Portfolio
PORTFOLIORIBA PART IIPEDRO TELLO
- Page 2: 01New dwellinghousedevelopmentLocat
- Page 7 and 8: Lift overrun Level18755E3E2E1LIFT O
- Page 9: 03Change of Use: FromCommercial to
- Page 15 and 16: 05House Extensionand RefurbishmentL
- Page 17 and 18: ROOF+10022ROOF+100222323LOFT+635023
- Page 19 and 20: boilerboilerboilerboileroverhead ba
- Page 21 and 22: ROOFROOF2370LOFT107.85108.07109.461
PORTFOLIO
RIBA PART II
PEDRO TELLO
01
New dwellinghouse
development
Location:
Project Type:
RIBA Stages 0 to 3
Croydon,
London, UK
Professional
Collaborative
Softwares Used:
Drawing MicroStation
Modelling SketchUp
Visualization Photoshop
Design&Access Statement Indesign
The proposal is for the rejuvenation of the existing garage
spaces which have been left in a state of disrepair over
time. The proposal includes the development of two
semi-detached 3 bedroom/2 storey dwellings, car parking
spaces, communal bin storage and the re-surfacing the
existing access road (Right of way)
For this project I was responsible for the concept design,
elaboration of planning drawings and Design and Access
Statement and visuals. Upon complation of the Planning
application I am prepared for Detail design and the
preparation of technical drawings for Building Control
Application.
RIBA Stage 1/2
-Drawing the existing and proposed plans
RIBA Stage 3
-Creation of full set of drawings and documents for
submission to local authority
Proposed Elevations
CHANGE IN F
CHANGE IN F
4th Floor
14160
02
Location:
Project Type:
RIBA Stages 3 to 5
Softwares Used:
Drawing AutoCad
Mixed-use
Redevelopment
Ealing,
London, UK
Professional
Collaborative
SIDE 1 ELEVATION
Lift overrun Level
18755
Roof Level
17160
4th Floor
14160
3rd Floor
11160
6a
Roof Level
17160
4th Floor
14160
6b
6c
RESIDENTIAL
REFUSE STORAGE
6d
C D 7
A1 B2 B1 C1 D1 E1 F1 G1 H1 J1 K1 L1 M1
LIFT OVERRUN
LIFT OVERRUN
LIFT
7a
STAIRCASE
8 9
3rd Floor
2nd Floor
1st Floor
9a 10 11 12 13 14 15
11160
8160
5160
Beaconsfield Road
2nd Floor
8160
3rd Floor
11160
1st Floor
5160
2nd Floor
8160
This is a residential led mixed-use redevelopment of an
existing Post office consisting of 1 - 5 storey building to
provide 41 residential units on the first, second, third
and fourth floors; and 10 retail units on the ground floor;
provision of car and cycle parking, and raised amenity
space and refuse storage.
Beaconsfield Road
1st Floor
5160
FRONT ELEVATION (SOUTH ROAD)
96 SIDE SOUTH ROAD, 2 SOUTHALL, ELEVATION
UB1 1RT
1a 1 2 3 4 5 6 6a 6b 6c 15 6d
Access Road
PROJECT DWG NO. SCALE DETAIL
07.03.2023
24.03.2023
PROJECT NO.
DETAILS FOR
SENT TO BC
DISCUSSION
CONSTRUCTION DRAWINGS
526
1:100
@ A1
ELEVATIONS WITH GRID
LINES
04.04.2023
SENT TO
ASH&LACY
10.03.2023
DETAILS FOR
DISCUSSION
13.03.2023
ISSUED FOR
DISCUSSION
16.03.2023
ISSUED FOR
DISCUSSION
23.03.2023
ISSUED FOR
DISCUSSION
29.03.2023
ISSUED FOR
DISCUSSION
19.32
0m
5m
10m
P R A r c h i t e c t u r e l t d.
C h a r t e r e d A r c h i t e c t
120, Pinner Road, Harrow, HA1 4JD.
Tel: 0208 357 2304
The team responsible for the development of the project
consisted of three people, my role and tasks in this team
were the following:
Lift overrun Level
18755
Roof Level
17160
4th Floor
14160
LIFT OVERRUN
RIBA Stage 3/4
-Revising plans, elevations and sections that require
modification based on the updated design information
-Coordinating proposed plans with structural plans
-Preparation of technical specifications and schedules
3rd Floor
11160
2nd Floor
8160
1st Floor
5160
RIBA Stage 5
-Calculating the different cladding materials for the
construction stage of the project.
