magistr<strong>at</strong> der Stadt<br />

Wien/A<br />

Gaugl Metallhandel<br />

GmbH<br />

Schönau/A<br />

Ing. Rudolf Rottner<br />

GesmbH<br />

Fischamend/A<br />

Amt der Steiermärkischen<br />

Landesregierung<br />

Graz/A<br />

AVN Abfallverwertung<br />

Niederösterreich GesmbH<br />

Dürnrohr/A<br />

ecorec Österreich<br />

Linz/A<br />

AEVG, Grazer Stadtwerke<br />

AG, Wirtschaftsbetriebe<br />

der Stadt Graz<br />

Graz/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

Zuser Umweltservice<br />

GmbH<br />

Peggau/A<br />

EWB<br />

Entsorgungswirtschaft<br />

am Bodensee GmbH<br />

Lustenau/A<br />

Abfallwirtschaftsverband<br />

Murau<br />

Frojach-K<strong>at</strong>sch/A<br />

Feasibility study about the possibilities <strong>of</strong> mechanical tre<strong>at</strong>ment<br />

<strong>of</strong> 500,000 t/a <strong>of</strong> domestic and commercial waste from<br />

Kopenhagen<br />

Study on the capacities <strong>of</strong> the priv<strong>at</strong>e waste tre<strong>at</strong>ment companies<br />

in Styria as input for the revision <strong>of</strong> the styrian waste<br />

management plan<br />

Study on the risk potential, issue <strong>of</strong> a observ<strong>at</strong>ion concept and<br />

monitoring <strong>of</strong> the groundw<strong>at</strong>er sensor for a contamin<strong>at</strong>ed<br />

industrial site<br />

Feasibility study for the extraction <strong>of</strong> solid recovered fuel from<br />

municipal wastes and the capability for there use on the market<br />

<strong>of</strong> altern<strong>at</strong>ive fuels<br />

Comparison <strong>of</strong> a pneum<strong>at</strong>ic waste collecting system with the<br />

usual waste collection for the new city area “Flugfeld Aspern“<br />

Evalu<strong>at</strong>ion and comparison <strong>of</strong> different places for a scrap metal<br />

recycling plant incl. storage area and dissambly <strong>of</strong> old cars<br />

Feasibility study for the adaption <strong>of</strong> a mechanical biological<br />

waste tre<strong>at</strong>ment plant according to the st<strong>at</strong>e <strong>of</strong> the art,<br />

investig<strong>at</strong>ion <strong>of</strong> variants, capacity 44,500 t/a<br />

Study concerning the effects <strong>of</strong> the amendment <strong>of</strong> the Austrian<br />

landfill act 2008 on landfills in Styria<br />

Comparison <strong>of</strong> various possibilities <strong>of</strong> intermedi<strong>at</strong>e storage <strong>of</strong><br />

waste with a capacity <strong>of</strong> 30,000 t for an inciner<strong>at</strong>ion plant<br />

Feasibility study for the possibilities <strong>of</strong> thermic value tre<strong>at</strong>ment<br />

<strong>of</strong> light fraction <strong>of</strong> wastes (SRF), investig<strong>at</strong>ion <strong>of</strong> the present st<strong>at</strong>e<br />

and prognosis concerning capacity and costs <strong>of</strong> inciner<strong>at</strong>ion<br />

plants.<br />

Compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions and handling <strong>of</strong> EU-wide call for<br />

tenders for the collection and disposal <strong>of</strong> approx. 700 t/a<br />

hazardous waste <strong>of</strong> the city Graz<br />

Evalu<strong>at</strong>ion <strong>of</strong> environmental effects <strong>of</strong> different collection<br />

systems <strong>of</strong> commercial waste<br />

Execution <strong>of</strong> preplanning and present<strong>at</strong>ion for a waste tre<strong>at</strong>ment<br />

center with sorting plant, construction waste and waste wood<br />

tre<strong>at</strong>ment, composting plant and a dump <strong>of</strong> construction site<br />

rubble in Theresienfeld/A, capacity 90,000 t/a<br />

Feasibility study for the construction <strong>of</strong> a mechanical waste<br />

tre<strong>at</strong>ment site with a splitting plant, capacity 35,000 t/h, a<br />

sorting plant with an autom<strong>at</strong>ic sorting system for packaging<br />

waste, capacity 32,000 t/a and a solid recovered fuel (SRF)tre<strong>at</strong>ment,<br />

capacity 20,000 t/h<br />

Feasibility study <strong>of</strong> the pr<strong>of</strong>itability <strong>of</strong> the continued oper<strong>at</strong>ing <strong>of</strong><br />

a mechanical biological waste tre<strong>at</strong>ment plant and a recyclables<br />

collection centre<br />

7


8<br />

2005<br />

2004<br />

2003<br />

2002<br />

ARGEV Verpackungsverwertungs<br />

GmbH<br />

Wien/A<br />

W&P Wietersdorfer und<br />

Peggauer GmbH & Co KG<br />

Peggau/A<br />

Hubert Häusle GesmbH &<br />

Co KG<br />

Lustenau/A<br />

Holcim (Slovensko) a.s.<br />

Br<strong>at</strong>islava/SK<br />

Süddeutsches Institut<br />

Augsburg/D<br />

ecorec Slovenska s.r.o.<br />

Br<strong>at</strong>islava/SK<br />

AWV Lavanttal<br />

Wolfsberg/A<br />

Amt der Vorarlberger<br />

Landesregierung<br />

Bregenz/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz, Vienna/A<br />

Abfallwirtschaftsverband<br />

Wolfsberg<br />

Wolfsberg/A<br />

Amand Lockwitz GmbH<br />

Lockwitz/GER<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

Study about standards for sorting <strong>of</strong> packaging waste referring<br />

the st<strong>at</strong>e <strong>of</strong> the art, health and safety, protection <strong>of</strong> emissions<br />

and fire protection<br />

Comparison <strong>of</strong> different plants <strong>of</strong> SRF in Germany and Austria,<br />

capacity <strong>of</strong> 10,000 t/a<br />

Concept for the reloc<strong>at</strong>ion <strong>of</strong> waste tre<strong>at</strong>ment plants and new<br />

planning <strong>of</strong> the existing loc<strong>at</strong>ion, vari<strong>at</strong>ions and costs<br />

Feasibility study for the construction <strong>of</strong> a SRF-plant, a tre<strong>at</strong>ment<br />

plant for liquid waste, a barrel and tank depot on a loc<strong>at</strong>ion in<br />

Slovakia, capacity <strong>of</strong> 70,000 t/a<br />

Collection, calcul<strong>at</strong>ion and tre<strong>at</strong>ment <strong>of</strong> existing d<strong>at</strong>es <strong>of</strong> the<br />

mass stream for the region Neusiedlersee in Austria;<br />

jointly with PanMobile<br />

Feasibility study for enlarging <strong>of</strong> tre<strong>at</strong>ment <strong>of</strong> solid and liquid<br />

waste for the use as altern<strong>at</strong>ive fuel in the cement industry<br />

(company Holcim)<br />

Feasiblity study for the including <strong>of</strong> a commercial waste<br />

tre<strong>at</strong>ment plant in a planned oper<strong>at</strong>ing loc<strong>at</strong>ion for tre<strong>at</strong>ment <strong>of</strong><br />

biowaste and residual waste<br />

Study on biogenic waste in Vorarlberg in 2003, recording <strong>of</strong><br />

waste streams and evalu<strong>at</strong>ion <strong>of</strong> the tre<strong>at</strong>ment methods<br />

Feasibility study for the construction <strong>of</strong> a thermal value<br />

transform<strong>at</strong>ion plant with the aim <strong>of</strong> gaining high calorific<br />

fractions for the tre<strong>at</strong>ment <strong>of</strong> SRF from residual waste, capacity<br />

<strong>of</strong> 90,000 t/a.<br />

Drawing up <strong>of</strong> a logistic concept for a sewage sludge take-over<br />

st<strong>at</strong>ion before thermal tre<strong>at</strong>ment, capacity <strong>of</strong> 30,000 t/a<br />

Feasibility study for the construction <strong>of</strong> a reloading st<strong>at</strong>ion and a<br />

pre-sorting plant<br />

Concept study for the construction <strong>of</strong> a reloading st<strong>at</strong>ion as well<br />

as a thermal value transform<strong>at</strong>ion plant for domestic waste <strong>at</strong> an<br />

existing loc<strong>at</strong>ion, capacity <strong>of</strong> 10,000 t/a.<br />

Risk analysis <strong>of</strong> a planned tre<strong>at</strong>ment plant for mixed<br />

construction site rubble with a capacity <strong>of</strong> 110,000 t/a using a<br />

simul<strong>at</strong>ion program, calcul<strong>at</strong>ion <strong>of</strong> the amount and quality <strong>of</strong> the<br />

m<strong>at</strong>erial streams and definition <strong>of</strong> additional tre<strong>at</strong>ment steps<br />

Concept study on several possibilities concerning aso-called<br />

„quality splitting procedure“ for the extraction <strong>of</strong> fuel substitutes<br />

from various waste streams<br />

Concept for a SRF pre-tre<strong>at</strong>ment from various waste streams,<br />

“quality splitting”<br />

SRF pre-tre<strong>at</strong>ment from various waste streams <strong>of</strong> the region


2001<br />

2000<br />

Ing. Rudolf Rottner GmbH<br />

Fischamend/A<br />

EBG Entsorgungs-<br />

Beteiligung Graz GmbH<br />

Graz/A<br />

NUA Niederösterreichische<br />

Umweltschutzanstalt/AVN<br />

Abfallverwertung NÖ<br />

Ges.m.b.H., Maria<br />

Enzersdorf/A<br />

Isfahan Compost Co.<br />

Khorasgan – Isfahan/<br />

Iran<br />

Zuma Beteiligungs GmbH<br />

& Co KG<br />

Abfallverwertungs KG<br />

Vienna/A<br />

Freudenthaler<br />

Entsorgungs- und<br />

Recycling GmbH<br />

Tirol/A<br />

URS France<br />

Müllex Umwelt Säuberung<br />

GmbH<br />

Pirching/A<br />

Amand GmbH<br />

Düsseldorf/GER<br />

Abfallwirtschaftsverband<br />

Wolfsberg<br />

Wolfsberg/A<br />

Amt der Salzburger<br />

Landesregierung<br />

Salzburg/A<br />

entsorgt!<br />

Abfallverwertungs GmbH,<br />

Graz/A<br />

Bundesministerium für<br />

Land- und Forstwirtschaft,<br />

Umwelt und<br />

Wasserwirtschaft /<br />

Verbindungsstelle der<br />

Bundesländer, Vienna/A<br />

Concept for the SRF tre<strong>at</strong>ment from shredder light-fractions<br />

Feasibility study for the construction <strong>of</strong> a mechanical-biological<br />

waste tre<strong>at</strong>ment plant with a capacity <strong>of</strong> 30,000 t/a<br />

Feasibility study for the construction <strong>of</strong> a sewage sludge<br />

dehydr<strong>at</strong>ion plant using the process he<strong>at</strong> <strong>of</strong> a local he<strong>at</strong>ing<br />

power st<strong>at</strong>ion<br />

Present<strong>at</strong>ion <strong>of</strong> the possibilities for the tre<strong>at</strong>ment and recovery <strong>of</strong><br />

high calorific parts <strong>of</strong> waste<br />

Study for the expansion <strong>of</strong> the existing compost plant and<br />

production <strong>of</strong> soil<br />

Feasibility study for a dry-mechanical tre<strong>at</strong>ment plant for 35,000<br />

t/a<br />

Feasibility study for an industrial waste sorting plant for15,000<br />

t/a<br />

Feasibility study for the construction <strong>of</strong> a splitting plant for the<br />

extraction <strong>of</strong> fuel substitutes from commercial and mixed<br />

construction site rubble with a capacity <strong>of</strong> 20,000 t/a.<br />

Study on the Austrian environmental legisl<strong>at</strong>ion<br />

Feasibility study for a dry-mechanical tre<strong>at</strong>ment plant for<br />

residual, bulky and industrial waste (total capacity <strong>of</strong> 50,000 t/a)<br />

Feasibility study for a residual waste splitting plant tre<strong>at</strong>ing<br />

residual waste, industrial waste and demolition waste with a<br />

capacity <strong>of</strong> 110,000 t/a as well as for the production <strong>of</strong> SRF with<br />

an average capacity <strong>of</strong> 25,000 t/a<br />

Altern<strong>at</strong>ives to MSW inciner<strong>at</strong>ion<br />

Up-d<strong>at</strong>ing <strong>of</strong> the sewage sludge concept for Salzburg –<br />

consulting work<br />

Technical and commercial comparison <strong>of</strong> various projects dealing<br />

with the mechanical-biological tre<strong>at</strong>ment <strong>of</strong> residual waste<br />

Prepar<strong>at</strong>ion <strong>of</strong> proposals concerning the amendment <strong>of</strong> the<br />

Austrian Waste Management Act;<br />

In cooper<strong>at</strong>ion with the companies Ringh<strong>of</strong>er, UV&P and ARGEV<br />

9


1999<br />

10<br />

AMAND Entwicklungs<br />

GmbH<br />

Dresden/GER<br />

Abfallwirtschaftsverband<br />

Wolfsberg/A<br />

ORIGA-HÖRBIGER<br />

Wr. Neustadt/A<br />

W.Hamburger AG<br />

Pitten/A<br />

Schweigl K. - HandelsAG<br />

Neunkirchen/A<br />

Paul & Co GmbH<br />

Breitenau/A<br />

Envitec S.A.<br />

Athen/GR<br />

Bundesministerium für<br />

Umwelt, Jugend und<br />

Familie<br />

Vienna/A<br />

IKB Innsbrucker<br />

Kommunalbetriebe AG<br />

Innsbruck/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

Loacker Recycling GmbH<br />

Götzis/A<br />

Zweckverband<br />

Abfallwirtschaft Zwickau<br />

Zwickau/GER<br />

Amand Umwelttechnik<br />

Lockwitz GmbH<br />

Dresden/GER<br />

AMAND Entwicklungs<br />

GmbH<br />

Dresden/D<br />

divitec Projektentwicklung<br />

Oberpullendorf/A<br />

Abfallwirtschaftsverband<br />

Schladming/A<br />

ORIGA-HÖRBIGER<br />

Wr. Neustadt/A<br />

Schweigl K. - HandelsAG<br />

Neunkirchen/A<br />

Assistance in experiments on the thermal secondary tre<strong>at</strong>ment <strong>of</strong><br />

low caloric residues<br />

Project management and scientific support <strong>of</strong> an experiment on<br />

the mechanical and biological tre<strong>at</strong>ment <strong>of</strong> residual waste<br />

Provision <strong>of</strong> an external occup<strong>at</strong>ional health and safety expert<br />

for 90 employees pursuant to the Workers Protection Act<br />

Provision <strong>of</strong> an external occup<strong>at</strong>ional health and safety expert<br />

for 240 employees pursuant to the Workers Protection Act<br />

Provision <strong>of</strong> an external occup<strong>at</strong>ional health and safety expert<br />

for 75 employees pursuant to the Workers Protection Act<br />

Provision <strong>of</strong> an external occup<strong>at</strong>ional health and safety expert<br />

for 90 employees pursuant to the Workers Protection Act<br />

Feasibility study for a 150 MW inciner<strong>at</strong>ion plant for RDF;<br />

In cooper<strong>at</strong>ion with Lenzing Technik GesmbH & Co KG<br />

Study on humid soil production – drawing up <strong>of</strong> the technical,<br />

ecological and economic bases for a regul<strong>at</strong>ion<br />

Basic study for the construction <strong>of</strong> a waste tre<strong>at</strong>ment plant in the<br />

course <strong>of</strong> the revitaliz<strong>at</strong>ion <strong>of</strong> a prison<br />

Feasibility study for the construction <strong>of</strong> a fuel tre<strong>at</strong>ment plant as<br />

well as the storage and transport organiz<strong>at</strong>ion for the thermal<br />

tre<strong>at</strong>ment, including an economic calcul<strong>at</strong>ion<br />

Exhaust air cleaning for shredders, concept for a technical<br />

experiment<br />

Identific<strong>at</strong>ion <strong>of</strong> the origins and the composition <strong>of</strong> residual<br />

domestic waste for the local administr<strong>at</strong>ive body “Waste<br />

Management Zwickau”;<br />

In cooper<strong>at</strong>ion with INTECUS Dresden<br />

Basic investig<strong>at</strong>ions, prepar<strong>at</strong>ion and supervision <strong>of</strong> large-scale<br />

tre<strong>at</strong>ment experiments for the extraction <strong>of</strong> high-quality SRF<br />

from industrial and construction wastes<br />

Project management <strong>of</strong> a large scale technical series <strong>of</strong> tests<br />

concerning the thermal secondary tre<strong>at</strong>ment <strong>of</strong> low caloric<br />

residues<br />

Project management and scientific support <strong>of</strong> an experiment on<br />

the mechanical and biological tre<strong>at</strong>ment <strong>of</strong> residual waste<br />

Final st<strong>at</strong>ement for the subsidiz<strong>at</strong>ion <strong>of</strong> a sewage sludge<br />

composting plant by the Umwelt- und Wasserwirtschaftsfonds<br />

(Environment and W<strong>at</strong>er Management Fund)<br />

Provision <strong>of</strong> an external occup<strong>at</strong>ional health and safety expert<br />

pursuant to the Workers Protection Act<br />

Provision <strong>of</strong> an external occup<strong>at</strong>ional health and safety expert<br />

pursuant to the Workers Protection Act


1998<br />

1997<br />

Bundesministerium für<br />

Umwelt, Jugend und<br />

Familie<br />

Wien/A<br />

Stadt Baden<br />

Baden/A<br />

Amand Umwelttechnik<br />

Lockwitz GmbH<br />

Lockwitz/GER<br />

Stadt Changchun/China<br />

AEVG Abfall-Entsorgungs-<br />

u. Verwertungs<br />

Ges.m.b.H.<br />

Graz/A<br />

ORIGA-HÖRBIGER<br />

Wr. Neustadt/A<br />

Schweigl K. - HandelsAG<br />

Neunkirchen/A<br />

Bundesministerium für<br />

Umwelt, Jugend und<br />

Familie<br />

Wien/A<br />

NGV Nürnberger<br />

Gewerbemüll Verwertung<br />

GmbH & Co KG<br />

Nürnberg/GER<br />

Umweltbundesamt<br />

Wien/A<br />

AEVG Abfall-Entsorgungs-<br />

u. Verwertungs<br />

Ges.m.b.H.<br />

Graz/A<br />

AEVG Abfall-Entsorgungs-<br />

u. Verarbeitungs<br />

Ges.m.b.H.<br />

Graz/A<br />

ORIGA-HÖRBIGER<br />

Wr. Neustadt/A<br />

Schweigl K. - HandelsAG<br />

Neunkirchen/A<br />

Check-out <strong>of</strong> the beverage target acqusition;<br />

In cooper<strong>at</strong>ion with RegioPlan Consulting<br />

Sorting analyses <strong>of</strong> old glass and old metal<br />

Optimiz<strong>at</strong>ion <strong>of</strong> loc<strong>at</strong>ions for the recoverable waste collection<br />

and optimiz<strong>at</strong>ion <strong>of</strong> transfer routes<br />

Prepar<strong>at</strong>ion <strong>of</strong> present<strong>at</strong>ion m<strong>at</strong>erial for a EU wide call for tender<br />

for a “thermal processing <strong>of</strong> residual waste” <strong>of</strong> Stadtreinigung<br />