Access Road
96 SOUTH ROAD, SOUTHALL, UB1 1RT
CONSTRUCTION DRAWINGS
ENTRY 4 ENTRY 3
FRONT ELEVATION (BEACONSFIELD ROAD)
PROJECT DWG NO. SCALE DETAIL
07.03.2023 10.03.2023 13.03.2023 16.03.2023 23.03.2023 24.03.2023 29.03.2023 PROJECT NO.
DETAILS FOR DETAILS FOR ISSUED FOR ISSUED FOR ISSUED FOR SENT TO BC ISSUED FOR
DISCUSSION DISCUSSION DISCUSSION DISCUSSION DISCUSSION
DISCUSSION
525
1:100
@ A1
ELEVATIONS WITH GRID
LINES
04.04.2023
SENT TO
ASH&LACY
19.32
0m
South Road
5m
10m
P R A r c h i t
Proposed
e c t u r e
Elevations
l t d.
C h a r t e r e d A r c h i t e c t
120, Pinner Road, Harrow, HA1 4JD.
Tel: 0208 357 2304
Lift overrun Level
18755
E3
E2
E1
LIFT OVERRUN
Equitone Cladding
Gross Area
Openings
Total Area:
186.99m2
63.69m2
123.30m2
-
Mechslip Cladding
Gross Area
Openings
Total Area:
306.57m2
91.6m2
214.97m2
-
INNER FACING
Cladding 3
Gross Area
Openings
Total Area:
92.14m2
34.60m2
57.54m2
-
Roof Level
17160
4th Floor
14160
3rd Floor
11160
2nd Floor
8160
1st Floor
5160
CHANGE IN
FACADE
DIRECTION
E1
CHANGE IN
FACADE
DIRECTION
CHANGE IN
FACADE
DIRECTION
PROPOSED FRONT ELEVATION
(South Road side)
4TH FLOOR EXTERNAL FLOOR
Equitone Cladding
Equitone Cladding
Gross Area
Openings
Total Area:
58.58m2
20.23m2
38.35m2
-
INNER FACING
4TH FLOOR EXTERNAL FLOOR
Gross Area
Openings
Total Area:
SUBTOTAL [515]
67.96m2
31.24m2
36.72m2
-
Mechslip Cladding
Gross Area
Openings
Total Area:
59.00m2
16.50m2
42.50m2
-
Cladding 3
Gross Area
Openings
Total Area:
32.02m2
10.98m2
21.04m2
Equitone Cladding
Equitone Cladding
- Gross Area 27.92m2 -
Mechslip Cladding
Openings 13.79m2
Total Area: 15.93m2
Cladding 3
214.30m2
257.47m2
78.58m2
0m
5m
10m
PROJECT DWG NO. SCALE DETAIL
A 25.11.2022 B 22.12.2022 C 17.01.2023 D 21.02.2023 E 23.02.2023 F 24.02.2023 G 01.03.2023 PROJECT NO.
DETAILS FOR WINDOWS SENT TO THE SENT TO THE ISSUED FOR ISSUED FOR ISSUED FOR
DISCUSSION AND DOORS CLIENT ENGINEER DISCUSSION DISCUSSION DISCUSSION
96 SOUTH ROAD, SOUTHALL, UB1 1RT
CONSTRUCTION DRAWINGS
515
1:100
@ A1
CLADDING AREAS
06.03.2023
DETAILS FOR
DISCUSSION
17.03.2023
DETAILS FOR
DISCUSSION
19.32
P R A r c h i t e c t u r e l t d.
C h a r t e r e d A r c h i t e c t
120, Pinner Road, Harrow, HA1 4JD.