Dresden GmbH<br />

Purchase <strong>of</strong> 200 coachworks for garbage collection vehicles and<br />

the setting-up a local production site and assembling<br />

Initial evalu<strong>at</strong>ion and support in any questions concerning<br />

protective labour legisl<strong>at</strong>ion<br />

Initial evalu<strong>at</strong>ion and providing <strong>of</strong> an external security expert<br />

according to protective labour legisl<strong>at</strong>ion<br />

Initial evalu<strong>at</strong>ion and providing <strong>of</strong> an external security expert<br />

according to protective labour legisl<strong>at</strong>ion<br />

Development <strong>of</strong> a model to calcul<strong>at</strong>e the costs <strong>of</strong> waste<br />

management measures;<br />

In cooper<strong>at</strong>ion with Gesellschaft für umweltfreundliche<br />

Abfallbehandlung GesmbH<br />

Study on the situ<strong>at</strong>ion <strong>of</strong> waste management in Gre<strong>at</strong> Britain and<br />

Portugal<br />

Study on the situ<strong>at</strong>ion <strong>of</strong> exhaust air cleaning (<strong>of</strong> residual waste<br />

composting plants) in Austria, trends <strong>of</strong> development in the<br />

cleaning <strong>of</strong> outlet air;<br />

In cooper<strong>at</strong>ion with the company DI Scheidl Umweltanalytik and<br />

Dr. Uwe Lahl<br />

Tendering for a collection <strong>of</strong> waste paper, waste glass and biowaste<br />

and for the tre<strong>at</strong>ment <strong>of</strong> biogenic waste<br />

EU-wide call for tenders concerning the processing and disposal<br />

<strong>of</strong> industrial waste, commercial waste and bulky waste, waste<br />

wood, residual waste (heavy fraction)and hazardous waste<br />

Evalu<strong>at</strong>ion according to protective labour legisl<strong>at</strong>ion<br />

Providing <strong>of</strong> an external security expert according to protective<br />

labour legisl<strong>at</strong>ion<br />

Providing <strong>of</strong> an external security expert according to protective<br />

labour legisl<strong>at</strong>ion<br />

11


1996<br />

1995<br />

1994<br />

12<br />

DUA – Die Umwelt<br />

Akademie für gtz<br />

(Gesellschaft für<br />

technische<br />

Zusammenarbeit)<br />

Eschborn/GER<br />

Stadtgemeinde Oslo<br />

Oslo/N<br />

Amt der Salzburger<br />

Landesregierung<br />

Salzburg/A<br />

Salzburger<br />

Abfallbeseitigungs<br />

GesmbH & Co KG<br />

Bergheim/A<br />

Faux & Partner GesmbH<br />

Linz/A<br />

Loacker Recycling GmbH<br />

Götzis/A<br />

RVL Restst<strong>of</strong>fverwertung<br />

Lenzing GmbH<br />

Lenzing/A<br />

Saubermacher<br />

Dienstleistungs GmbH<br />

Graz/A<br />

AVL Abfallverwertungsges.<br />

des Landkreises<br />

Ludwigsburg mbH<br />

Bietigheim-Bissingen/GER<br />

A.S.A. Abfall Service<br />

Holding Gesellschaft mbH<br />

Wien/A<br />

Amt der NÖ<br />

Landesregierung<br />

Wien/A<br />

Study on the situ<strong>at</strong>ion <strong>of</strong> tre<strong>at</strong>ment <strong>of</strong> hospital waste in<br />

Germany, project proposition for Pakistan<br />

Feasibility study about different variants for waste charges<br />

Present<strong>at</strong>ion <strong>of</strong> the effects <strong>of</strong> the Landfill Act and the amended<br />

Reclam<strong>at</strong>ion <strong>of</strong> Contamin<strong>at</strong>ed Sites / Tax Act on the development<br />

<strong>of</strong> costs and fees in Salzburg<br />

In cooper<strong>at</strong>ion with the company Quantum<br />

Pilot tre<strong>at</strong>ment <strong>of</strong> rott residual waste with bal<strong>list</strong>ic separ<strong>at</strong>or<br />

BASEP 2000/30 and analyses <strong>of</strong> tre<strong>at</strong>ed fractions according<br />

concentr<strong>at</strong>ion level <strong>of</strong> Deponieverordnung (landfill act)<br />

Scientific support <strong>of</strong> various pilot scenarios <strong>of</strong> mechanical and<br />

biological tre<strong>at</strong>ment <strong>of</strong> residual waste<br />

Support in the realis<strong>at</strong>ion <strong>of</strong> the project “Environmental<br />

techniques - Know-How Transfer to China“ for Handelskammer<br />

Linz<br />

Safety analysis and master plan according to interference law<br />

Logistics concept <strong>of</strong> light fraction<br />

Design <strong>of</strong> a brochure on waste management for marketing<br />

services in Eastern Europe<br />

Specific s<strong>of</strong>tware for calcul<strong>at</strong>ions rel<strong>at</strong>ing to waste management<br />

Waste management for the district <strong>of</strong> „Mittlerer Neckar“<br />

Feasibility study on the construction and oper<strong>at</strong>ion <strong>of</strong> a thermal<br />

tre<strong>at</strong>ment plant for the light fraction (60,000 t/a)<br />

Pollutant balance <strong>at</strong> rotting <strong>of</strong> heavy fraction from <strong>of</strong> residual<br />

waste, air-w<strong>at</strong>er-p<strong>at</strong>h <strong>of</strong> solid m<strong>at</strong>erials<br />

Report <strong>of</strong> a pilot project about biological degrad<strong>at</strong>ion <strong>of</strong><br />

contamin<strong>at</strong>ions in soil from landfill reconversion<br />

Waste mangement concept for city Yichang/China<br />

Flow-sheet <strong>of</strong> fuel for a caloric plant for residual waste in Lower<br />

Austria<br />

Flow-sheet <strong>of</strong> fuel for a caloric plant for residual waste in<br />

Carinthia<br />

The method <strong>of</strong> Residual-Waste-Splitting for Lower Austria;<br />

In cooper<strong>at</strong>ion with Ziv.Ing. J. Ringh<strong>of</strong>er<br />

Analyses <strong>of</strong> residual waste in 2 districts <strong>of</strong> Lower Austria


1993<br />

1992<br />

1991<br />

1990<br />

ÖKK Österreichischer<br />

Kunstst<strong>of</strong>f Kreislauf<br />

GmbH<br />

Wien/A<br />

NGV Nürnberger<br />

Gewerbemüll Verwertung<br />

GmbH & Co KG<br />

Nürnberg/GER<br />

Trügler Recycling u.<br />

Transport Ges.m.b.H.<br />

Judenburg/A<br />

AEVG Abfall-Entsorgungs-<br />

u. Verwertungs<br />

Ges.m.b.H.<br />

Graz/A<br />

ÖKK Österreichischer<br />

Kunstst<strong>of</strong>f Kreislauf<br />

GmbH<br />

Wien/A<br />

Abfallwirtschaftsverband<br />

Schladming/A<br />

Bundesministerium für<br />

Umwelt, Jugend und<br />

Familie<br />

Wien/A<br />

Landkreis Garmisch-<br />

Partenkirchen/GER<br />

Ziv.-Ing.-Büro Trugina<br />

Laxenburg/A<br />

Magistr<strong>at</strong>sabteilung 48<br />

der Stadt Wien/A-<br />

Amt der OÖ<br />

Landesregierung<br />

Linz/A<br />

Burgenländischer<br />

Müllverband<br />

Oberpullendorf/A<br />

R.CAVE & Ass. Ltd.<br />

Oakville/CAN<br />

Costs <strong>of</strong> the processing <strong>of</strong> plastics for thermal tre<strong>at</strong>ment<br />

Costs <strong>of</strong> the sorting <strong>of</strong> the light fraction<br />

Feasibility Study on residual waste tre<strong>at</strong>ment<br />

Feasibility Study on a small sorting plant<br />

Large-scale experiment <strong>of</strong> composting sewage sludge using the<br />

Rott-Filter-Process in Graz<br />

Call for tenders (by the EU) for the mechanical and thermal<br />

tre<strong>at</strong>ment <strong>of</strong> plastic waste (50,000 Mg/a)<br />

Promotion management for the EU-Life-Programme concerning<br />

the mining <strong>of</strong> the Aich landfill<br />

Feasibilty Study on cause-rel<strong>at</strong>ed waste disposal charges<br />

Inspection <strong>of</strong> advantages, disadvantages and efficiency <strong>of</strong> the<br />

model <strong>of</strong> calcul<strong>at</strong>ing waste charges in Ohlstadt<br />

Analyses <strong>of</strong> bio-waste and residual waste<br />

Study on composting methods, basis for decision on<br />

construction <strong>of</strong> a composting facility<br />

Comparison <strong>of</strong> composting processes for the City <strong>of</strong> Mödling<br />

Basic study on the construction <strong>of</strong> a sorting plant for sourcesepar<strong>at</strong>ed<br />

packaging m<strong>at</strong>erials (light fractions)<br />

Feasibilty Study on cause-rel<strong>at</strong>ed waste disposal charges<br />

Concept and realiz<strong>at</strong>ion <strong>of</strong> separ<strong>at</strong>e collection <strong>of</strong> the biological<br />

fraction <strong>of</strong> household waste<br />

Liter<strong>at</strong>ure study, quality, bio waste compost, bi<strong>of</strong>ilter for the<br />

region <strong>of</strong> Durham/Canada<br />

13


14<br />

LEG Landesentwicklungsgesellschaft<br />

Baden-<br />

Württemberg mbH/GER<br />

Bunzl & Biach Ges.m.b.H.<br />

Wien/A<br />

Review <strong>of</strong> a study on a prospective charging system<br />

Review <strong>of</strong> previous plans rel<strong>at</strong>ing to the introduction <strong>of</strong> an<br />

integr<strong>at</strong>ed waste management system in the rural district <strong>of</strong><br />

Ludwigsburg<br />

Analyses <strong>of</strong> residual waste based on the MEKAM-System in the<br />

rural district <strong>of</strong> Ludwigsburg<br />

Continuance <strong>of</strong> the residual waste analyses in Ludwigsburg<br />

Study on commerical waste


Waste and sorting analyses<br />

2009<br />

2008<br />

2007<br />

2006<br />

2004<br />

2003<br />

2001<br />

2000<br />

1999<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

Innov<strong>at</strong>ion und Technik<br />

AG<br />

Seebenstein/A<br />

INTERGEO<br />

Umwelttechnologie und<br />

Abfallwirtschaft GmbH<br />

Salzburg/A<br />

Innov<strong>at</strong>ion und Technik<br />

AG<br />

Seebenstein/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

Sinawehl Umwelttechnik<br />

GmbH<br />

Marz/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz, Vienna/A<br />

AEVG –<br />

Abfallentsorgungs- und<br />

Verwertungs GesmbH<br />

Graz/A<br />

Burgenländischer<br />

Müllverband<br />

Oberpullendorf/A<br />

ZUMA<br />

Abfallst<strong>of</strong>fverwertung<br />

Vienna/A<br />

Abfallwirtschafstverband<br />

Wolfsberg<br />

Wolfsberg/A<br />

Komptech GmbH<br />

Frohnleiten/A<br />

divitec Projekentwicklungs<br />

GmbH<br />

Oberpullendorf/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

Amand Umwelttechnik<br />

Lockwitz GmbH<br />

Dresden/GER<br />

Support in prepar<strong>at</strong>ion and performance <strong>of</strong> municipal waste<br />

analysis in Varna/Bulgaria<br />

Support in prepar<strong>at</strong>ion and performance <strong>of</strong> municipal waste<br />

analysis in Damascus/Syria<br />

Support <strong>of</strong> the prepar<strong>at</strong>ion and execution <strong>of</strong> household waste<br />

analyses in 5 regions <strong>of</strong> Greece<br />

Support <strong>of</strong> the prepar<strong>at</strong>ion and execution <strong>of</strong> household waste<br />

analyses in St. Petersburg/RUS<br />

Sorting analyses <strong>of</strong> municipal waste and analyses <strong>of</strong> bulky waste<br />

<strong>of</strong> several communities in Carinthia<br />

Evalu<strong>at</strong>ion <strong>of</strong> physical qualities <strong>of</strong> the input in a waste tre<strong>at</strong>ment<br />

plant in Hannover<br />

Sorting analyses <strong>of</strong> tre<strong>at</strong>ed commercial waste in Vienna<br />

Sorting analyses <strong>of</strong> residual waste, bio waste, used glass, scrap<br />

metal, light packaging<br />

Sorting analyses <strong>of</strong> residual waste<br />

Analyses <strong>of</strong> construction waste, commercial and bulky refuse<br />

Sorting analyses <strong>of</strong> residual waste<br />

Screening analyses <strong>of</strong> shredded residual waste<br />

Sorting analyses <strong>of</strong> screening rests<br />

Sorting analyses <strong>of</strong> bio waste<br />

Screening and sorting analyses <strong>of</strong> building and commercial<br />

wastes as well as <strong>of</strong> sorting rests<br />

15


1997<br />

1996<br />

1995<br />

1994<br />

16<br />

divitec<br />

Projektentwicklungs<br />

GmbH<br />

Oberpullendorf/A<br />

Umweltdienst Burgenland<br />

Oberpullendorf/A<br />

Zellinger GmbH<br />

Walding/A<br />

AEVG Abfall-Entsorgungs-<br />

u. Verwertungs<br />

Ges.m.b.H.<br />

Graz/A<br />

Burgenländischer<br />

Müllverband<br />

Oberpullendorf/A<br />

Abfallwirtschaftsverband<br />

Liezen/A<br />

ARGEV Verpackungsverwertungs<br />

GesmbH<br />

Wien/A<br />

Gemeindeverband für<br />

Abfallbeseitigung im<br />

Verwaltungsbezirk Baden<br />

Baden/A<br />

Gemeindeverband für<br />

Abfallbehandlung im<br />

Bezirk Bruck/Leitha<br />

Bruck/Leitha/A<br />

Burgenländischer<br />

Müllverband<br />

Oberpullendorf/A<br />

Abfallwirtschaftsverband<br />

Schladming<br />

Schladming/A<br />

Kreisabfallwirtschaft<br />

Sigmaringen/GER<br />

Amt der Salzburger<br />

Landesregierung/A<br />

Amt der Steiermärkischen<br />

Landesregierung<br />

Graz/A<br />

Sorting analyses <strong>of</strong> screening rests<br />

Sorting analyses <strong>of</strong> residual waste and screening rests<br />

Sifting analyses <strong>of</strong> industrial and commercial wastes and bulky<br />

refuse<br />

Labor<strong>at</strong>ory studies <strong>of</strong> various residual waste fractions;<br />

In cooper<strong>at</strong>ion with the companyDI Scheidl - Umweltanalytik<br />

Sorting analyses <strong>of</strong> industrial, commercial and bulky waste as<br />

well as waste wood<br />

Caloric value analyses <strong>of</strong> residual waste;<br />

In cooper<strong>at</strong>ion with DI Scheidl Umweltanalytik<br />

Sorting analyses <strong>of</strong> residual waste<br />

Sorting analyses <strong>of</strong> light packaging m<strong>at</strong>erial<br />

Sorting analyses <strong>of</strong> ARGEV-metals<br />

Sorting analyses <strong>of</strong> ARGEV-metals<br />

Analyses <strong>of</strong> residual waste for the region <strong>of</strong> Burgenland<br />

Analyses <strong>of</strong> the output <strong>of</strong> the waste tre<strong>at</strong>ment plant in Aich-<br />

Assach<br />

Sorting analyses <strong>of</strong> residual domestic waste<br />

Sorting analyses <strong>of</strong> industrial waste<br />

Analyses <strong>of</strong> residual waste and prognosis <strong>of</strong> houshold waste for<br />

the district <strong>of</strong> Sigmaringen;<br />

In cooper<strong>at</strong>ion with the company RUK<br />

Analyses <strong>of</strong> residual, bulky and commercial waste<br />

Analyses <strong>of</strong> residual waste in the whole region <strong>of</strong> Styria


1993<br />

1992<br />

1991<br />

1990<br />

Amt der Steiermärkischen<br />

Landesregierung<br />

Graz/A<br />

BAV Bergischer<br />

Abfallwirtschaftsverband<br />

Engelskirchen/GER<br />

Umweltdienst Burgenland<br />

Oberpullendorf/A<br />

Saubermacher<br />

Dienstleistungs GmbH<br />

Graz/A<br />

OC-ORG Consult<br />

Essen/GER<br />

Abfallwirtschaftsverband<br />

Feldbach<br />

Steiermark/A<br />

Analyses <strong>of</strong> residual waste in 7 districts <strong>of</strong> Styria<br />

Sorting analyss <strong>of</strong> residual waste<br />

Sorting analyses <strong>of</strong> bio-waste and residual waste<br />

Sorting analyses <strong>of</strong> residual waste in Kirchdorf an der Krems<br />

Sorting analyses to determine the content <strong>of</strong> synthetic m<strong>at</strong>erials<br />

in the waste<br />

Waste management concept for the district <strong>of</strong> Feldbach<br />

Analyses <strong>of</strong> residual waste and total waste in Feldbach<br />

17


Expert evalutions<br />

2011<br />

2010<br />

2009<br />

2008<br />

2007<br />

18<br />

ecorec<br />

Vienna/A<br />

Vienna Intern<strong>at</strong>ional<br />

Airport<br />

Schwech<strong>at</strong>/A<br />

Rechtsanwalt Mag.<br />

Michael Steininger<br />

St.Pölten/A<br />

Saubermacher<br />

Slovenija d.o.o.<br />

Murska Sobota/SLO<br />

AEVG Abfall Entsorgungs-<br />

und Verwertungs GmbH<br />

Graz/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

Wopfinger<br />

Baust<strong>of</strong>findustrie GmbH<br />

Waldegg/A<br />

Cemex Austria AG<br />

Landgenzersdorf/A<br />

Ecorec Slovensko s.r.o.<br />

Pezinok/SK<br />

Lindner<br />

Recyclingtech GmbH<br />

Spittal/Drau/A<br />

Bundesministerium für<br />

Land- und<br />

Forstwirtschaft, Umwelt<br />

und Wasserwirtschaft<br />

Vienna/A<br />

AEVG Abfall Entsorgungs-<br />

und Verwertungs GmbH<br />

Graz/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz, Vienna/A<br />

Gemeindebetriebe<br />

Frohnleiten GesmbH<br />

Frohnleiten/A<br />

Development <strong>of</strong> an audit system and performance <strong>of</strong> audits <strong>at</strong> all<br />

plants supplying a specific fuel fraction for the cement plant in<br />

Rohoznik/Slovakia<br />

Evalu<strong>at</strong>ion <strong>of</strong> the composting plant Lengel, with a capacity <strong>of</strong><br />

20,000 t/a, for the construction <strong>of</strong> the third airport runway<br />

Evalu<strong>at</strong>ion <strong>of</strong> value <strong>of</strong> wastes for an auction<br />

Expert opinion on technical capability and the adherence <strong>of</strong> best<br />

available technology on the composting plant Vhrnika with a<br />

capacity <strong>of</strong> 10,000 t/a<br />

Evalu<strong>at</strong>ion <strong>of</strong> the waste takeover agreement between AEVG,<br />

Servus Abfall and EBG Entsorgungsbeteiligung Graz GmbH,<br />

Verific<strong>at</strong>ion <strong>of</strong> the equal tre<strong>at</strong>ment clause as contracted and the<br />

flo<strong>at</strong>ing clause for the years 2008 and 2009.<br />

Due Diligence – evalu<strong>at</strong>ion <strong>of</strong> a waste disposal company with<br />

various loc<strong>at</strong>ions in Slovenia<br />

Inspection and investig<strong>at</strong>ion <strong>of</strong> optimizing potentials <strong>of</strong> various<br />

waste tre<strong>at</strong>ment plants in Austria and Slovenia<br />

Consulting work about potential conveying- and storage system<br />

for waste and bulk solids<br />

Expert opinion in the course <strong>of</strong> a selling process about the<br />

debasement by shortcomings on technical equipment<br />

Consulting work for optimiz<strong>at</strong>ion <strong>of</strong> a SRF-tre<strong>at</strong>ment plant,<br />

output 35,000 t/a.<br />

Consulting work about the suppliers <strong>of</strong> biological waste<br />

tre<strong>at</strong>ment plants<br />

Evalu<strong>at</strong>ion <strong>of</strong> environmental subsidiz<strong>at</strong>ions according to the<br />

Umweltförderungsgesetz (Environmental Subsidiz<strong>at</strong>ions Act) for<br />

2005 – 2007, focusing on the field <strong>of</strong> sanit<strong>at</strong>ion and<br />

safeguarding <strong>of</strong> landfills, as sub-contractor for the company KWI<br />

Evalu<strong>at</strong>ion <strong>of</strong> the contract concerning passing on <strong>of</strong> wastes<br />

between AEVG and EBG Entsorgungsbeteiligung Graz GmbH in<br />

the years 2006 and 2007<br />

Consulting work for optimizing the biological tre<strong>at</strong>ment <strong>of</strong> the<br />

fine fraction resulting from the mechanical tre<strong>at</strong>ment <strong>of</strong><br />

commercial waste<br />

Consulting work regarding the effects <strong>of</strong> a new Austrian landfill<br />

regul<strong>at</strong>ion for the sanitary landfill Frohnleiten


2006<br />

2005<br />

2004<br />

2002<br />

2001<br />

Ing. Rudolf Rottner<br />

GesmbH<br />

Fischamend/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

AEVG Abfall Entsorgungs-<br />

und Verwertungs GmbH<br />

Graz/A<br />

ZEMKA<br />

Zell am See/A<br />

Gemeindebetriebe<br />

Frohnleiten GesmbH<br />

Frohnleiten/A<br />

Bundesministerium für<br />

Land- und<br />

Forstwirtschaft, Umwelt<br />

und Wasserwirtschaft<br />

Vienna/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Wien/A<br />

A&ABA Altst<strong>of</strong>f- & Abfall-<br />

Behandlungsanlage<br />

GmbH<br />

Maria Buch/A<br />

Hermes Schleifmittel<br />

GmbH<br />

Bad St. Leonhard im<br />

Lavanttal/A<br />

Fachverband der<br />

Mineralölindustrie<br />

Österreichs<br />

Vienna/A<br />

Hubert Häusle GesmbH &<br />

CoKG<br />

Lustenau/A<br />

Rupert H<strong>of</strong>er GmbH &<br />

CoKG<br />

Lustenau/A<br />

Trügler Recycling<br />

Judenburg/A<br />

Verific<strong>at</strong>ion <strong>of</strong> the st<strong>at</strong>e <strong>of</strong> the art according to EU directive<br />

concerning the IPPC for an oper<strong>at</strong>ing plant (incl. a mechanical<br />

biological waste tre<strong>at</strong>ment plant, a composting plant and a<br />

landfill)<br />

Consulting for the approval procedure concerning the upgrading<br />

<strong>of</strong> the energy center <strong>of</strong> company Villas, which is feeded with<br />

solid recovered fuels from wastes, capacity 17,000 t/a SRF and<br />

14,000 t/a sludge<br />

Evalu<strong>at</strong>ion <strong>of</strong> the contract concerning passing on <strong>of</strong> wastes<br />

between AEVG and EBG Entsorgungsbeteiligung Graz GmbH in<br />

the years 2004 and 2005<br />

Evalu<strong>at</strong>ion <strong>of</strong> the technical and oper<strong>at</strong>ional standards <strong>of</strong> a waste<br />

tre<strong>at</strong>ment plant, consisting <strong>of</strong> mechanical and biological parts<br />

according to IPPC-standards<br />

Consulting work for optimizing <strong>of</strong> final rott and reducing <strong>of</strong><br />

odour emissions <strong>at</strong> the mechanical biological tre<strong>at</strong>ment plant<br />

Frohnleiten<br />

Evalu<strong>at</strong>ion <strong>of</strong> environmental subsidiz<strong>at</strong>ions according to the<br />

Umweltförderungsgesetz (Environmental Subsidiz<strong>at</strong>ions Act) for<br />

2002 – 2004, focusing on the field <strong>of</strong> sanit<strong>at</strong>ion and<br />

safeguarding <strong>of</strong> landfills, as sub-contractor for the company KWI<br />

Due diligence – evalu<strong>at</strong>ion <strong>of</strong> a waste disposal company with<br />

loc<strong>at</strong>ions in Austria, Czechia, Hungary and Slovenia<br />

Evalu<strong>at</strong>ion <strong>of</strong> an existing sorting plant <strong>of</strong> lightweight pack and<br />

comparison <strong>of</strong> retr<strong>of</strong>itting control for <strong>of</strong> a partially autom<strong>at</strong>ic<br />

oper<strong>at</strong>ing, capacity <strong>of</strong> 20,000 t/a<br />

Situ<strong>at</strong>ion analysis and optimizing concept referring the regional<br />

work <strong>of</strong> a waste tre<strong>at</strong>ment and sorting plant in future<br />

Evalu<strong>at</strong>ion <strong>of</strong> existing tre<strong>at</strong>ment methods for abrasive waste<br />

according to the Deponieverordnung (Landfill Act).<br />

Technical expert study on packaging, possibilities <strong>of</strong> tre<strong>at</strong>ment<br />

and limits<br />

Calcul<strong>at</strong>ion <strong>of</strong> the market value <strong>of</strong> various waste management<br />

facilities<br />

Calcul<strong>at</strong>ion <strong>of</strong> the market value <strong>of</strong> various waste management<br />

facilities<br />

Evalu<strong>at</strong>ion <strong>of</strong> a waste sorting plant and the possibilities for its<br />

expansion in the region<br />

19


2000<br />

1999<br />

1997<br />

1995<br />

1994<br />

20<br />

Texter/CH<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

NUA<br />

Niederösterreichische<br />

Umweltschutzanstalt,<br />

Maria Enzersdorf/A<br />

EBG<br />

Entsorgungsbeteiligung<br />

Graz GmbH<br />

Graz/A<br />

Loacker Recycling GmbH<br />

Götzis/A<br />

Hubert Häusle GesmbH &<br />

Co KG<br />

Dornbirn/A<br />

Amand Entwicklungs<br />

GmbH<br />

Grumbach/GER<br />

Innov<strong>at</strong>ive Umwelttechnik<br />

Gesellschaft mbH<br />

Seebenstein/A<br />

ARGEV und Stmk. Gebiets-<br />

körperschaften/A<br />

Lobbe MTU GmbH<br />

Werndorf/A<br />

Novom<strong>at</strong>ic<br />

Autom<strong>at</strong>enindustrie- und<br />

-handelsges.m.b.H.<br />

Gumpoldskirchen/A<br />

GWV Gesellschaft für<br />

Wertst<strong>of</strong>fverwertung mbH<br />

Remseck/D<br />

Calcul<strong>at</strong>ion <strong>of</strong> the market value <strong>of</strong> two plant loc<strong>at</strong>ions<br />

Technical and economic comparison <strong>of</strong> various shredder plants<br />

Technical and commercial evalu<strong>at</strong>ion <strong>of</strong> a project dealing with<br />

the ferment<strong>at</strong>ion <strong>of</strong> 16,000 t/a <strong>of</strong> biogenic waste<br />

Technical evalu<strong>at</strong>ion <strong>of</strong> possible loc<strong>at</strong>ions for the construction <strong>of</strong><br />

a plant for the company Servus Abfall Dienstleistungs<br />

GmbH&CoKG<br />

Calcul<strong>at</strong>ion <strong>of</strong> the market value <strong>of</strong> various waste management<br />

facilities<br />

Evalu<strong>at</strong>ion <strong>of</strong> a plant loc<strong>at</strong>ion, taking into account various<br />

expansions <strong>of</strong> the plant<br />

Assistance in a series <strong>of</strong> large-scale tests on the thermal<br />

secondary tre<strong>at</strong>ment <strong>of</strong> low caloric waste<br />

Pre-evalu<strong>at</strong>ion<br />

Expert opinion on the analytics <strong>of</strong> collected m<strong>at</strong>erial (light<br />

fraction <strong>of</strong> packaging m<strong>at</strong>erial)<br />

Evalu<strong>at</strong>ion <strong>of</strong> a possible loc<strong>at</strong>ion<br />

Technical and legal evalu<strong>at</strong>ion <strong>of</strong> the company<br />

Evalu<strong>at</strong>ion <strong>of</strong> the company according to ecnonomical and<br />

technical aspects


Assessments according to the emission certific<strong>at</strong>es trade act<br />

2011<br />

2010<br />

2009<br />

2008<br />

2007<br />

Herbert Pexider GmbH<br />

Teufenbach/A<br />

Ziegelwerk Lizzi GmbH<br />

Erlach/A<br />

Semperit Technische<br />

Produkte GmbH<br />

Wimpassing/A<br />

Herbert Pexider GmbH<br />

Teufenbach/A<br />

Ziegelwerk Lizzi GmbH<br />

Erlach/A<br />

Semperit Technische<br />

Produkte GmbH<br />

Wimpassing/A<br />

Herbert Pexider GmbH<br />

Teufenbach/A<br />

Ziegelwerk Lizzi GmbH<br />

Erlach/A<br />

Semperit Technische<br />

Produkte GmbH<br />

Wimpassing/A<br />

Herbert Pexider GmbH<br />

Teufenbach/A<br />

Ziegelwerk Lizzi GmbH<br />

Erlach/A<br />

Semperit Technische<br />

Produkte GmbH<br />

Wimpassing/A<br />

Herbert Pexider GmbH<br />

Teufenbach/A<br />

Ziegelwerk Lizzi GmbH<br />

Erlach/A<br />

Semperit Technische<br />

Produkte GmbH & Co KG<br />

Wimpassing/A<br />

Assessments according to the emission certific<strong>at</strong>es trade act<br />

(Directive 2003/87/EC) for the year 2010<br />

Assessment <strong>of</strong> the d<strong>at</strong>a collection for the Community-wide and<br />

fully harmonised free alloc<strong>at</strong>ion <strong>of</strong> emission certific<strong>at</strong>es for the<br />

years 2013 - 2020<br />

Assessments according to the emission certific<strong>at</strong>es trade act<br />

(Directive 2003/87/EC) for the year 2010<br />

Assessment <strong>of</strong> the d<strong>at</strong>a collection for the Community-wide and<br />

fully harmonised free alloc<strong>at</strong>ion <strong>of</strong> emission certific<strong>at</strong>es for the<br />

years 2013 - 2020<br />

Assessments according to the emission certific<strong>at</strong>es trade act<br />

(Directive 2003/87/EC) for the year 2010<br />

Assessment <strong>of</strong> the d<strong>at</strong>a collection for the Community-wide and<br />

fully harmonised free alloc<strong>at</strong>ion <strong>of</strong> emission certific<strong>at</strong>es for the<br />

years 2013 - 2020<br />

Assessments according to the emission certific<strong>at</strong>es trade act<br />

(Directive 2003/87/EC) for the year 2009<br />

Assessments according to the emission certific<strong>at</strong>es trade act<br />

(Directive 2003/87/EC) for the year 2009<br />

Assessments according to the emission certific<strong>at</strong>es trade act<br />

(Directive 2003/87/EC) for the year 2009<br />

Assessments according to the emission certific<strong>at</strong>es trade act<br />

(Directive 2003/87/EC) for the year 2008<br />

Assessments according to the emission certific<strong>at</strong>es trade act<br />

(Directive 2003/87/EC) for the year 2008<br />

Assessments according to the emission certific<strong>at</strong>es trade act<br />

(Directive 2003/87/EC) for the year 2008<br />

Assessments according to the emission certific<strong>at</strong>es trade act<br />

(Directive 2003/87/EC) for the year 2007<br />

Assessments according to the emission certific<strong>at</strong>es trade act<br />

(Directive 2003/87/EC) for the year 2007<br />

Assessments according to the emission certific<strong>at</strong>es trade act<br />

(Directive 2003/87/EC) for the year 2007<br />

Assessments according to the emission certific<strong>at</strong>es trade act<br />

(Directive 2003/87/EC) for the year 2006<br />

Assessments according to the emission certific<strong>at</strong>es trade act<br />

(Directive 2003/87/EC) for the year 2006<br />

Assessments according to the emission certific<strong>at</strong>es trade act<br />

(Directive 2003/87/EC) for the year 2006<br />

21


2006<br />

22<br />

Herbert Pexider GmbH<br />

Teufenbach/A<br />

Ziegelwerk Lizzi GmbH<br />

Erlach/A<br />

Semperit Technische<br />

Produkte GmbH & Co KG<br />

Wimpassing/A<br />

Assessments according to the emission certific<strong>at</strong>es trade act<br />

(Directive 2003/87/EC) for the year 2005<br />

Assessments according to the emission certific<strong>at</strong>es trade act<br />

(Directive 2003/87/EC) for the year 2005<br />

Assessments according to the emission certific<strong>at</strong>es trade act<br />

(Directive 2003/87/EC) for the year 2005


Plant design and supervision <strong>of</strong> construction<br />

Mechanical waste tre<strong>at</strong>ment<br />

2011<br />

2010<br />

KAB Kärntner<br />

Abfallbewirtschaftung<br />

GmbH<br />

Klagenfurt/A<br />

Ekokem Oy Ab<br />

Riihimäki/FI<br />

Zuser Umweltservice<br />

GmbH<br />

Peggau/A<br />

Trügler Recycling und<br />

Transport GesmbH<br />

Fisching/A<br />

Gaugl Metallhandel GmbH<br />

Tiefenbach bei Kaindorf/A<br />

Thermo Team<br />

Altern<strong>at</strong>ivbrennst<strong>of</strong>fverwertungs<br />

GmbH<br />

Graz/A<br />

Zuser Umweltservice<br />

GmbH<br />

Peggau/A<br />

I/S Amagerforbränding<br />

Kopenhagen/DK<br />

Ekokem Oy Ab<br />

Riihimäki/Finnland<br />

Thermo Team<br />

Altern<strong>at</strong>ivbrennst<strong>of</strong>fverwertungs<br />

GmbH<br />

Graz/A<br />

Fernwärme Wien GmbH<br />

Wien/A<br />

Pre-design and draft planning, approval planning according to<br />

the Austrian Waste Management Act and compil<strong>at</strong>ion <strong>of</strong><br />

specific<strong>at</strong>ions for the construction <strong>of</strong> a mechanical sorting plant<br />

for commercial wastes and packaging wastes with a capacity <strong>of</strong><br />

34,500 t/a<br />

Concept for the expansion <strong>of</strong> an existing plant to include the<br />

biological, mechanical and physico-chemical tre<strong>at</strong>ment <strong>of</strong> non<br />

hazardous and hazardous wastes<br />

Compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions for a mechanical tre<strong>at</strong>ment plant<br />

destined to extract fuel and a fine fraction rich in organic<br />

substances from various waste streams; capacity <strong>of</strong> 100,000 t/a<br />

Approval planning according to the Austrian Waste Management<br />

Act for several adaptions <strong>of</strong> an existing waste tre<strong>at</strong>ment plant<br />

with a capacity <strong>of</strong> 159,500 t/a<br />

Approval planning according to the Austrian Waste Management<br />

Act for the expansion <strong>of</strong> the site from 34,999 t/a to 50,000 t/a<br />

and additional waste key numbers, activities and surfaces<br />

Compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions, handling <strong>of</strong> the procurement<br />

procedure, construction supervision and overall project<br />

coordin<strong>at</strong>ion for the construction <strong>of</strong> a metal- and scrap waste<br />

tre<strong>at</strong>ment plant with associ<strong>at</strong>ed secondary plants, a scrap car<br />

drainage plant, a scrap car disassembly plant and a<br />

transshipment st<strong>at</strong>ion for various dry waste streams; overall<br />

capacity <strong>of</strong> 35,000 t/a<br />

Approval planning for various adapt<strong>at</strong>ions <strong>of</strong> the existing plant<br />

according to the Austrian Waste Management Act and<br />

permission for an increase in the allowed annual troughput from<br />

90,000 t/a to 99,500 t/a<br />

Approval planning according to the Austrian Waste Management<br />

Act for the adaption <strong>of</strong> an existing waste tre<strong>at</strong>ment plant with a<br />

capacity <strong>of</strong> 159,500 t/a to technical progress<br />

Pre-design and draft planning for the construction <strong>of</strong> a<br />

mechanical waste tre<strong>at</strong>ment plant for 150,000 t/a <strong>of</strong><br />

construction and demolition and commercial waste in<br />

Kopenhagen.<br />

Pre-design planning for the construction <strong>of</strong> a mechanical<br />

tre<strong>at</strong>ment plant for extraction <strong>of</strong> fuel and recyclable waste<br />

m<strong>at</strong>erial from different waste streams with a capacity <strong>of</strong><br />

35,000 t/a<br />

Approval planning for the construction <strong>of</strong> a shed ro<strong>of</strong> in the<br />

input storage <strong>of</strong> the SRF-tre<strong>at</strong>ment plant in Retznei.<br />

Plan <strong>of</strong> execution, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ion and construction<br />

supervision for the rebuilding <strong>of</strong> the ash discharge <strong>of</strong> a rotary<br />

furnace, capacity: 2,200 t/a.<br />

23


2009<br />

24<br />

AE&E Austrian Energy &<br />

Environment<br />

Graz/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

Müllex Umwelt-Säuberung<br />

GmbH<br />

St. Margarethen an der<br />

Raab/A<br />

Thermo Team<br />

Altern<strong>at</strong>ivbrennst<strong>of</strong>fverwertungs<br />

GmbH<br />

Graz/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Wien/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Unterpremstätten/A<br />