Tel: 0208 357 2304
E8
Equitone Cladding
Mechslip Cladding
INNER FACING
Roof Level
17160
LIFT OVERRUN
Gross Area
Openings
Total Area:
108.09m2
31.86m2
76.23m2
- Gross Area 101.07m2 -
Cladding 3
Openings 16.59m2
Total Area: 84.48m2
Gross Area
Openings
Total Area:
60.98m2
22.02m2
38.96m2
-
4th Floor
14160
3rd Floor
11160
2nd Floor
8160
1st Floor
5160
4TH FLOOR EXTERNAL FLOOR
Equitone Cladding
PROPOSED SIDE ELEVATION
Gross Area
Openings
Total Area:
55.90m2 -
7.50m2
48.40m2
Roof Level
17160 Gross Area 90.63m2 - Gross Area
Openings 24.58m2 Openings
Total Area: 66.05m2 Total Area:
4th Floor
14160
3rd Floor
11160
2nd Floor
8160
1st Floor
5160
E8
Equitone Cladding
Mechslip Cladding
188.17m2
59.28m2
128.89m2
-
INNER FACING
Cladding 3
Gross Area
Openings
Total Area:
15.90m2
6.35m2
9.55m2
-
SUBTOTAL [519]
Equitone Cladding 190.68m2
Mechslip Cladding 213.37m2
Cladding 3
48.51m2
GRAND TOTAL
Equitone Cladding 752.81m2
Mechslip Cladding 985.22m2
Cladding 3
218.69m2
0m
5m
10m
PROJECT DWG NO. SCALE DETAIL
A 25.11.2022 B 22.12.2022 C 17.01.2023 D 21.02.2023 E 23.02.2023 F 24.02.2023 G 01.03.2023 PROJECT NO.
DETAILS FOR WINDOWS SENT TO THE SENT TO THE ISSUED FOR ISSUED FOR ISSUED FOR
DISCUSSION AND DOORS CLIENT ENGINEER DISCUSSION DISCUSSION DISCUSSION
96 SOUTH ROAD, SOUTHALL, UB1 1RT
CONSTRUCTION DRAWINGS
519
1:100
@ A1
CLADDING AREAS
06.03.2023
DETAILS FOR
DISCUSSION
17.03.2023
DETAILS FOR
DISCUSSION
19.32
P R A r c h i t e c t u r e l t d.
C h a r t e r e d A r c h i t e c t
120, Pinner Road, Harrow, HA1 4JD.
Tel: 0208 357 2304
03
Change of Use: From
Commercial to Apart
Hotel
Location:
Project Type:
RIBA Stages 0 to 3
Bromley,
London, UK
Professional
Collaborative
Softwares Used:
Drawing MicroStation
Modelling SketchUp
Visualization Photoshop
Design&Access Statement Indesign
This poject in Penge, Bromley, is a four-storey commercial
building which comprises of two shops and office space
above on the first, second and third floor.
However this area has been converted into residential
accommodation over the past decade without formal
approval.
The proposed development is for the change of use of the
building into a Part Hotel due to its strategic location at
the High Street.
For this project I collaborated in the design stage of the
proeject and I was responsible of the elaboration of
planning drawings, and Design and Access Statement and
visuals.
RIBA Stage 1/2
-Measured Survey
-Drawing the existing and proposed plans
RIBA Stage 3
-Creation of full set of drawings and documents for
submission to local authority
Proposed Elevation
04
Two storey side extension,
Rear extension and Loft
Conversion
Location:
Project Type:
RIBA Stages 2 - 4
Softwares Used:
Drawing Microstation
Cheam, Sutton,
London UK
Professional
Collaborative
The project consisted on a two storey side extension and a
Lof convertion so have a master suite.
For the Plannin stage, a PD application for the loft and
Householder application for the side and rear extension
was required.
I join the team shortly after the client made their final
desision on the design proposal. I collaborated with
some sections and the elaboration of the Building Cotrol
Drawing Pack. The project is under construction and I am
undertaking site visits with my team.
RIBA Stage 2
-Drawing section and elevations of proposed plans
RIBA Stage 4
-Preparation of technical drawings and submission of a
building control application
Technical Drawings for Building Control
05
House Extension
and Refurbishment
Location:
Project Type:
RIBA Stages 1 to 5
Softwares Used:
Drawing AutoCad
Modelling Rhino
Rendering Enscape
Northwood,
Hertfordshire, UK
Professional
Collaborative
The project consisted on the modification of the existing
mock Tudor facade to a more modern design, enclosuring
of the front porch, rear extension, and refurbishment of
both the ground floor and loft. The primary objective
was to enhance the aesthetic appeal and functionality
of the property while adhering to the client’s specific
requirements.