Gaugl Metallhandel GmbH<br />

Schönau/A<br />

Zuser Umweltservice<br />

GmbH<br />

Peggau/A<br />

KAB Kärntner<br />

Abfallbewirtschaftung<br />

GmbH<br />

Klagenfurt/A<br />

Fernwärme Wien GmbH<br />

Wien/A<br />

WKU Wiener Kommunal-<br />

Umweltschutzprojekte<br />

GmbH<br />

Wien/A<br />

ThermoTeam<br />

Altern<strong>at</strong>ivbrennst<strong>of</strong>fverwertungs<br />

GmbH<br />

Retznei/A<br />

Leadership <strong>of</strong> the setting-up oper<strong>at</strong>ion and the test run <strong>of</strong> a SRFtre<strong>at</strong>ment<br />

plant for the applic<strong>at</strong>ion in a fluidized bed<br />

combustion, capacity: 75 t/h in Schwedt, Germany<br />

Compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions, handling <strong>of</strong> the award <strong>of</strong> contracts<br />

and construction supervision <strong>of</strong> a tre<strong>at</strong>ment plant for waste<br />

electric appliance and polluted scrap for 20,000 t/a<br />

Approval planning according to the Austrian Waste Management<br />

Act for several adaptions <strong>of</strong> a waste tre<strong>at</strong>ment plant, capacity<br />

80,000 t/a<br />

Approval planning for the completion notific<strong>at</strong>ion according to<br />

the Austrian Waste Management Act for the exchange <strong>of</strong><br />

machinery and for adaption <strong>of</strong> the process engineering on the<br />

SRF-tre<strong>at</strong>ment plant for 90,000 t/a in Retznei.<br />

Approval planning according to the Austrian Waste Management<br />

Act for the construction <strong>of</strong> a truck- and container yard and<br />

adaption measures <strong>of</strong> an autom<strong>at</strong>ically sorting plant for<br />

commercial and packaging waste for 35,000 t/a in Graz.<br />

Pre-design and approval planning according to the Austrian<br />

Waste Management Act for the construction <strong>of</strong> a secondary<br />

shredder and an output storage <strong>of</strong> 35,000 t/a in Vienna.<br />

Pre-design and approval planning according to the Austrian<br />

Waste Management Act, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions, handling<br />

<strong>of</strong> the award <strong>of</strong> contracts and supervision <strong>of</strong> the construction for<br />

a tre<strong>at</strong>ment plant <strong>of</strong> garage wastes, capacity 15,000 t/a<br />

Pre-design and approval planning according to the Austrian<br />

Waste Management Act for the construction <strong>of</strong> a tre<strong>at</strong>ment plant<br />

<strong>of</strong> electrical waste, capacity 20,000 t/a<br />

Approval planning according to the Austrian Waste Management<br />

Act for the construction <strong>of</strong> a scrap waste tre<strong>at</strong>ment plant incl.<br />

associ<strong>at</strong>ed secondary plants, dissambly <strong>of</strong> old cars and a<br />

reloading st<strong>at</strong>ion for demolition and construction waste, capacity<br />

35,000 t/a<br />

Approval planning according to the Austrian Waste Tre<strong>at</strong>ment<br />

Act for re-loading <strong>of</strong> municipal waste, capacity 10,000 t/a<br />

Approval planning according to the Austrian Waste Management<br />

Act for several extensions <strong>of</strong> a mechanical waste tre<strong>at</strong>ment plant,<br />

capacity 35,000 t/a<br />

Approval planning for the reconstruction <strong>of</strong> the cinder output <strong>of</strong><br />

a rotary kiln, capacity 2,200 t/a<br />

Compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions and handling <strong>of</strong> the award <strong>of</strong><br />

contracts for the construction <strong>of</strong> a waste logistics center for<br />

residual waste <strong>of</strong> the City Vienna, consisting <strong>of</strong> a mechanical<br />

tre<strong>at</strong>ment plant and a baling storage with a capacity <strong>of</strong> 2,600 t/d<br />

Assistance <strong>of</strong> the resumption <strong>of</strong> production <strong>of</strong> fuel after a fire<br />

damage in a waste tre<strong>at</strong>ment plant


2008<br />

2007<br />

Innov<strong>at</strong>ion und Technik<br />

AG<br />

Seebenstein/A<br />

Guggenberger Erdbau<br />

GmbH<br />

Dorfbeuern/A<br />

WKU Wiener Kommunal-<br />

Umweltschutzprojekte<br />

GmbH<br />

Vienna/A<br />

Josef Buchhauser<br />

Voitsberg/A<br />

ThermoTeam<br />

Altern<strong>at</strong>ivbrennst<strong>of</strong>fverwertungs<br />

GmbH<br />

Retznei/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

AE&E Austrian Energy &<br />

Environment<br />

Graz/A<br />

Zuser Umweltservice<br />

GmbH<br />

Peggau/A<br />

Abfallwirtschaftsverband<br />

Lavanttal<br />

Lavamünd/A<br />

AE&E Austrian Energy &<br />

Environment<br />

Graz/A<br />

Fernwärme Wien GmbH<br />

Vienna/A<br />

Müllex Umwelt Säuberung<br />

GmbH<br />

St. Margarethen an der<br />

Raab/A<br />

ThermoTeam<br />

Altern<strong>at</strong>ivbrennst<strong>of</strong>fverwertungs<br />

GmbH<br />

Retznei/A<br />

Pre-design for a solid recovered fuel (SRF)-tre<strong>at</strong>ment plant in<br />

S<strong>of</strong>ia/BG, capacity 35,000 t/a<br />

Approval planning according to the Austrian Waste Management<br />

Act for the construction <strong>of</strong> an oper<strong>at</strong>ing plant with tre<strong>at</strong>ment <strong>of</strong><br />

gypsum plasterboard<br />

Pre-design and technical approval documents according to the<br />

Austrian Environmental Impact Assessment Act (UVP) for a waste<br />

logistic center <strong>of</strong> residual waste <strong>of</strong> the city Vienna, (consisting <strong>of</strong><br />

a mechanical tre<strong>at</strong>ment plant with 130 t/h and a bale storage<br />

with capacity <strong>of</strong> 2,600 t/d)<br />

Approval planning for a waste tre<strong>at</strong>ment center, consisting <strong>of</strong> a<br />

reloading st<strong>at</strong>ion, an intermedi<strong>at</strong>e storage and a mechanical<br />

waste sorting plant, capacity 30,000 t/a<br />

Pre-design and investig<strong>at</strong>ion <strong>of</strong> pr<strong>of</strong>itability for integr<strong>at</strong>ing <strong>of</strong> a<br />

solid recovered fuel (SRF)-tre<strong>at</strong>ment plant in a cement plant in<br />

Slovenia, capacity 25,000 t/a<br />

Pre-design and investig<strong>at</strong>ion <strong>of</strong> pr<strong>of</strong>itability for a solid recovered<br />

fuel (SRF) tre<strong>at</strong>ment plant incl. autom<strong>at</strong>ed output storage for a<br />

cement plant in Ciskovice/Czechia, capacity 35,000 t/a<br />

Pre-design for a tre<strong>at</strong>ment plant <strong>of</strong> solid recovered fuel (SRF) for<br />

the input into an <strong>at</strong>mospheric fluidized bed combustion,<br />

capacity 75 t/h in Leipa/Germany<br />

in cooper<strong>at</strong>ion with company Envicare<br />

Approval planning according to the Austrian Waste Management<br />

Act for the extension <strong>of</strong> a solid recovered fuel (SRF) tre<strong>at</strong>ment<br />

plant and a bale storage, capacity 151,000 t/a<br />

in cooper<strong>at</strong>ion with company UV&P<br />

Compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions, handling <strong>of</strong> the award <strong>of</strong> contracts<br />

and supervison <strong>of</strong> the construction <strong>of</strong> a reloading st<strong>at</strong>ion for<br />

wastes and a regional center for recyclable wastes<br />

Compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions, handling <strong>of</strong> the award <strong>of</strong> contracts<br />

and supervison <strong>of</strong> the construction <strong>of</strong> a tre<strong>at</strong>ment plant for solid<br />

recovered fuels (SRF) for the input into a <strong>at</strong>mospheric fluidized<br />

bed combustion, capacity 75t/h in Schwedt/Germany<br />

in cooper<strong>at</strong>ion with company Envicare<br />

Compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions, handling <strong>of</strong> the award <strong>of</strong> contracts<br />

and supervision <strong>of</strong> the rebuilding <strong>of</strong> the cinder g<strong>at</strong>e <strong>of</strong> rotary<br />

kiln, capacity 2,000 t/a<br />

Approval planning according to the Austria Waste Management<br />

Act, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions, handling <strong>of</strong> the award <strong>of</strong><br />

contracts and assistance in supervision for the rebuilding <strong>of</strong> a<br />

splitting plant for commercial waste , capacity 70,000 t/a<br />

Completion document for a solid recovered fuel (SRF-) plant with<br />

a capacity 90,000 t/a and the construction <strong>of</strong> an intermedi<strong>at</strong>e<br />

storage <strong>of</strong> high caloric value wastes with a capacity 5,000 t/a in<br />

Retznei<br />

25


2006<br />

26<br />

Bakonyi Eomü<br />

Részvénytáraság<br />

Ajka/HU<br />

Fernwärme Wien GmbH<br />

Wien/A<br />

Abfallwirtschaftsverband<br />

Lavanttal<br />

Lavamünd/A<br />

Zuser Umweltservice<br />

GmbH<br />

Peggau/A<br />

EWB<br />

Entsorgungswirtschaft am<br />

Bodensee GmbH<br />

Lustenau/A<br />

ZUMA<br />

BeteiligungsgesmbH & Co<br />

Abfallst<strong>of</strong>fverwertungs KG<br />

Wien/A<br />

A&ABA Altst<strong>of</strong>f & Abfall<br />

Behandlungs Anlage<br />

GmbH<br />

Maria Buch-Feistritz/A<br />

Hubert Häusle GmbH<br />

Lustenau/A<br />

Ecorec d.o.o. Serbia<br />

Novi Popovac/SRB<br />

Recycling und Transport<br />

GmbH<br />

Theresienfeld/A<br />

Abfallwirtschaftsverband<br />

Liezen<br />

Liezen/A<br />

Holcim (Bulgaria) AD<br />

Beli Izvor/BG<br />

Holcim (Romania) SA<br />

Alesd/RO<br />

Pre-design, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions, handling <strong>of</strong> the call for<br />

tenders, award <strong>of</strong> contracts for the construction <strong>of</strong> conveyor,<br />

storage and dosing systems <strong>of</strong> solid recovered fuels <strong>of</strong> wastes<br />

for feeding a fluidized bed combustion, capacity 150,000 t/a<br />

Approval planning for a reconstruction <strong>of</strong> the slag output system<br />

<strong>of</strong> rotary kiln, capacity 20,000 t/a<br />

Approval planning according to the Waste Management Act for<br />

the construction <strong>of</strong> reloading st<strong>at</strong>ion for wastes and a regional<br />

waste m<strong>at</strong>erial collection center<br />

Approval planning according to the Austrian Waste Management<br />

Act for the prepar<strong>at</strong>ion <strong>of</strong> solid recovered fuels (SRF), capacity<br />

60,000 t/a<br />

Pre-design, approval planning according to the Waste<br />

Management Act, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions, handling <strong>of</strong> the<br />

call for tenders, award <strong>of</strong> contracts and supervision <strong>of</strong><br />

construction for a sorting plant <strong>of</strong> packaging and plastic waste<br />

<strong>of</strong> commercial waste in Lustenau, capacity 42,000 t/a<br />

Approval planning according to the Waste Management Act for a<br />

reloading st<strong>at</strong>ion <strong>of</strong> wastes with mechanical tre<strong>at</strong>ment, capacity<br />

90,000 t/a<br />

Approval planning according to the Waste Management Act for<br />

the extension <strong>of</strong> an existing solid recovered fuel (SRF) tre<strong>at</strong>ment<br />

plant, capacity 35,000 t/a<br />

Approval procedure according to the Austrian Environmental<br />

Impact Assessment Act for a waste tre<strong>at</strong>ment plant, capacity<br />

150,000 t/a<br />

Pre-design for a solid recovered fuel (SRF)-tre<strong>at</strong>ment incl. a<br />

intermedi<strong>at</strong>e storage and feeding into the thermal tre<strong>at</strong>ment<br />

process in the cement plant, capacity 10,000 t/a;<br />

Pre-design and approval procedure for a dry-mechanical waste<br />

tre<strong>at</strong>ment plant with a capacity <strong>of</strong> 34,000 t/a<br />

Compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions, handling <strong>of</strong> the call for tenders,<br />

award <strong>of</strong> contracts and supervision <strong>of</strong> the extension <strong>of</strong> a<br />

mechanical tre<strong>at</strong>ment plant, capacity 25,000 t/a<br />

Pre-design, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions, handling <strong>of</strong> the call for<br />

tenders, award <strong>of</strong> contracts and supervision <strong>of</strong> construction for a<br />

solid recovered fuel (SRF)-tre<strong>at</strong>ment incl. a intermedi<strong>at</strong>e storage<br />

and feeding into the thermal tre<strong>at</strong>ment process in the cement<br />

plant, capacity 20,000 t/a;<br />

Pre-design, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions, handling <strong>of</strong> the call for<br />

tenders, award <strong>of</strong> contracts and supervision for foreign supply<br />

for a solid recovered fuel (SRF)-tre<strong>at</strong>ment incl. a intermedi<strong>at</strong>e<br />

storage and feeding into the thermal tre<strong>at</strong>ment process in the<br />

cement plant, capacity 20,000 t/a;


2005<br />

2004<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

SAB Salzburger<br />

Abfallbeseitigung GmbH<br />

Bergheim/A<br />

Freudenthaler Recycling<br />

GmbH & Co KG<br />

Inzing/A<br />

W&P Wietersdorfer &<br />

Peggauer Zementwerke<br />

GmbH<br />

Klein St. Paul/A<br />

Fernwärme Wien GmbH<br />

Wien/A<br />

WAV Betriebsführung<br />

GmbH<br />

Wels/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

ecorec Slovenska s.r.o.<br />

Pezinok/SK<br />

ecorec Česko s.r.o.<br />

Tremosnice/CZ<br />

AMAND Umwelttechnik<br />

Lockwitz GmbH & Co. KG<br />

Dresden/A<br />

Müllex Umweltsäuberungs<br />

GmbH<br />

Gleisdorf/A<br />

Pre-design and approval planning, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions,<br />

handling <strong>of</strong> the call for tenders, award <strong>of</strong> contracts and<br />

supervision <strong>of</strong> construction for a mechanical waste tre<strong>at</strong>ment<br />

plant with an autom<strong>at</strong>ic sorting system for packaging waste,<br />

paper and commercial waste with a capacity <strong>of</strong> 50,000 t/a<br />

Approval planning and handling <strong>of</strong> the administr<strong>at</strong>ive procedure<br />

according to the Waste Management Act, compil<strong>at</strong>ion <strong>of</strong><br />

specific<strong>at</strong>ions, handling <strong>of</strong> the call for tenders, award <strong>of</strong><br />

contracts and supervision <strong>of</strong> construction and assistance till<br />

commencement <strong>of</strong> oper<strong>at</strong>ions for the exchange <strong>of</strong> a primary<br />

shredder for household and commercial waste with a capacity <strong>of</strong><br />

70,000 t/a<br />

Approval procedure <strong>of</strong> shredding <strong>of</strong> different packages – incl.<br />

the VEXAT-document<br />

Detail planning <strong>of</strong> SRF-tre<strong>at</strong>ment plant with intermedi<strong>at</strong>e bunker,<br />

call for tenders and awards <strong>of</strong> contracts, capacity 55,000 t/a<br />

Detailplanning <strong>of</strong> a take-over st<strong>at</strong>ion for waste incl. an<br />

intermedi<strong>at</strong>e storage, final control <strong>of</strong> the m<strong>at</strong>erial and input into<br />

the thermal tre<strong>at</strong>ment process, capacity 44,000 t/a;<br />

as sub-contractor <strong>of</strong> the company VEP<br />

Detailplanning <strong>of</strong> SRF-tre<strong>at</strong>ment plant and support <strong>of</strong> choosing<br />

the process <strong>of</strong> the technical parts, capacity 100,000 t/a<br />

Retr<strong>of</strong>itting <strong>of</strong> an existing waste splitting plant (capacity <strong>of</strong><br />

30,000 t/a), design work, approval planning and handling <strong>of</strong> the<br />

administr<strong>at</strong>ive procedure, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions, handling<br />

<strong>of</strong> the call for tenders and the award <strong>of</strong> contracts and<br />

supervision till commencement <strong>of</strong> oper<strong>at</strong>ions<br />

Approval procedure <strong>of</strong> reorganiz<strong>at</strong>ion <strong>of</strong> an oper<strong>at</strong>ing site in<br />

regard to the st<strong>at</strong>e <strong>of</strong> approval and increase with a electrical<br />

waste tre<strong>at</strong>ment plant and a scrap wood tre<strong>at</strong>ment plant,<br />

capacity 90,000 t/a<br />

Reconstruction <strong>of</strong> an existing SRF-tre<strong>at</strong>ment plant, feasibility<br />

study, handling <strong>of</strong> the call for tenders and award <strong>of</strong> contracts,<br />

supervision, start-up, capacity 15,000 t/a<br />

Reconstruction <strong>of</strong> an existing SRF-tre<strong>at</strong>ment plant, feasibility<br />

study, handling <strong>of</strong> the call for tenders and award <strong>of</strong> contracts,<br />

supervision, start-up<br />

Handling <strong>of</strong> the start-up and acceptance test <strong>of</strong> a SRF-tre<strong>at</strong>ment<br />

plant, capacity 110,000 t/a<br />

Approval planning and handling <strong>of</strong> the administr<strong>at</strong>ive procedure<br />

for an SRF tre<strong>at</strong>ment plant for 8,000 t/a<br />

27


2003<br />

2002<br />

28<br />

Zuser Umweltservice<br />

GmbH<br />

Peggau/A<br />

KAB Kärntner<br />

Abfallbewirtschaftung<br />

GmbH Klagenfurt/A<br />

Müllex Umweltsäuberungs<br />

GmbH<br />

Gleisdorf/A<br />

Thermo Team GmbH<br />

Retznei/A<br />

AVN<br />

Dürnrohr/A<br />

Trügler GmbH<br />

Bruck an der Mur/A<br />

Ing. Rudolf Rottner GmbH<br />

Fischamend/A<br />

Thermo Team GmbH<br />

Retznei/A<br />

UEG Umwelt- und<br />

Entsorgungstechnik AG<br />

Neuseiersberg/A<br />

Freudenthaler AG<br />

Inzing/A<br />

UEG Umwelt- und<br />

Entsorgungstechnik AG<br />

Neuseiersberg/A<br />

Approval planning and handling <strong>of</strong> the administr<strong>at</strong>ive procedure<br />

for the expansion <strong>of</strong> a waste tre<strong>at</strong>ment company, including a<br />

scrap wood tre<strong>at</strong>ment plant, SRF tre<strong>at</strong>ment plant as well as an<br />

oper<strong>at</strong>ion shop and corresponding storage facilities<br />

Approval planning according to the Waste Management Act for a<br />

dry-mechanical waste tre<strong>at</strong>ment plant with a capacity <strong>of</strong> 34,900<br />

t/a<br />

Compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions, handling <strong>of</strong> the call for tenders<br />

and award <strong>of</strong> contracts, supervision <strong>of</strong> construction and<br />

assistance till commencement <strong>of</strong> oper<strong>at</strong>ions <strong>of</strong> an SRF tre<strong>at</strong>ment<br />

plant for 8,000 t/a<br />

Design work and approval planning according to the Waste<br />

Management Act for a tre<strong>at</strong>ment plant for RDF to be used in the<br />

cement industry (input <strong>of</strong> 55,000 t/a, licensed for 90,000 t/a)<br />