The team responsible for the development of the project
consisted of three people; my roles and tasks in this team
were the following:
RIBA Stage 1/2
-Measured Survey
-Drawing the existing and proposed plans
-3D model
Internal views: Hall, Landing and Loft
RIBA Stage 3
-Creation of full set of drawings and documents for
submission to local authority
RIBA Stage 4
-Preparation of technical drawings and submission of a
building control application
RIBA Stage 5
-Site visits during construction stage
E
A
Canopy above
6047
New Glazing
C
1
NEW M.H.
NEW
SVP
EXISTING
R.W.P
Bar
Electric Fire Place
with TV on top
Verandah
SVP
FD30S
Coats
EXISTING
M.H.
12702
E
2
Smoke
alarm
VOID ABOVE
EXTRACTOR FANS TO
HAVE MIN 85M3/HR AND
AUTOMATIC OVERRUN
B.I.G.
WC
1.1m x 1.6m
Shower
1.1m x 0.9m
Window enlarged
FD30S
Window enlarged
1000
Heat Smoke
Detector alarm
Kitchen
950 1100
2500
1200
Roof light above
Breakfast room
Window blocked
F.R
F.R
Double
oven
Pantry
Wine
5.47m x 2.8m
B.I.G.
SVP
Utility
3.0m x 4.0m
Boiler, Megaflo,
Water softener
WM
TD
C
3
EXISTING
M.H.
Window enlarged
NEW
R.W.P
Window blocked
3000
B
NEW
SVP
Desk/
Table
Living Room
4.6m x 8.6m
Chaise Lounge
Desk/
Table
EXISTING
R.W.P
SVP
1012
Seating/
Shoes
TO EXISTING
M.H.
PROPOSED GROUND FLOOR
UP
1503
Entrance
Hall
4.0m x 8.3m
Smoke
alarm
Enclosed Porch
UP
4570
ENTRANCE
Console
& mirror
D
Seating/
Shoes
New Glazing
D
EXISTING
R.W.P
Dining room
5.7m x 9.5m
Electric Fire Place
with TV on top
FD30S
New Window
PROJECT DWG NO. SCALE DETAIL
27.01.2023 27.02.2023 A-01.02.2023 B-09.02.2023 B-17.02.2023 C-28.02.2023 06.03.2023 PROJECT NO.
1C DEVENHAM AVENUE, NORTHWOOD, HA6 3HW
BUILDING REGULATIONS
09
1:50
@ A2
PROPOSED GROUD FLOOR PLAN
ISSUED FOR
DISCUSSION
10.03.2023
SUBMITTED TO
B.CONTROL
ISSUED FOR
DISCUSSION
29.03.2023
SUBMITTED TO
PLANNING
ISSUED FOR
DISCUSSION
ISSUED FOR
DISCUSSION
ISSUED FOR
DISCUSSION
ISSUED FOR
DISCUSSION
ISSUED FOR
DISCUSSION
Office 1
3.0m x 2.2m
F
Office 2
3.0m x 2.2m
F
N
0m
22.30
SVP
EXISTING
M.H.
Window blocked
EXISTING
R.W.P
1m
1
2m
3m
4m
120, Pinner Road, Harrow, HA1 4JD.
Tel: 0208 357 2304
5m
P R A r c h i t e c t u r e l t d.
C h a r t e r e d A r c h i t e c t
ROOF
+10022
ROOF
+10022
2323
LOFT
+6350
2323
LOFT
+6350
3000 2700
1ST FL
+3400
3000 2700
1ST FL
+3400
GRD FL
+150
GRD FL
+150
PROPOSED FRONT ELEVATION
PROPOSED REAR ELEVATION
ROOF
+10022
ROOF
+10022
2323
LOFT
+6350
2323
LOFT
+6350
3000 2700
1ST FL
+3400
3000 2700
1ST FL
+3400
GRD FL
+150
GRD FL
+150
PROPOSED SIDE ELEVATION
PROPOSED SIDE ELEVATION
0m
1m
2m
3m
4m
5m
PROJECT DWG NO. SCALE DETAIL
27.01.2023 27.02.2023 A-01.02.2023 B-09.02.2023 B-17.02.2023 C-28.02.2023 06.03.2023 PROJECT NO.