Detailed design work and comparison <strong>of</strong> several methods for an<br />

autom<strong>at</strong>ic container discharging facility from the train to the<br />

waste bunker <strong>of</strong> a waste inciner<strong>at</strong>ion plant with a capacity <strong>of</strong><br />

300,000 t/a<br />

Approval planning and handling <strong>of</strong> the administr<strong>at</strong>ive procedure<br />

for the expansion <strong>of</strong> the existing plant loc<strong>at</strong>ion <strong>of</strong> a waste<br />

splitting plant with a capacity <strong>of</strong> 25,000 t/a<br />

Design work and approval planning according to the Waste<br />

Management Act, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions rel<strong>at</strong>ing to<br />

process engineering, handling <strong>of</strong> the EU-wide call for tenders<br />

and award <strong>of</strong> contracts, supervision <strong>of</strong> the construction <strong>of</strong> a drymechanical<br />

waste sorting plant including a wind screening plant<br />

in order to derive the high caloric light fraction, capacity <strong>of</strong><br />

27,000 t/a <strong>of</strong> commercial and household waste<br />

Compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions rel<strong>at</strong>ing to process engineering,<br />

handling <strong>of</strong> the EU-wide call for tenders and award <strong>of</strong> contracts,<br />

supervision <strong>of</strong> construction and assistance till commencement <strong>of</strong><br />

oper<strong>at</strong>ions <strong>of</strong> a tre<strong>at</strong>ment plant for SRF for use in the cement<br />

industry, capacity <strong>of</strong> 55,000 t/a (licensed for 90,000 t/a)<br />

Design work, approval planning and handling <strong>of</strong> the<br />

administr<strong>at</strong>ive procedure, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions, handling<br />

<strong>of</strong> the award <strong>of</strong> contracts for the construction <strong>of</strong> a tre<strong>at</strong>ment<br />

plant for shredder waste (light fraction) with a capacity <strong>of</strong><br />

50,000 t/a<br />

Design work and approval planning according to the Waste<br />

Management Act, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions rel<strong>at</strong>ing to<br />

process engineering, handling <strong>of</strong> the call for tenders and award<br />

<strong>of</strong> contracts and supervision <strong>of</strong> the construction <strong>of</strong> a drymechanical<br />

waste sorting plant including a wind screening plant<br />

in order to derive the high caloric light fraction, capacity <strong>of</strong><br />

17,000 t/a <strong>of</strong> commercial and household waste<br />

Design work and handling <strong>of</strong> the administr<strong>at</strong>ive procedure,<br />

compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions and handling <strong>of</strong> the award <strong>of</strong><br />

contracts for the “Recycling Center Eisenerz” fe<strong>at</strong>uring a drymechanical<br />

tre<strong>at</strong>ment plant for 40,000 t/a <strong>of</strong> pre-tre<strong>at</strong>ed<br />

commercial waste and 30,000 t/a <strong>of</strong> shredder waste (light<br />

fraction) in order to derive the high caloric as well as the<br />

disposable light fractions


2001<br />

2000<br />

1999<br />

1998<br />

Müllex<br />

Umweltsäuberungs-<br />

Ges.m.b.H.<br />

Pirching/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

Amand Umwelttechnik<br />

Lockwitz<br />

Dresden/GER<br />

Zuser Umweltservice<br />

GmbH<br />

Peggau/A<br />

Thermo Team<br />

Altern<strong>at</strong>ivbrennst<strong>of</strong>fverwertungs<br />

GmbH<br />

Ehrenhausen/A<br />

Müllex<br />

Umweltsäuberungs-<br />

Ges.m.b.H.<br />

Pirching/A<br />

ZUMA<br />

Abfallst<strong>of</strong>fverwertung<br />

Wien/A<br />

Planungsgemeinschaft<br />

ATM - IKB<br />

Innsbruck/A<br />

Keske Entsorgung GmbH<br />

Braunschweig/GER<br />

Lobbe MTU GmbH<br />

Tirol/A<br />

Schlager GmbH<br />

Graz/A<br />

Amand Umwelttechnik<br />

Lockwitz GmbH/GER<br />

Koronis S.A. - Envitec für<br />

die Stadt Athen/GR<br />

Lobbe MTU GmbH<br />

Tirol/A<br />

Compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions and handling <strong>of</strong> the award <strong>of</strong><br />

contracts, project management and supervision <strong>of</strong> the<br />

construction <strong>of</strong> a mechanical waste tre<strong>at</strong>ment plant for 30,000<br />

t/a<br />

Approval planning for an SRF tre<strong>at</strong>ment plant for plastic waste,<br />

capacity <strong>of</strong> 8,000 t/a<br />

Approval planning and detailed design work for an SRF<br />

tre<strong>at</strong>ment plant for 100,000 t/a<br />

Approval planning pursuant to the Waste Management Act for a<br />

plant loc<strong>at</strong>ion handling 150,000 t/a<br />

Approval planning for an SRF tre<strong>at</strong>ment plant for 90,000 t/a<br />

including the design <strong>of</strong> the necessary logistic facilities for the<br />

removal <strong>of</strong> the produced SRF<br />

Approval planning for a dry-mechanical waste tre<strong>at</strong>ment plant<br />

with a capacity <strong>of</strong> 50,000 t/a and integr<strong>at</strong>ion <strong>of</strong> existing facilities<br />

on a new oper<strong>at</strong>ing site<br />

Pre-project including the economic evalu<strong>at</strong>ion <strong>of</strong> a commercial<br />

waste sorting plant for 30,000 t/a<br />

Design <strong>of</strong> an SRF tre<strong>at</strong>ment plant for 100,000 t/a<br />

Handling <strong>of</strong> the licensing procedure for a reloading st<strong>at</strong>ion and a<br />

recycling center for 120,000 t/a <strong>of</strong> commercial waste<br />

Handling <strong>of</strong> the licensing procedure for the construction <strong>of</strong> a<br />

residual waste tre<strong>at</strong>ment plant with a capacity <strong>of</strong> 30,000 t/a<br />

Approval planning for a noise protection wall<br />

Feasibility study and detailed design work for the expansion for<br />

a waste tre<strong>at</strong>ment plant<br />

Design <strong>of</strong> a mechanical residual waste tre<strong>at</strong>ment plant including<br />

the thermal utiliz<strong>at</strong>ion <strong>of</strong> the high caloric fraction, 85,000 t/a<br />

Basic and detailed engineering <strong>of</strong> the RDF tre<strong>at</strong>ment and the<br />

heavy fraction for the composting <strong>of</strong> a residual-waste-splitting<br />

plant (1,200 t/d) for the region Attika (Athens)<br />

Basic and detailed engineering<br />

Concept for construction <strong>of</strong> a residual-waste-splitting-plant<br />

Prepar<strong>at</strong>ion <strong>of</strong> a oper<strong>at</strong>ing cost calcul<strong>at</strong>ion<br />

Engineering <strong>of</strong> the expansion <strong>of</strong> a metal separ<strong>at</strong>or plant<br />

Prepar<strong>at</strong>ion <strong>of</strong> a oper<strong>at</strong>ing cost calcul<strong>at</strong>ion<br />

29


1997<br />

1996<br />

1995<br />

1994<br />

30<br />

Prazské Sluzby a.s.<br />

Praha/CZ<br />

Amand Umwelttechnik<br />

Grumbach GmbH<br />

Grumbach/GER<br />

AEVG Abfall-Entsorgungs-<br />

u. Verarbeitungs<br />

Ges.m.b.H<br />

Graz/A<br />

Stadtreinigung Dresden<br />

GmbH/GER<br />

Georg K<strong>at</strong>zlberger<br />

Ges.m.b.H. & Co. KG<br />

Mettmach/A<br />

Kröpfel Ges.m.b.H.<br />

Attnang-Puchheim/A<br />

RSA GmbH<br />

Marienberg/GER<br />

Austrian Energy &<br />

Environment<br />

Graz/A<br />

Loacker Recycling GmbH<br />

Götzis/A<br />

Ost-Styria Recycling<br />

Gleisdorf/A<br />

RVL Restst<strong>of</strong>fverwertung<br />

Lenzing-Invest-GmbH<br />

&CoKG<br />

Lenzing/A<br />

Gustav Scherrieble KG<br />

Esslingen/GER<br />

Vorwagner GesmbH &<br />

CoKG<br />

Pinsdorf/A<br />

AVL Abfallverwertungsges.<br />

des Landkreis<br />

Ludwigsburg mbH<br />

Bietingheim-Bissingen/GER<br />

AWE GmbH<br />

Dohna bei Dresden/GER<br />

Saubermacher Süd d.o.o.<br />

Murska Sobota/SLO<br />

ABRG Abfallbehandlungs-<br />

und Recycling GmbH<br />

Arnoldstein/A<br />

Engineering <strong>of</strong> a sorting plant for packaging waste for the city<br />

Praha (25,000 t/a)<br />

Detailed engineering <strong>of</strong> the method <strong>of</strong> residual-waste-splitting<br />

for 100,000 t/a <strong>at</strong> the loc<strong>at</strong>ion Grumbach<br />

Expansion <strong>of</strong> the residual waste tre<strong>at</strong>ment unit<br />

Draft engineering <strong>of</strong> a mechanical residual waste tre<strong>at</strong>ment plant<br />

<strong>at</strong> the Radeburger Straße landfill<br />

Approval planning according to §29 AWG for a sorting plant<br />

Adapt<strong>at</strong>ion and expansion <strong>of</strong> existing plants to a residual waste<br />

splitting plant<br />

Approval planning for a mixed plastic waste sorting plant<br />

Consult<strong>at</strong>ive work and design <strong>of</strong> the fuel supply system and the<br />

intermedi<strong>at</strong>e storage in a fluidized – bed boiler (100 MW) for the<br />

light fraction<br />

Approval planning for a waste management centre<br />

Approval planning for a transfer st<strong>at</strong>ion<br />

Design <strong>of</strong> the residual waste storage facility and the mechanical<br />

RDF tre<strong>at</strong>ment for a fluidized-bed boiler (100 MW)<br />

Adjustment <strong>of</strong> an existing commercial waste sorting plant to the<br />

requirements <strong>of</strong> the DSD-sorting method<br />

Approval planning for a sorting plant according to<br />

§ 29 <strong>of</strong> the Waste Management Act<br />

Draft engineering for a thermal tre<strong>at</strong>ment facility for the light<br />

fraction (40 MW)<br />

Draft engineering for a plant using the „RESIDUAL WASTE<br />

SPLITTING-SYSTEM“ (35,000 t/a), conditioning, Rott, thermal<br />

tre<strong>at</strong>ment <strong>of</strong> the light fraction in a paper factory<br />

Design <strong>of</strong> a waste tre<strong>at</strong>ment plant and several waste collection<br />

centers for the Region <strong>of</strong> Celje/Slovenia<br />

Design work and logistic concept for the storage and tre<strong>at</strong>ment<br />

<strong>of</strong> anorganic waste in Arnoldstein


1993<br />

1992<br />

Baufeld Austria GmbH<br />

Wien/A<br />

Grübler Recycling &<br />

Entsorgungswirtschaft<br />

Annaberg/GER<br />

Grüne Tonne Neunkirchen<br />

Ges.m.b.H./A<br />

Schlager Ges.m.b.H.<br />

Graz/A<br />

Granuplast<br />

Kunstst<strong>of</strong>fverwertung<br />

GmbH<br />

Wien/A<br />

ard-Asphalt Recycling<br />

GmbH<br />

Dresden/GER<br />

ARGE Leithäusl-<br />

K<strong>at</strong>zlberger<br />

Mehrnbach, Mettmach/A<br />

ARW Altst<strong>of</strong>frecycling Wien<br />

GmbH/A<br />

AVL Abfallverwertungsges.<br />

d. Landkreis Ludwigsburg<br />

mbH<br />

Bietigheim-Bissingen/GER<br />

NGV Nürnberger<br />

Gewerbemüll Ver-wertung<br />

GmbH & Co KG<br />

Nürnberg/GER<br />

Sächsische Baust<strong>of</strong>funion<br />

Dresden AG<br />

Dresden/GER<br />

Welser Abfallverwertung<br />

Ges.m.b.H<br />

Wels/A<br />

abr Asphalt-Beton-<br />

Recycling GmbH<br />

Riesa/GER<br />

BWG Weiz Baust<strong>of</strong>f-<br />

Wiederverwertungs<br />

Ges.m.b.H.<br />

Unterpremstätten/A<br />

Dornetshuber Ges.m.b.H.<br />

& Co KG<br />

Peuerbach/A<br />

Design <strong>of</strong> a processing plant for plastic waste (60,000 t/a) as a<br />

prepar<strong>at</strong>ion for its thermal utiliz<strong>at</strong>ion in the cement industry<br />

Engineering <strong>of</strong> a sorting plant for commercial waste and light<br />

fraction (performance: 15,000 Mg/a) in Annaberg, Saxony<br />

Expansion <strong>of</strong> an existing sorting plant for dry waste<br />

Approval planning for a sorting plant according to § 29 AWG<br />

(waste tre<strong>at</strong>ment law)<br />

Project management and supervision <strong>of</strong> construction <strong>of</strong> a plastic<br />

recycling plant (15,000 Mg/a)<br />

Engineering <strong>of</strong> a half-mobile sorting plant for demolition waste<br />

(performance: 30,000 t/a) in Dresden<br />

Engineering <strong>of</strong> a sorting plant for packaging m<strong>at</strong>erial<br />

Engineering <strong>of</strong> a sorting plant for commercial and building waste<br />

(40,000 t/a) in Vienna<br />

Engineering <strong>of</strong> a plant using the "RESIDUAL WASTE-SPLITTING-<br />

METHOD" (28,000 t/a) for the district <strong>of</strong> Ludwigsburg<br />

Planning and supervision <strong>of</strong> the install<strong>at</strong>ion <strong>of</strong> a sorting robot (2<br />

grip arm systems) into the composting plant <strong>of</strong> Häldenmühle<br />

Design <strong>of</strong> a shredder plant for plastic waste<br />

Basic engineering <strong>of</strong> a sorting plant for commercial waste<br />

(50,000 t/a) for the City <strong>of</strong> Dresden<br />

Design <strong>of</strong> a sorting plant for commercial waste and packaging<br />

waste as well as <strong>of</strong> a shredder plant for residual waste with a<br />

capacity <strong>of</strong> 30,000 t/a<br />

Engineering <strong>of</strong> a waste management center including facilities<br />

for industrial waste sorting, demolition waste processing, mixed<br />

construction waste sorting, used lumber size reduction, sewage<br />

sludge drying, power/he<strong>at</strong> gener<strong>at</strong>ion, contamin<strong>at</strong>ed soil<br />

scrubbing <strong>at</strong> Riesa/Saxony<br />

Engineering <strong>of</strong> an industrial waste sorting facility (8,500 t/a) for<br />

the district <strong>of</strong> Weiz, Styria<br />

Engineering <strong>of</strong> a mixed construction waste processing plant <strong>at</strong><br />

Eferding<br />

31


1991<br />

1990<br />

32<br />

Landr<strong>at</strong>samt Garmisch-<br />

Partenkirchen/GER<br />

GWV Gesellschaft für<br />

Wertst<strong>of</strong>fverwertung mbH<br />

Remseck/GER<br />

Hettegger Sepp & Söhne<br />

Transport-unternehmen<br />

KG<br />

Schwarzbach in Pongau/A<br />

Pfitzenmeier + Rau<br />

Knittlingen/GER<br />

Trans-Beton Ges.m.b.H.<br />

Bruck an der Mur/A<br />

Welser Abfallverwertung<br />

Ges.m.b.H.<br />

Wels/A<br />

AVL Abfallverwertungsges.<br />

d. LK Ludwigsburg mbH<br />

Bietigheim-Bissingen/GER<br />

Kurz Recycling GmbH<br />

Schwaigern/GER<br />

Amt der OÖ<br />

Landesregierung/A<br />

O.Ö. Landes-<br />

Abfallverwertungsunterne<br />

hmen Ges. m.b.H./A<br />

AEVG Abfall-Entsorgungs-<br />

u. Verwerttungs Ges.m.b.H<br />

Graz/A<br />

Bormann<br />

GmbH & Co KG<br />

Dossenheim/GER<br />

Burgenländischer<br />

Müllverband<br />

Oberpullendorf/A<br />

Landr<strong>at</strong>samt Garmisch<br />

Partenkirchen/GER<br />

GWV Gesellschaft<br />

für Wertst<strong>of</strong>f-verwertung<br />

mbH<br />

Remseck/GER<br />

Engineering <strong>of</strong> an industrial waste sorting and mixed<br />

construction waste tre<strong>at</strong>ment plant (19,000 t/a) for the rural<br />

district <strong>of</strong> Garmisch Partenkirchen/G<br />

Engineering <strong>of</strong> an industrial waste sorting plant (50,000 t/a) for<br />

the rural district <strong>of</strong> Ludwigsburg <strong>at</strong> Benningen<br />

Engineering <strong>of</strong> an industrial waste sorting plant and bulky and<br />

residual waste tre<strong>at</strong>ment facility (13,000 t/a)<br />

Project work for a broken glass tre<strong>at</strong>ment facility with ceramics,<br />

stone, porcelain separ<strong>at</strong>ion and sorting by colour (200,000 t/a)<br />

Engineering <strong>of</strong> a tre<strong>at</strong>ment facility handling waste from<br />

construction sites and industrial waste for the district<br />

Bruck/Mur/Styria<br />

Preliminary project for a waste management center fe<strong>at</strong>uring a<br />

sorting plant for industrial waste, a composting plant for<br />

biogenic waste, a sorting plant for mixed construction site<br />

rubble, a tre<strong>at</strong>ment plant for demolition waste, the tre<strong>at</strong>ment <strong>of</strong><br />

contamin<strong>at</strong>ed sites and a recycling plant for plastic waste<br />

Engineering <strong>of</strong> a recycling park including sorting plants for<br />

commercial waste, DSD-light fraction and plastics processing <strong>at</strong><br />

Benningen<br />

Engineering <strong>of</strong> an industrial waste sorting plant (12,000 t/a) <strong>at</strong><br />

Schwaigern/LKR Heilbronn<br />

Engineering <strong>of</strong> a sorting plant (14,000 t/a) handling plastics<br />

from recycling yards<br />

Engineering <strong>of</strong> a central storehouse with sorting plant and<br />

plastics processing plant for m<strong>at</strong>erial from approx. 100 recycling<br />

yards<br />

Engineering <strong>of</strong> the install<strong>at</strong>ion <strong>of</strong> a flow divider and a size<br />

reduction unit in the existing waste processing plant<br />

Projekt planning for a commercial waste plant (35,000 t/a) for<br />

Sinsheim<br />

Detail engineering for the reconstruction <strong>of</strong> all transfer st<strong>at</strong>ions<br />

Engineering <strong>of</strong> recycling yards <strong>at</strong> Murnau, Mittenwald and<br />

Oberammergau<br />

Preliminary project planning for a commercial waste sorting<br />

plant <strong>at</strong> Eschenhohe<br />

Engineering <strong>of</strong> a processing plant for commercial waste,<br />

collected m<strong>at</strong>erials, demolition waste and mixed construction<br />

waste <strong>at</strong> Remseck


1989<br />

Hubert Häusle<br />

Ges.m.b.H. & Co KG<br />

Dornbirn/A<br />

NGV Nürnberger<br />

Gewerbemüll Verwertung<br />

GmbH & Co KG/GER<br />

Abfallwirtschaftsverband<br />

Schladming/A<br />

Toifelhart Ges.m.b.H.<br />

Wien/A<br />

Landr<strong>at</strong>samt<br />

Wunsiedel/GER<br />

AEVG Abfall-Entsorgungs-<br />

u. Verwertungs Ges.m.b.H.<br />

Graz/A<br />

CANURO für Waste<br />

Management Inc.<br />

USA<br />

Fischer Recycling<br />

Ravensburg/GER<br />

Hubert Häusle<br />

Ges.m.b.H./A<br />

Jumbo Gammisch<br />

Bayreuth/GER<br />

Schlager Ges.m.b.H.<br />

Graz/A<br />

Engineering <strong>of</strong> a commercial waste sorting plant (30,000 t/a) for<br />

the Bodensee district<br />

Design <strong>of</strong> a commercial waste sorting plant (100,000 t/a)<br />

Engineering <strong>of</strong> a commercial waste sorting plant (3,000 t/a)<br />

Design <strong>of</strong> a processing plant for demolition waste, mixed<br />

construction site rubble and leaf and yard wastes (120,000 t/a)<br />

in Simmering<br />

Engineering <strong>of</strong> a commercial waste sorting plant (25,000 t/a)<br />

Design work for an industrial waste sorting plant (16,000 t/a)<br />

Engineering <strong>of</strong> a commercial waste sorting plant (2,200 t/a) for<br />

Sunnyvale (California, U.S.A.)<br />

Engineering <strong>of</strong> a sorting plant handling (400 t/a) for<br />

Oakland/Michigan, U.S.A.<br />

Reconstruction and general rehabilit<strong>at</strong>ion <strong>of</strong> the Freiburg<br />

m<strong>at</strong>erials recycling plant<br />

Design <strong>of</strong> a commercial waste sorting plant (35,000 t/a)<br />

Design work for a plant converting foamed polystyrene waste<br />

(Styr<strong>of</strong>oam) to reusable polystyrene Tendering<br />

Engineering <strong>of</strong> a commercial waste sorting plant for 8,000 t/a<br />

33


Biological waste tre<strong>at</strong>ment<br />

2011<br />

2010<br />

2009<br />

2008<br />

2007<br />

2005<br />

34<br />

Ragn-Sells AS<br />

Tallinn/EE<br />

Ekokem Oy Ab<br />

Riihimäki/FI<br />

ZEMKA Ges.m.b.H.<br />

Zell am See/A<br />

Saubermacher Slovenija<br />

d.o.o.<br />

Murska Sobota/SLO<br />

SAB Salzburger<br />

Abfallbeseitigung GmbH<br />

Bergheim/A<br />

Ragn-Sells AS<br />

Tallinn/Estonia<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

Abfallwirtschaftsverband<br />

Liezen<br />

Liezen/A<br />

ZEMKA Ges.m.b.H.<br />

Zell am See/A<br />

Abfallwirtschaftsverband<br />

Liezen<br />

Liezen/A<br />

RSVG Restst<strong>of</strong>fvertriebs<br />

GmbH<br />

Eisenerz/A<br />

Abfallwirtschaftsverband<br />

Liezen<br />

Liezen/A<br />

Supervision <strong>of</strong> the construction <strong>of</strong> a mechanical biological waste<br />

tre<strong>at</strong>ment plant in Tallinn/Estland with a capacity <strong>of</strong> 88,500 t/a<br />

Compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions for the ferment<strong>at</strong>ion <strong>of</strong> a fine<br />

fraction rich in organic substances gained from residental waste;<br />

capacity <strong>of</strong> 35,000 t/a;<br />

jointly with EnviCare<br />

Approval procedure for the completion <strong>of</strong> the mechanical<br />

tre<strong>at</strong>ment in the mechanical biological tre<strong>at</strong>ment plant <strong>of</strong> ZEMKA<br />

with a capacity <strong>of</strong> 61,300 t/a<br />

Analysis <strong>of</strong> possiblities for the construction <strong>of</strong> a biological<br />

tre<strong>at</strong>ment plant for the high organic-content fraction from<br />

domestic waste with a capacity <strong>of</strong> 30,000 t/a;<br />

jointly with EnviCare<br />

Pre-design, approval planning according to the Waste<br />

Management Act, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions, tendering and<br />

procurement procedures according the Austrian trade law,<br />

construction supervision and commissioning <strong>of</strong> the conversion<br />

<strong>of</strong> Lane 3 <strong>of</strong> the mechanical biological residual waste tre<strong>at</strong>ment<br />

plant with an overall capacity <strong>of</strong> 154,000 t/a<br />

Verific<strong>at</strong>ion <strong>of</strong> implement<strong>at</strong>ion planning <strong>of</strong> a supplier for the<br />

construction <strong>of</strong> a mechanical biological waste tre<strong>at</strong>ment plant in<br />

Tallinn/Estonia with a capacity <strong>of</strong> 80,000 t/a.<br />

Verific<strong>at</strong>ion <strong>of</strong> implement<strong>at</strong>ion planning <strong>of</strong> a supplier for the<br />

construction <strong>of</strong> a mechanical biological waste tre<strong>at</strong>ment plant in<br />

Varna/Bulgaria with a capacity <strong>of</strong> 140,000 t/a.<br />

Pre-design, draft planning, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ion and<br />

handling <strong>of</strong> the award <strong>of</strong> contracts <strong>of</strong> an extension <strong>of</strong> the<br />

conveying system with the capacity <strong>of</strong> 16 t/h <strong>of</strong> a mechanicalbiological<br />

waste tre<strong>at</strong>ment plant<br />

Pre-design and approval planning according to the Austrian<br />

Waste Management Act, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ion and<br />

handling <strong>of</strong> the EU-wide call for tenders and construction<br />

supervision for an upgrading <strong>of</strong> the mechanical tre<strong>at</strong>ment <strong>of</strong> the<br />

mechanical-biological waste tre<strong>at</strong>ment plant <strong>of</strong> the company<br />

ZEMKA, capacity 61,300 t/a<br />

Approval planning according to the Waste Management Act for a<br />

mechanical biological waste tre<strong>at</strong>ment plant with a capacity<br />

25,000 t/a and a composting plant with a capacity 6,000 t/a<br />

Pre-design and approval planning according to Waste<br />

Management Act for the upgrading <strong>of</strong> a biological waste<br />

tre<strong>at</strong>ment plant according to the st<strong>at</strong>e <strong>of</strong> the art<br />

Pre-design and approval planning according to the Waste<br />

Management Act, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions, handling <strong>of</strong> the<br />

call for tenders and construction supervision for an upgrading <strong>of</strong><br />

an existing mechanical-biological waste tre<strong>at</strong>ment plant with<br />

secondary shredder, capacity 14 t/h


2004<br />

2003<br />

2002<br />

2001<br />

2000<br />

Servus Abfall<br />

Dienstleistungs GmbH &<br />

Co KG<br />

Graz/A<br />

UEG Intern<strong>at</strong>ional Holding<br />

GmbH<br />

Neuseiersberg/A<br />

Servus Abfall<br />

Dienstleistungs<br />

GmbH&CoKG<br />

Graz/A<br />

SAB Salzburger<br />

Abfallbeseitigung GmbH<br />

Bergheim/A<br />

Servus Abfall<br />

Dienstleistungs<br />

GmbH&CoKG<br />

Graz/A<br />

Abfallwirtschaftsverband<br />

Liezen<br />

Liezen/A<br />

SAB Salzburger<br />

Abfallbeseitigung GmbH<br />

Bergheim/A<br />

Georg K<strong>at</strong>zlberger<br />

GesmbH & Co KG<br />

Mettmach/A<br />

NUA<br />

Niederösterreichische<br />

Umweltschutzanstalt /<br />

AVN Abfallverwertung NÖ<br />

Ges.m.b.H.<br />

Maria Enzersdorf/A<br />

Gemeindebetriebe<br />

Frohnleiten GmbH<br />

Frohnleiten/A<br />

Gemeindebetriebe<br />

Frohnleiten GmbH<br />

Frohnleiten/A<br />

Saubermacher Süd<br />

Murska Sobota / SLO<br />

Final approval procedure according to the Austrian law <strong>of</strong><br />

environmental impact assessment <strong>of</strong> the mechanical-biological<br />

waste tre<strong>at</strong>ment plant Frohnleiten, capacity 65,000 t/a<br />

Pre-design, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions, handling <strong>of</strong> the call for<br />

tenders and award <strong>of</strong> contracts <strong>of</strong> an anaerobic ferment<strong>at</strong>ion<br />

plant on Corfu/Greek for 90,000 t/a municipal waste, 5,000 t/a<br />

sewage sludge, 20,000 t/a <strong>of</strong> olive marc and other waste<br />

Design <strong>of</strong> a mechanical-biological waste tre<strong>at</strong>ment plant with a<br />

capacity <strong>of</strong> 17,000 t/a in Lavant/East Tyrol<br />

Compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions rel<strong>at</strong>ing to conveyor facilities,<br />

handling <strong>of</strong> the EU-wide call for tenders and award <strong>of</strong> contracts,<br />

supervision <strong>of</strong> construction and assistance till commencement <strong>of</strong><br />

oper<strong>at</strong>ions <strong>of</strong> a mechanical-biological residual waste tre<strong>at</strong>ment<br />

plant with a capacity <strong>of</strong> 154,000 t/a<br />

Compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions, handling <strong>of</strong> the call for tenders<br />

and award <strong>of</strong> contracts, project management and supervision <strong>of</strong><br />

the construction <strong>of</strong> a mechanical biological residual waste<br />

tre<strong>at</strong>ment plant for 65,000 t/a<br />

Design work and approval planning according to the Waste<br />

Management Act, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions rel<strong>at</strong>ing to<br />

process engineering, handling <strong>of</strong> the EU-wide call for tenders<br />

and award <strong>of</strong> contracts, supervision <strong>of</strong> the construction <strong>of</strong> a<br />

mechanical-biological residual waste tre<strong>at</strong>ment plant for 25,000<br />

t/a and a bio waste composting plant for 6,000 t/a;<br />

In cooper<strong>at</strong>ion with Dr. Schippinger & Partner and Envicare<br />

Design work and approval planning according to the Waste<br />

Management Act for a mechanical-biological residual waste<br />

tre<strong>at</strong>ment plant with a capacity 154,000 t/a<br />

Pre-design for a mechanical-biological residual waste tre<strong>at</strong>ment<br />

plant for 25,000 t/a<br />

Pre-design <strong>of</strong> several methods concerning the mechanicalbiological<br />

tre<strong>at</strong>ment <strong>of</strong> residual waste<br />

Design work and handling <strong>of</strong> a licensing procedure pursuant to<br />

the Environmental Impact Assessment Act for a mechanicalbiological<br />

residual waste tre<strong>at</strong>ment plant with a capacity <strong>of</strong><br />

97,500 t/a<br />

Handling <strong>of</strong> the licensing procedure according to the Industrial<br />

Act for a mechanical-biological residual waste tre<strong>at</strong>ment plant<br />

for 97,500 t/a<br />

Pre-project for a mechanical-biological tre<strong>at</strong>ment plant for<br />

household waste, industrial waste and bulky waste with a<br />

capacity <strong>of</strong> 67,000 t/a<br />

35


1999<br />

1998<br />

1997<br />

1996<br />

1994<br />

1993<br />

1992<br />

36<br />

AVG Steirische<br />

Abfallverwertungs<br />

G.m.b.H.<br />

Graz/A<br />

Gemeindebetriebe<br />

Frohnleiten<br />

Frohnleiten/A<br />

Koronis - Envitec S.A. für<br />

die Region Attika/GR<br />

RSVG Restst<strong>of</strong>fvertriebs<br />

GmbH<br />

Ohlsdorf/A<br />

Zellinger GmbH<br />

Walding/A<br />

GEMES GmbH<br />

Unterwellenborn/GER<br />

AEVG Abfall-Entsorgungs-<br />

u. Verarbeitungs<br />

Ges.m.b.H<br />

Graz/A<br />

GEMES GmbH<br />

Schöngleina/GER<br />

Stadt Chemnitz<br />

Chemnitz/GER<br />

GEMES GmbH<br />

Schöngleina/GER<br />

ISEO Restmüll GmbH<br />

Bretten/GER<br />

AWV Schladming<br />

Schladming/A<br />

GWV Gesellschaft<br />

für Wertst<strong>of</strong>fverwertung<br />

mbH<br />

Remseck/GER<br />

Bezirksabfallverband<br />

Freistadt/A<br />

Gerosan GmbH<br />

Ludwigsburg/GER<br />

Pre-engineering for a biological residual waste tre<strong>at</strong>ment plant<br />

for 36,000 t/a<br />

Pre-design <strong>of</strong> a mechanical-biological tre<strong>at</strong>ment plant for 40,000<br />

t/a<br />

RDF tre<strong>at</strong>ment and composting <strong>of</strong> the heavy fraction for the<br />

residual-waste splitting plant (1,200 t/day) for the region <strong>of</strong><br />

Attika (Athens);<br />

basic and detailed design work<br />

Design work and assistance in the award <strong>of</strong> contracts for an<br />

exhaust air registr<strong>at</strong>ion and tre<strong>at</strong>ment system in a composting<br />

plant<br />

Pre-design <strong>of</strong> a mechanical-biological residual waste tre<strong>at</strong>ment<br />

plant<br />

Pre-design, detail engineering, tendering, management until<br />

commencement <strong>of</strong> oper<strong>at</strong>ions on a composting plant for<br />

80,000 t/a<br />

Install<strong>at</strong>ion <strong>of</strong> a bio-waste tre<strong>at</strong>ment unit in an existing plant<br />

Design <strong>of</strong> a yard trimmings crushing plant<br />

Expansion <strong>of</strong> the delivery position for priv<strong>at</strong>e cars<br />

Detail engineering, tendering, management until<br />

commencement <strong>of</strong> oper<strong>at</strong>ions on a composting plant for 60,000<br />

t/a<br />

Basic research, preliminary and draft planning <strong>of</strong> a mechanicbiological<br />

plant <strong>at</strong> the Weißer Weg landfill for 80,000 t/a<br />

Engineering <strong>of</strong> a composting plant (tre<strong>at</strong>ment and intensive -<br />

rott) using the Rott - filter process<br />

Engineering <strong>of</strong> a conditioning and rotting facility (35,000 t/a)<br />

using the „RESIDUAL WASTE - SPLITTING - METHOD“<br />

Engineering and supervision <strong>of</strong> the expansion <strong>of</strong> a waste-sludgecomposting<br />

plant<br />

Engineering <strong>of</strong> the enlargement <strong>of</strong> a biowaste-composting plant<br />

using the rott-filter-process in Korntal-Münchingen ,district <strong>of</strong><br />

Ludwigsburg (performance: up to 6,500 t/a)<br />

jointly with AWIPLAN<br />

Engineering <strong>of</strong> a residual waste tre<strong>at</strong>ment and rotting facility<br />

(7,000 t/a) for the district <strong>of</strong> Freistadt/Upper Austria<br />

jointly with Ziv.Ing. J.Ringh<strong>of</strong>er<br />

Engineering <strong>of</strong> a mobile bio - waste composting plant using the<br />

Rott - filter process


1991<br />

1990<br />

1989<br />

Saubermacher<br />

Dienstleistungs GmbH<br />

Graz/A<br />

Stadtwerke Fürstenfeld<br />

Ges.m.b.H./A<br />

GWV Gesellschaft für<br />

Wertst<strong>of</strong>f-<br />

verwertung mbH<br />

Remseck/GER<br />

Müllex Umwelt- und<br />

Säuberungs<br />

Ges.m.b.H.+Co KG<br />

Markt Hartmannsdorf/A<br />

GWV Gesellschaft<br />

für Wertst<strong>of</strong>f-verwertung<br />

mbH<br />

Remseck/GER<br />

Abfallverband Kaiserwinkl<br />

Kössen/A<br />

Saubermacher<br />

Dienstleistungs GmbH<br />

Graz/A<br />

Schauerhuber Ges.m.b.H.<br />

Absdorf/A<br />

Austria Systemmüll<br />

Gesellschaft m.b.H.<br />

Wien/A<br />

City <strong>of</strong> Guelph/CAN<br />

Abfallwirtschaftsverband<br />

Schladming/A<br />

Toifelhart Ges.m.b.H.<br />

Wien/A<br />

Engineering <strong>of</strong> a composting plant using the Rott-filter process<br />

for 1,200 t/a bio waste in Lannach/Styria<br />

Engineering <strong>of</strong> a composting plant (4,000 t/a) for bio waste<br />

using the Rott - filter process in Voitsberg<br />

Engineering <strong>of</strong> a bio-waste composting facility (1,100 t/a) using<br />

the rott-filter process <strong>at</strong> Fürstenfeld/Styria<br />

Engineering <strong>of</strong> a bio-waste composting plant (4,000 t/a) using<br />

the rott-filter process <strong>at</strong> Korntal-Münchingen<br />

Engineering <strong>of</strong> a bio-waste composting plant (1,500 t/a) using<br />

the rott-filter process <strong>at</strong> Markt Hartmannsdorf/Styria<br />

Engineering <strong>of</strong> a composting plant for the rural district <strong>of</strong><br />

Ludwigsburg (6,000 t/a) in Marbach<br />

Engineering <strong>of</strong> a composting plant unsing the Rott-Filter-Process<br />

for 800 Mg/a <strong>of</strong> biological waste<br />

Engineering <strong>of</strong> a composting plant (4,000 t/a) using the Rott -<br />

Filter Process for bio - waste <strong>at</strong> Lannach/Steyr<br />

Engineering <strong>of</strong> a mobile composting plant using the Rott - Filter<br />

Process for biological waste<br />

Design work for a standard dry waste processing plant and a<br />

composting plant for organic waste<br />

Design <strong>of</strong> a dry waste sorting plant and a composting plant for<br />

BIO-BIN m<strong>at</strong>erial (100,000 t/a)<br />

In cooper<strong>at</strong>ion with R.Cave & Ass. Ltd.<br />

Engineering <strong>of</strong> an intensive-rott plant using the Rott-Filter-<br />

Process for the processing <strong>of</strong> raw compost from residential<br />

waste and sewage sludge<br />

Engineering <strong>of</strong> a compost plant refuse from cemeteries and<br />

biological waste from separ<strong>at</strong>e collections (50,000 t/a)<br />

37


Landfills and waste storages<br />

2011<br />

2010<br />

2009<br />

2008<br />

2007<br />

38<br />

ARGE<br />

Bauschuttauffüllung und<br />

Wiederverwertung<br />

Villach/A<br />

Remondis<br />

Wien/A<br />

WSA Waste Service GmbH<br />

Hartberg/A<br />

KAB Kärntner<br />

Abfallbewirtschaftung<br />

GmbH<br />

Klagenfurt/A<br />

Mayr-Melnh<strong>of</strong> Karton<br />

Ges.m.b.H.<br />

Hirschwang/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Tr<strong>of</strong>aiach/A<br />

ARGE<br />

Bauschuttauffüllung und<br />

Wiederverwertung<br />

Villach/A<br />

Remondis Austria GmbH<br />

Wien/A<br />

WSA Waste Service GmbH<br />

Hartberg/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

Trans-Beton Lieferbeton<br />

GesmbH<br />

Bruck an der Mur/A<br />

Abfallwirtschaftsverband<br />

Lavanttal<br />

Lavamünd/A<br />

Monitoring <strong>of</strong> a landfill containing construction waste according<br />

to the decision <strong>of</strong> the provincial government in Carinthia (in<br />

progress since 1993)<br />

Approval planning according to the Austrian Waste Management<br />

Act for the expansion <strong>of</strong> a storage facility for hazardous wastes<br />

Approval planning according to the Austrian Waste Management<br />

Act for the reloc<strong>at</strong>ion and the extansion <strong>of</strong> an intermedi<strong>at</strong>e<br />

storage <strong>of</strong> hazardous wastes with a capacity <strong>of</strong> 16,000 t/a in<br />

Hartberg.<br />

Approval planning according to the Austrian Waste Management<br />

Act for refilling <strong>of</strong> a loam pit with capacity <strong>of</strong> 103,000 m³<br />

Approval planning according to the Austrian Waste Management<br />

Act for several upgrades <strong>of</strong> a intermedi<strong>at</strong>e storage <strong>of</strong> hazardous<br />

wastes, capacity 5,000 t/a<br />

Technical concept <strong>of</strong> adaption to the st<strong>at</strong>e <strong>of</strong> the art <strong>of</strong> the<br />

company landfill for residual m<strong>at</strong>erials<br />

Assistance in accomplishing the authorities requirements for an<br />

intermedi<strong>at</strong>e storage <strong>of</strong> hazardous wastes<br />

Supervision <strong>of</strong> a landfill with construction waste according to the<br />

decision <strong>of</strong> the provincial government in Carinthia (since 1993)<br />

Pre-design and draft planning for the integr<strong>at</strong>ion <strong>of</strong> an<br />

intermedi<strong>at</strong>e storage <strong>of</strong> hazardous wastes in an existing plant,<br />

storage capacity 272 t<br />

Approval planning according to the Austrian Waste Management<br />

Act for an intermedi<strong>at</strong>e storage and physical tre<strong>at</strong>ment <strong>of</strong><br />

hazardous waste, capacity 16,000 t/a<br />

Approval planning for the construction <strong>of</strong> an intermedi<strong>at</strong>e<br />

storage <strong>of</strong> high caloric value wastes in Voggau, capacity 5,000 t<br />

Approval planning for the construction <strong>of</strong> an intermedi<strong>at</strong>e<br />

storage <strong>of</strong> high caloric value wastes in Kapfenberg, capacity<br />

5,000 t<br />

Approval planning for the construction <strong>of</strong> an intermedi<strong>at</strong>e<br />

storage <strong>of</strong> high caloric value wastes in Feldbach, capacity 8,000 t<br />

Feasibility study for possibilities concerning the extension <strong>of</strong> the<br />

landfill Hart, approval planning according to the Waste<br />

Management Act<br />

Design <strong>of</strong> a recyclable m<strong>at</strong>erial collection center


2006<br />

2004<br />

2002<br />

2001<br />

2000<br />

1999<br />

1998<br />

KAB Kärntner<br />

Abfallbewirtschaftung<br />

GmbH,<br />

Klagenfurt/A<br />

SAB Salzburger<br />

Abfallbeseitigung GmbH<br />

Bergheim/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

Georg K<strong>at</strong>zlberger<br />

GesmbH & Co KG<br />

Mettmach/A<br />

Deponie Fellach<br />

Villach/A<br />

O.W.R.C.<br />

Teheran/Iran<br />

Studio Tedesi – Deponie<br />

Piemont<br />

Maleo/I<br />

Tyrolux Recycling<br />

GesmbH<br />

Enns/Brunn a. Gebirge/A<br />

Schlager GmbH<br />

Graz/A<br />

Afvalzorg Deponie BV<br />

Haarlem/NL<br />

Abfallwirtschafstverband<br />

Wolfsberg<br />

Wolfsberg/A<br />

Abfallwirtschaftsverband<br />

Chemnitz/GER<br />

Abfallwirtschaftsverband<br />

Chemnitz/D<br />

ARGE<br />

Bauschuttauffüllung und<br />

Wiederwertung Villach/A<br />

Approval procedure for temporary storage facilities for hazardous<br />

waste with a capacity <strong>of</strong> 5,000 t/a<br />

Approval planning and handling <strong>of</strong> the administr<strong>at</strong>ive procedure<br />

for a mass waste landfill in order to adapt the existing landfill to<br />

the requirements <strong>of</strong> the new Landfill Act<br />

Approval planning and handling <strong>of</strong> the administr<strong>at</strong>ive procedure<br />

for the construction <strong>of</strong> an intermedi<strong>at</strong>e storage facility with a<br />

storage capacity <strong>of</strong> 8,000 t/a<br />

Approval planning for a storage facility for hazardous waste and<br />

its physical tre<strong>at</strong>ment, capacity <strong>of</strong> 5,000 t/a<br />

Technical expert study on landfilled waste according to ALSAGstandards<br />

Consulting work and engineering for the retr<strong>of</strong>itting <strong>of</strong> the<br />

Kahrizak landfill<br />

Consulting work and concept for the sanit<strong>at</strong>ion <strong>of</strong> a landfill for<br />

domestic and commercial waste<br />

Approval planning according to the Waste Management Act for<br />

an IPPC-conform tre<strong>at</strong>ment plant with intermedi<strong>at</strong>e storage for<br />

fluorescent lamps with a capacity <strong>of</strong> 1,000 t/a<br />

Approval planning and handling <strong>of</strong> the administr<strong>at</strong>ive procedure<br />

according to the Waste Management Act for a dump for<br />

construction site rubble with a capacity <strong>of</strong> 185,000 m³<br />

Concept, design, supervision and start-up <strong>of</strong> a landfill<br />

reclam<strong>at</strong>ion project by means <strong>of</strong> an aerobis<strong>at</strong>ion <strong>of</strong> the waste<br />

layers and emission control<br />

Final report on landfill stabiliz<strong>at</strong>ion (reloc<strong>at</strong>ion <strong>of</strong> the landfill <strong>at</strong><br />

the same site)<br />

Evalu<strong>at</strong>ion <strong>of</strong> an experiment on gas extraction and overall<br />

assessment <strong>of</strong> the landfill gas situ<strong>at</strong>ion on the landfill<br />

Markersdorf<br />

In cooper<strong>at</strong>ion with RUK<br />

Inspection <strong>of</strong> a degassing plant and <strong>of</strong> gauging instruments in<br />

the course <strong>of</strong> an experiment on gas extraction on the landfill<br />

Markersdorf<br />

In cooper<strong>at</strong>ion with RUK<br />

Safety concept for the registr<strong>at</strong>ion, collection and tre<strong>at</strong>ment <strong>of</strong><br />

landfill gas <strong>at</strong> the landfill site Falkenau<br />

In cooper<strong>at</strong>ion with RUK<br />

Concept and calcul<strong>at</strong>ion <strong>of</strong> economic efficiency to upd<strong>at</strong>e the<br />

landfill with the l<strong>at</strong>est st<strong>at</strong>e <strong>of</strong> the art<br />

39


1995<br />

1994<br />

1993<br />

1992<br />

40<br />

Abfallwirtschaftsverband<br />

Chemnitz/GER<br />

Landkreis<br />

Freiberg/Sachsen/GER<br />

Gerosan GmbH<br />

Ludwigsburg/GER<br />

AVL<br />

Abfallverwertungsges. d.<br />

LK Ludwigsburg mbH<br />

Bietigheim-Bissingen/GER<br />

Abfallwirtschaftsverband<br />

Schladming/A<br />

AVL<br />

Abfallverwertungsges. d.<br />

Landkreis Ludwigsburg<br />

Bietigheim-Bissingen/D<br />

Republic <strong>of</strong> Austria,<br />

Bezirkshauptmannschaft<br />

Wiener Neustadt/A<br />

AVL<br />

Abfallverwertungsges. d.<br />

LK Ludwigsburg mbH<br />

Bietigheim-Bissingen/GER<br />

Measurements to test an altern<strong>at</strong>ive method to degas a landfill<br />

(methane oxid<strong>at</strong>ion) <strong>at</strong> the Falkenau landfill<br />

jointly with Rettenberger Urban Kies (=RUK)<br />

Assignment <strong>of</strong> the position <strong>of</strong> the wells, drawing up <strong>of</strong> the test<br />

plan, evalu<strong>at</strong>ion <strong>of</strong> the degassing experiments and erection <strong>of</strong> a<br />

temporary covering <strong>of</strong> the Falkenau landfill jointly with RUK<br />

Flame ionis<strong>at</strong>ion detector inspection <strong>of</strong> the original substance <strong>at</strong><br />

the Himmelsfürst landfill<br />

jointly with RUK<br />

Execution <strong>of</strong> the project schedule, placing, supervision and<br />

project support for the construction <strong>of</strong> an active site digestion<br />

gas collection and landfill gas extraction <strong>of</strong> the landfill Falkenau<br />

together with RUK<br />

Reconversion <strong>of</strong> the sanitary landfill Muldenhütte<br />

Detail engineering <strong>of</strong> a tre<strong>at</strong>ment plant to reconverse the<br />

sanitary landfill Burgh<strong>of</strong><br />

Design <strong>of</strong> a soil mixing plant in Ludwigsburg/G<br />

Dynamic concept to fill up the Burgh<strong>of</strong> landfill<br />

Engineering <strong>of</strong> the enlargement <strong>of</strong> the landfill mining plant <strong>at</strong><br />

the Burgh<strong>of</strong> landfill<br />

Reconversion <strong>of</strong> the sanitary landfill Aich Assach/A<br />

Supervision <strong>of</strong> construction <strong>at</strong> the “Froschgraben” landfill for soil<br />

and demolition waste<br />

Concept on reclam<strong>at</strong>ion <strong>of</strong> “Berger” landfill site <strong>at</strong> Weikersdorf;<br />

In cooper<strong>at</strong>ion with Ziv.Ing. J.Ringh<strong>of</strong>er and<br />

Dr. Meyer<br />

Project: the implement<strong>at</strong>ion <strong>of</strong> a demonstr<strong>at</strong>ion project for site<br />

remedi<strong>at</strong>ion by excav<strong>at</strong>ion, sifting and sorting


Industrial facilities<br />

2011<br />

2010<br />

2008<br />

2007<br />

2006<br />

2005<br />

2003<br />

2002<br />

2000<br />

Wiener Hafen,<br />

GmbH&CoKG<br />

Wien/A<br />

ZUMA Beteiligungs GmbH<br />

& Co Abfallst<strong>of</strong>fverwertungs<br />

KG<br />

Wien/A<br />

Retter & Partner<br />

Krems/A<br />

ALUmelt GmbH<br />

Eisenerz/A<br />

OKV Kunstst<strong>of</strong>fverwertung<br />

GmbH<br />

Zwentendorf/A<br />

ZUMA Beteiligungs GmbH<br />

& Co Abfallst<strong>of</strong>fverwertungs<br />

KG<br />

Wien/A<br />

INKU AG<br />

Klosterneuburg/A<br />

Zuser Umweltservice<br />

GmbH<br />

Peggau/A<br />

Wiener Hafen<br />

GmbH&CoKG<br />

Vienna/A<br />

Peter Palecek<br />

Stockerau/A<br />

Schukra Berndorf GmbH<br />

Berndorf/A<br />

Parsons Brinckerh<strong>of</strong>f Ltd<br />

(London) / Reichhold<br />

Intern<strong>at</strong>ional<br />

Vienna/A<br />

K<strong>at</strong>zlberger GesmbH &<br />

Co KG<br />

Mettmach/A<br />

Quarzsand Ravensburg<br />

Ravensburg/D<br />

Pre-design and approval planning, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions,<br />

handling <strong>of</strong> the call for tenders and the procurement procedures<br />

for a conveyor- and storage system for salt with a capacity<br />

<strong>of</strong> 20,000 m 3 and a throughput capacity <strong>of</strong> 200 t/h<br />

Consulting services during the expansion <strong>of</strong> an existing site<br />

Conceptual design for the construction <strong>of</strong> a storage facility<br />

including the autom<strong>at</strong>ic loading and unloading onto/from ships,<br />

trains and trucks<br />

Approval planning for the construction <strong>of</strong> a remelting plant for<br />

secondary aluminium and associ<strong>at</strong>ed facilities with an overall<br />

capacity <strong>of</strong> 142,500 t/a<br />

Approval planning according to the Austrian Commercial Law for<br />

the construction <strong>of</strong> a storage hall and adaptions <strong>of</strong> an existing<br />

oper<strong>at</strong>ing plant<br />

Pre-design and approval planning according to the Austrian<br />

Commercial Act for taking-over and storage <strong>of</strong> wastes and<br />

demolition and construction m<strong>at</strong>erials, capacity 197,000 t/a<br />

Approval planning according to the Austrian Industrial Act for<br />

the install<strong>at</strong>ion <strong>of</strong> a storage container for combustible liquids<br />

Approval planning according to the Waste Management Act for<br />

the construction <strong>of</strong> wells for extinguishing w<strong>at</strong>er, a feeder track<br />

and a loc<strong>at</strong>ion for the oper<strong>at</strong>ional fire brigade<br />

Pre-design and approval planning, compil<strong>at</strong>ion <strong>of</strong> specific<strong>at</strong>ions,<br />

handling <strong>of</strong> the call for tenders, award <strong>of</strong> contracts and<br />

supervision <strong>of</strong> construction for a conveying and storage system<br />

for salt with a capacity <strong>of</strong> 200 t/h<br />

Approval procedure <strong>of</strong> a noise barrier<br />

Assessment <strong>of</strong> the current administr<strong>at</strong>ive situ<strong>at</strong>ion concerning<br />

licensing procedures, approval planning according to the<br />

Industrial Code and the building laws, optimiz<strong>at</strong>ion <strong>of</strong> the fire<br />

precaution plan for a plant loc<strong>at</strong>ion <strong>of</strong> the automotive industry<br />

Evalu<strong>at</strong>ion <strong>of</strong> the safety and eco-management and its<br />

implement<strong>at</strong>ion according to IPPC-standards<br />

Handling <strong>of</strong> the licensing procedure for the construction <strong>of</strong> a<br />

waste wood – fired plant with a nominal he<strong>at</strong> output <strong>of</strong> 850 KW<br />

including a flue gas cleaning system using additives<br />

Licensing procedure according to the mining law for quartz sand<br />

recovery; pilot survey and approval planning<br />

41


1999<br />

1998<br />

42<br />

W.Hamburger AG<br />

Pitten/A<br />

Franz Kirnbauer KG<br />

Gloggnitz/A<br />

Paul & Co GmbH<br />

Breitenau/A<br />

WCI - Woodward-Clyde<br />

Intern<strong>at</strong>ional<br />

London/GB<br />

Zuser Umwelttechnik<br />

GesmbH<br />

Peggau/A<br />

Stadtreinigung Dresden<br />

GmbH<br />

Dresden/GER<br />

P & N Kiesgewinnung<br />

GmbH<br />

Neudorf/A<br />

KommR<strong>at</strong> Heinz Schlager<br />

Graz/A<br />

Handling <strong>of</strong> the inspection according to §82 b <strong>of</strong> a paper mill<br />

Handling <strong>of</strong> the inspection according to § 82 b <strong>of</strong> a sawmill<br />

Handling <strong>of</strong> the inspection according to § 82 b <strong>of</strong> a paper mill<br />

Evalu<strong>at</strong>ion <strong>of</strong> the company’s environmental protection policy and<br />

safety in a company producing chemicals<br />

Rehabilit<strong>at</strong>ion concept pursuant to the Industrial Code for the<br />

adapt<strong>at</strong>ion <strong>of</strong> a plant loc<strong>at</strong>ion handling a capacity <strong>of</strong> 150,000 t/a<br />

Licensing procedure for a waste container washing plant and a<br />

washing facility fo rbiological waste collection vehicles<br />

Approval with regards <strong>of</strong> w<strong>at</strong>er laws for wet processing <strong>of</strong> gravel<br />

Prepar<strong>at</strong>ion <strong>of</strong> a utilis<strong>at</strong>ion concept for the revitaliz<strong>at</strong>ion <strong>of</strong> old<br />

industrial plants


Fire prevention and safety engineering<br />

Fire prevention<br />

2011<br />

2010<br />

2009<br />

2008<br />

Cleanaway Österreich<br />

GmbH<br />

Herzogenburg/A<br />

KAB Kärntner<br />

Abfallbewirtschaftung<br />

GmbH<br />

Klagenfurt/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Feldkirchen/A<br />

ThermoTeam<br />

Altern<strong>at</strong>ivbrennst<strong>of</strong>fverwertungs<br />

GmbH<br />

Retznei/A<br />

Gaugl Metallhandel<br />

GmbH<br />

Schönau/A<br />

ALUmelt GmbH<br />

Eisenerz/A<br />

Buchhauser GmbH<br />

Voitsberg/A<br />

WSA Waste Service GmbH<br />

Hartberg/A<br />

ZUMA Beteiligungs GmbH<br />

& Co Abfallst<strong>of</strong>fverwertungs<br />

KG<br />

Wien/A<br />

ThermoTeam<br />

Altern<strong>at</strong>ivbrennst<strong>of</strong>fverwertungs<br />

GmbH<br />

Retznei/A<br />

Gaugl Metallhandel<br />

GmbH<br />

Schönau/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Vienna/A<br />

Prepar<strong>at</strong>ion <strong>of</strong> a fire prevention concept and preliminary<br />

discussions with the appropri<strong>at</strong>e authorities for the permission<br />

<strong>of</strong> a storage depot<br />

Prepar<strong>at</strong>ion <strong>of</strong> a fire prevention concept in the course <strong>of</strong> the<br />

applic<strong>at</strong>ion process for the construction <strong>of</strong> a mechanical sorting<br />

plant for commercial and packaging wastes with a capacity <strong>of</strong><br />

34,500 t/a<br />

Inspection <strong>of</strong> all plants in Austria to identify further possibilities<br />

for an improvement <strong>of</strong> the existing fire prevention measures<br />

Assistance and construction supervision during the<br />

implement<strong>at</strong>ion <strong>of</strong> a spark fire extinguishing system <strong>at</strong> a waste<br />

tre<strong>at</strong>ment plant in Retznei<br />

Prepar<strong>at</strong>ion <strong>of</strong> a fire prevention concept in the course <strong>of</strong> the<br />

applic<strong>at</strong>ion process for the construction <strong>of</strong> a scrap recycling<br />

plant including associ<strong>at</strong>ed facilities, a scrap car disassembly<br />

plant and a reloading facility for mixed demolition and<br />

construction waste with an overall capacity <strong>of</strong> 35,000 t/a<br />

Prepar<strong>at</strong>ion <strong>of</strong> a fire prevention concept in the course <strong>of</strong> the<br />

applic<strong>at</strong>ion process for the construction <strong>of</strong> a remelting plant for<br />

secondary aluminium with additional facilities and an overall<br />

capacity <strong>of</strong> 142,500 t/a<br />

Prepar<strong>at</strong>ion <strong>of</strong> a fire prevention concept for a waste tre<strong>at</strong>ment<br />

centre, consisting <strong>of</strong> a reloading facility, intermedi<strong>at</strong>e storage<br />

area and a mechanical waste sorting plant, capacity <strong>of</strong><br />

35,000 t/a<br />

Prepar<strong>at</strong>ion <strong>of</strong> fire prevention concepts for removal and<br />

extension <strong>of</strong> intermedi<strong>at</strong>e storage for hazardous waste with a<br />

capacity <strong>of</strong> 16,000 t/a<br />

Prepar<strong>at</strong>ion <strong>of</strong> a fire prevention concept in the course <strong>of</strong> the<br />

applic<strong>at</strong>ion process for a storage facility for wastes and<br />

construction m<strong>at</strong>erials and a capacity <strong>of</strong> 197,000 t/a<br />

Support during the set-up <strong>of</strong> emergency oper<strong>at</strong>ions as well as a<br />

reconstruction <strong>of</strong> plant components after a fire damage<br />

Prepar<strong>at</strong>ion <strong>of</strong> a fire prevenetion concept for the erection <strong>of</strong> a<br />

scrap recycling plant with associ<strong>at</strong>ed facilities, an old car<br />

disassembly plant and a reloading facility for mixed demolition<br />

and construction waste, with an overall capacity <strong>of</strong> 35,000 t/a<br />

Revision <strong>of</strong> a fire prevention concept and extinguishing w<strong>at</strong>er<br />

calcul<strong>at</strong>ion for a waste tre<strong>at</strong>ment plant<br />

43


2007<br />

2006<br />

2005<br />

2004<br />

44<br />

ZEMKA Ges.m.b.H.<br />

Zell am See/A<br />

Gemeindebetriebe<br />

Frohnleiten<br />

Frohnleiten/A<br />

Japan Motors<br />

Gallbrunn/A<br />

Wiener Hafen<br />

GmbH&CoKG<br />

Wien/A<br />

Recycling und Transport<br />

GmbH<br />

Thersienfeld/A<br />

KAB Kärntner<br />

Abfallbewirtschaftung<br />

GmbH<br />

Klagenfurt/A<br />

ecorec Slovensko s.r.o.<br />

Pezinok/SK<br />

ecorec Česko s.r.o.<br />

Tremosnice/CZ<br />

Zuser Umweltservice<br />

GmbH<br />

Peggau/A<br />

W&P Wietersdorfer und<br />

Peggauer GmbH & Co KG<br />

Wietersdorf/A<br />

Müllex Umwelt<br />

Säuberung GmbH<br />

St. Margarethen an der<br />

Raab/A<br />

Maierh<strong>of</strong>er<br />

Wiener Neustadt/A<br />

Topspeed<br />

Wiener Neustadt/A<br />

KAB Kärntner<br />

Abfallbewirtschaftung<br />

GmbH<br />

Klagenfurt/A<br />

Schweigl K. Handels-AG<br />

Neunkirchen/A<br />

Prepar<strong>at</strong>ion <strong>of</strong> a fire prevention concept in the course <strong>of</strong> the<br />

applic<strong>at</strong>ion process for the waste tre<strong>at</strong>ment plant ZEMKA<br />

Calcul<strong>at</strong>ion <strong>of</strong> the needed extinguishing w<strong>at</strong>er and compil<strong>at</strong>ion<br />

<strong>of</strong> a fire precaution concept for the waste tre<strong>at</strong>ment and disposal<br />

center in Frohnleiten<br />

Fire prevention concept <strong>of</strong> a hangar <strong>at</strong> the airport Wr. Neustadt<br />

Conception, call for tenders, handling <strong>of</strong> the procurement<br />

procedure, supervision <strong>of</strong> the construction <strong>of</strong> the escape route<br />

lighting <strong>of</strong> several storage halls<br />

Fire prevention concept and consulting work for the<br />

implement<strong>at</strong>ion <strong>of</strong> health and safety measures<br />

Fire prevention concept for an entire waste management<br />

oper<strong>at</strong>ing site<br />

Fire prevention concept for temporary storage facilities for<br />

hazardous waste<br />

Fire prevention concept for an existing SRF-tre<strong>at</strong>ment plant<br />

Fire prevention concept for an existing SRF-tre<strong>at</strong>ment plant<br />

Fire prevention concept for an entire waste management<br />

oper<strong>at</strong>ing site with a dimension <strong>of</strong> appr. 2 ha<br />

Fire prevention concept taking into consider<strong>at</strong>ion the planned<br />

extending <strong>of</strong> a SRF-tre<strong>at</strong>ment site using the existing plants and<br />

organiz<strong>at</strong>ions, coordin<strong>at</strong>ion with the authorities, handling <strong>of</strong> the<br />

call for tenders <strong>of</strong> realiz<strong>at</strong>ion <strong>of</strong> the technical equipment<br />

Fire prevention concept for an entire waste management<br />

oper<strong>at</strong>ing site<br />

Fire prevention concept for a hangar as well as the <strong>of</strong>fice and<br />

outside buildings<br />

Fire prevention concept for a hangar as well as the <strong>of</strong>fice and<br />

outside buildings<br />

Fire prevention concept for a waste tre<strong>at</strong>ment plant incl. the<br />

<strong>of</strong>fice and outside buildings<br />

Fire prevention concept, detailed design work, handling <strong>of</strong> the<br />

call for tenders and supervision <strong>of</strong> the implement<strong>at</strong>ion <strong>of</strong> several<br />

fire protection facilities


2003<br />

2001<br />

1999<br />

1998<br />

1996<br />

1994<br />

Schukra Berndorf GmbH<br />

Berndorf/A<br />

Thermo Team GmbH<br />

Retznei/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

Hamburger AG<br />

Pitten/A<br />

Hamburger AG<br />

Pitten/A<br />

Schweigl K. - HandelsAG<br />

Neunkirchen/A<br />

RVL Restst<strong>of</strong>fverwertung<br />

Lenzing GmbH<br />

Lenzing/A<br />

ISEO Restmüll GmbH<br />

Bretten/D<br />

Trans-Beton GesmbH<br />

Bruck an der Mur/A<br />

Ost-Styria Recycling<br />

Gleisdorf/A<br />

ARW Altst<strong>of</strong>frecycling<br />

Wien GmbH<br />

Wien/A<br />

Baufeld Austria GmbH<br />

Wien/A<br />

Schlager Ges.m.b.H.<br />

Graz/A<br />

Welser Abfallverwertung<br />

Ges.m.b.H<br />

Wels/A<br />

Prepar<strong>at</strong>ion <strong>of</strong> a fire prevention concept taking into<br />

consider<strong>at</strong>ion the planned expansion <strong>of</strong> the plant<br />

Risk assessment after a fire in the waste air system, definition <strong>of</strong><br />

the dangerous areas, negoti<strong>at</strong>ions with the licensing authorities<br />

and handling <strong>of</strong> the call for tenders and the purchase <strong>of</strong> the<br />

necessary fire protection equipment<br />

Risk analysis <strong>of</strong> the storage <strong>of</strong> secondary resources from plastic<br />

m<strong>at</strong>erial <strong>at</strong> an existing loc<strong>at</strong>ion as well as a present<strong>at</strong>ion <strong>of</strong> the<br />

adverse environmental effects in the case <strong>of</strong> fire<br />

Implement<strong>at</strong>ion <strong>of</strong> the fire prevention measures required in a<br />

paper mill<br />

Construction <strong>of</strong> a light foam fire extinguishing system in a<br />

storage facility for 15,000 t <strong>of</strong> paper; negoti<strong>at</strong>ions with the<br />

public authorities, handling <strong>of</strong> the call for tenders and the award<br />

<strong>of</strong> contracts, supervision <strong>of</strong> the construction, assistance during<br />

the commencement <strong>of</strong> oper<strong>at</strong>ions and acceptance test<br />

Fire prevention concept (taking into account the current st<strong>at</strong>e <strong>of</strong><br />

affairs) and action plan<br />

Fire prevention concept<br />

Risk assessment pursuant to the Food Hygiene Act<br />

Design <strong>of</strong> the fire prevention system for a fuel processing plant<br />

and a fluidized bed-boiler (100 MW) for the light fraction<br />

Fire protection master plan, safety analysis and master plan<br />

according to interference law for a residual waste tre<strong>at</strong>ment and<br />

rotting plant using the residual waste - splitting method<br />

Fire protection master plan for a mixed waste facility<br />

Evalu<strong>at</strong>ion <strong>of</strong> the existing fire protection; fire protection master<br />

plan<br />

Fire protection master plans, safety analyses, master plans<br />

according to interference law<br />

Fire protection master plans, safety analyses, master plans<br />

according to interference law<br />

Fire protection master plans, safety analyses, master plans<br />

according to interference law<br />

Fire protection master plans, safety analyses, master plans<br />

according to interference law<br />

45


Explosion protection<br />

2011<br />

2010<br />

2009<br />

46<br />

Saubermacher<br />

Dienstleistungs AG<br />

Unterpremstätten/A<br />

KAB Kärntner<br />

Abfallbewirtschaftung<br />

GmbH<br />

Klagenfurt/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

Saubermacher Slovenija<br />

Lenart/SLO<br />

Gaugl Metallhandel<br />

GmbH<br />

Schönau/A<br />

ALUmelt GmbH<br />

Eisenerz/A<br />

Wopfinger<br />

Baust<strong>of</strong>findustrie GmbH<br />

Waldegg/A<br />

Lafarge Perlmooser AG<br />

Mannersdorf/A<br />

W.Hamburger GmbH<br />

Pitten/A<br />

ZUMA Beteiligungs GmbH<br />

& Co Abfallst<strong>of</strong>fverwertungs<br />

KG<br />

Wien/A<br />

WSA Waste Service GmbH<br />

Hartberg/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Unterpremstätten/A<br />

Komex<br />

Abfallentsorgungsgesellschaft<br />

m.b.H.<br />

Voitsberg/A<br />

Support during the authoris<strong>at</strong>ion, call for tenders, order and<br />

implement<strong>at</strong>ion <strong>of</strong> explosion protection measures<br />

Prepar<strong>at</strong>ion <strong>of</strong> an explosion protection document for the<br />

construction <strong>of</strong> a mechanical sorting plant for commercial and<br />

packaging wastes with a capacity <strong>of</strong> 34,500 t/a<br />

Staff educ<strong>at</strong>ion in danger <strong>of</strong> electrost<strong>at</strong>ic discharge <strong>at</strong> 3 company<br />

sites<br />

Consulting work about the requirements <strong>of</strong> the explosion<br />

protection for an intermedi<strong>at</strong>e storage for hazardous waste<br />

Prepar<strong>at</strong>ion <strong>of</strong> an explosion prevention concept for the<br />

construction <strong>of</strong> a scrap recycling plant including associ<strong>at</strong>ed<br />

facilities, a scrap car disassembly plant and a reloading facility<br />

for mixed demolition and construction wastes with an overall<br />

capacity <strong>of</strong> 35,000 t/a<br />

Prepar<strong>at</strong>ion <strong>of</strong> an explosion prevention concept in the course <strong>of</strong><br />

the applic<strong>at</strong>ion process for the construction <strong>of</strong> a remelting plant<br />

for secondary aluminium with additional facilities and a capacity<br />

<strong>of</strong> 142,500 t/a<br />

Consulting work about the requirements <strong>of</strong> the explosion<br />

protection according to ATEX<br />

Explosion protection document according to the European<br />

Explosive Atmospheres Directive (ATEX) for an entire cement<br />

plant<br />

Implement<strong>at</strong>ions <strong>of</strong> measurements <strong>of</strong> gas to classify the<br />

explosion protection zones in a paper plant<br />

Revision <strong>of</strong> the explosion protection document for the paper mill<br />

in Pitten<br />

Prepar<strong>at</strong>ion <strong>of</strong> an explosion prevention concept in the course <strong>of</strong><br />

the applic<strong>at</strong>ion process for a storage facility for wastes and<br />

demolition and construction m<strong>at</strong>erials, with an overall capacity<br />

<strong>of</strong> 197,000 t/a<br />

Prepar<strong>at</strong>ion <strong>of</strong> an explosion prevention concept for the<br />

reloc<strong>at</strong>ion and expansion <strong>of</strong> an interim store for hazardous<br />

wastes with a capacity <strong>of</strong> 16.000 t/a<br />

Prepar<strong>at</strong>ion <strong>of</strong> an explosion prevention concept for a tre<strong>at</strong>ment<br />

plant for workshop wastes<br />

Explosion prevention document according to the European<br />

Explosive Atmospheres Directive (ATEX) for an oper<strong>at</strong>ing plant<br />

with reloading and storage several hazardous and nonhazardous<br />

wastes


2008<br />

2007<br />

WSA Waste Service GmbH<br />

Hartberg/A<br />

Lafarge Perlmooser AG<br />

Mannersdorf/A<br />

ZEMKA Ges.m.b.H.<br />

Zell am See/A<br />

Semperit Technische<br />

Produkte GmbH<br />

Wimpassing/A<br />

Zuser Umweltservice<br />

GmbH<br />

Peggau/A<br />

Saubermacher<br />

Dienstleistungs AG<br />

Graz/A<br />

Mürztaler Saubermacher<br />

GmbH<br />

Kapfenberg/A<br />

Die Hartberger<br />

Saubermacher GesmbH<br />

Hartberg/A<br />

Saubermacher<br />

Outsourcing GmbH<br />

Graz/A<br />

Entsorgungsservice<br />

GesmbH<br />

Krems/A<br />

Abfallwirtschaftsverband<br />

Liezen<br />

Liezen/A<br />

Altst<strong>of</strong>fsammelzentrum<br />

Eisenerz<br />

Eisenerz/A<br />

ABG Abfallbeteiligungs<br />

GmbH & Co KG<br />

Eisenerz/A<br />

Explosion protection document according to the European<br />

Explosive Atmospheres Directive (ATEX) for tre<strong>at</strong>ment and<br />

storage <strong>of</strong> hazardous wastes, capacity 16,000 t/a<br />

Explosion protection document according to the European<br />

Explosive Atmospheres Directive (ATEX) for the tre<strong>at</strong>ment plant<br />

<strong>of</strong> solid recovered fuels (SRF)<br />

Prepar<strong>at</strong>ion <strong>of</strong> an explosion prevention concept in the course <strong>of</strong><br />

the applic<strong>at</strong>ion process for the waste tre<strong>at</strong>ment plant ZEMKA<br />

Explosion protection document according to the European<br />

Explosive Atmospheres Directive (ATEX) for the department <strong>of</strong><br />

production <strong>of</strong> escal<strong>at</strong>or handrails<br />

Explosion protection document according to the European<br />

Atmospheres Directive (ATEX) for the waste tre<strong>at</strong>ment plant in<br />

Peggau, capacity 159,000 t/a<br />

Explosion protection document for the cleaning work <strong>of</strong> a tank<br />

and a oil seper<strong>at</strong>or with cleaning vehicle according to the<br />

European Explosive Atmospheres Directive (ATEX)<br />

Explosion protection document according to the European<br />

Explosive Atmospheres Directive (ATEX) for the waste tre<strong>at</strong>ment<br />

plants<br />

- Wien, Oberlaaer Straße (sorting plant, storage <strong>of</strong><br />

hazardous waste)<br />

- Graz, Puchstraße (sorting plant)<br />

- Graz, Conrad-von-Hötzendorfstraße (storage and<br />

tre<strong>at</strong>ment plant <strong>of</strong> hazardous waste)<br />

- Feldbach (reloading st<strong>at</strong>ion)<br />

- Tr<strong>of</strong>aiach (storage <strong>of</strong> hazardous waste)<br />

Explosion protection document for a unloading st<strong>at</strong>ion for<br />

wastes in Kapfenberg according to the European Explosive<br />

Atmospheres Directive (ATEX)<br />

Explosion protection document for a unloading st<strong>at</strong>ion for<br />

wastes in Hartberg according to the European Explosive<br />

Atmospheres Directive (ATEX)<br />

Consulting for the realiz<strong>at</strong>ion <strong>of</strong> measures for explosion safety<br />

Explosion protection document for a storage and tre<strong>at</strong>ment<br />

plant <strong>of</strong> hazardous waste according to the European Explosive<br />

Atmospheres Directive (ATEX)<br />

Evalu<strong>at</strong>ion <strong>of</strong> an oper<strong>at</strong>ing plant (incl. a mechanical biological<br />

waste tre<strong>at</strong>ment plant, a composting plant and a landfill)<br />

according to the European Explosive Atmosheres Directive<br />

(ATEX)<br />

Evalu<strong>at</strong>ion <strong>of</strong> a recyclable and hazardous waste collection center<br />

according to the European Explosive Atmospheres Directive<br />

(ATEX)<br />

Evalu<strong>at</strong>ion <strong>of</strong> the recycling park Eisenerz according to the<br />

European Explosive Atmospheres Directive (ATEX)<br />

47


2006<br />

48<br />

RSVG GmbH Nfg. & Co<br />

KG, RMVG GmbH Nfg. &<br />

Co KG<br />

Eisenerz/A<br />

ZEMKA GesmbH<br />

Zell am See/A<br />

Rexam Beverage Can<br />

Enzesfeld GmbH<br />

Enzersfeld/A<br />

W. Hamburger GesmbH<br />

Pitten/A<br />

Müllex<br />

Umweltsäuberungs GmbH<br />

St. Margarethen an der<br />

Raab/A<br />

Trans-Beton Lieferbeton<br />

GesmbH<br />

Bruck an der Mur/A<br />

INKU AG<br />

Klosterneuburg/A<br />

Ing. Rudolf Rottner GmbH<br />

Fischamend/A<br />

j:\ig-allg\ig-honref\referenz<strong>list</strong>e\2011-09-14 e_referenz<strong>list</strong>e.docx<br />

Evalu<strong>at</strong>ion <strong>of</strong> an oper<strong>at</strong>ing plant (incl. solidific<strong>at</strong>ion <strong>of</strong> wastes<br />

and a landfill) according to the European Explosive Atmospheres<br />

Directive (ATEX)<br />

Evalu<strong>at</strong>ion <strong>of</strong> an oper<strong>at</strong>ing plant (incl. a mechanical biological<br />

waste tretment plant, hazardous waste delivery area and a<br />

landfill) according to the European Explosive Atmospheres<br />

Directive (ATEX)<br />

Explosion protection document for a manufacturing-plant <strong>of</strong><br />

beverage cans according to the European Explosive Atmospheres<br />

Directive (ATEX)<br />

Explosion protection document for a paper manufacturing-plant<br />

(incl. a electricity centre and a sewage clarific<strong>at</strong>ion plant)<br />

according to the European Explosive Atmospheres Directive<br />

(ATEX)<br />

Explosion protection document for a waste tre<strong>at</strong>ment plant (incl.<br />

a sorting plant and a tre<strong>at</strong>ment plant for solid recovered fuels –<br />

SRF) according to the European Explosive Atmospheres Directive<br />

(ATEX)<br />

Explosion protection document for a waste tre<strong>at</strong>ment plant (incl.<br />

a sorting plant and a tre<strong>at</strong>ment plant for solid recovered fuels –<br />

SRF) according to the European Explosive Atmospheres Directive<br />

(ATEX)<br />

Explosion protection document for a commercial undertaking<br />

according to the European Explosive Atmospheres Directive<br />

(ATEX)<br />

Explosion protection document for a waste sorting plant<br />

according to the European Explosive Atmospheres Directive<br />

(ATEX)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!