1C DEVENHAM AVENUE, NORTHWOOD, HA6 3HW
BUILDING REGULATIONS
16
1:100
@ A2
PROPOSED ELEVATIONS
ISSUED FOR
DISCUSSION
10.03.2023
SUBMITTED TO
B.CONTROL
ISSUED FOR
DISCUSSION
30.03.2023
SUBMITTED TO
PLANNING
ISSUED FOR
DISCUSSION
ISSUED FOR
DISCUSSION
ISSUED FOR
DISCUSSION
ISSUED FOR
DISCUSSION
ISSUED FOR
DISCUSSION
22.30
P R A r c h i t e c t u r e l t d.
C h a r t e r e d A r c h i t e c t
120, Pinner Road, Harrow, HA1 4JD.
Tel: 0208 357 2304
ROOF
+10022
Loft
Storage
2323
LOFT
+6350
Library
3000 2700
1ST FL
+3400
EPDM rubber roof
Verendah
SECTION A
Scale 1:100
Entrance Hall
GRD FL
+150
Existing floor
Lead flashing
OSB3 board
150mm Kingspan TR24
Vapour control layer
Beam as per structural
engineer details
Floor finish as specified
75 mm screed with fibre reinforcement
ROOF
+10022
100mm insulation as specified
25mm Kingspan Kooltherm K3
board perimeter insulation upstand
DPM turned up back face of brick
riser to lap with DPC
Games Room
Bar Area
2323
LOFT
+6350
Existing floor
Ground floor
0.00
Bath
Bedroom 2
Bedroom 1
Living Room Entrance Hall Dining Room Office 1
SECTION B
18
1:100
@ A2
Bath
PROPOSED SECTIONS
3000 2700
1ST FL
+3400
GRD FL
+150
200 mm Concrete slab
50 mm weightened sand
Vapour barrier of 1200g
poly sheet
PROJECT DWG NO. SCALE DETAIL
27.01.2023 27.02.2023 A-01.02.2023 B-09.02.2023 B-17.02.2023 C-28.02.2023 06.03.2023 PROJECT NO.
1C DEVENHAM AVENUE, NORTHWOOD, HA6 3HW
BUILDING REGULATIONS
Scale 1:100
ISSUED FOR
DISCUSSION
10.03.2023
SUBMITTED TO
B.CONTROL
ISSUED FOR
DISCUSSION
30.03.2023
SUBMITTED TO
PLANNING
Blinding
Hardcore
Subsoil
ISSUED FOR
DISCUSSION
ISSUED FOR
DISCUSSION
SECTION C
Scale 1:25
ISSUED FOR
DISCUSSION
ISSUED FOR
DISCUSSION
ISSUED FOR
DISCUSSION
22.30
New foundation
N
Engineering/semi
engineering bricks
New foundation as
per engineer details.
0m 0.5m 1m
2m
P R A r c h i t e c t u r e l t d.
C h a r t e r e d A r c h i t e c t
120, Pinner Road, Harrow, HA1 4JD.
Tel: 0208 357 2304
boiler
boiler
boiler
boiler
overhead balcony
overhead balcony
pipe
pipe
fuses and switchgear
fuses and switchgear
boiler
boiler
boiler
boiler
overhead balcony
overhead balcony
pipe
pipe
fuses and switchgear
fuses and switchgear
D'
E'
F'
06
Rear House
Extension with
Swimming pool
C
C
D'
GARAGE
E'
OFFICE
F'
C'
C'
OFFICE
LIVING ROOM
PATIO
Location:
Project Type:
RIBA Stages 1 to 4
Softwares Used:
Drawing AutoCad
Three Rivers,
Hertfordshire, UK
Professional
Collaborative
B
UTILITY
ROOM
KITCHEN
DINING ROOM
GARAGE
HALL
B
LIVING ROOM
LIVING ROOM
UTILITY
ROOM
PATIO
KITCHEN
DINING ROOM
HALL
LIVING ROOM
B'
B'
A
ENTRANCE
A'
A
ENTRANCE
EXISTING GROUND FLOOR
D
D'
A'
E
E'
F
F'
The project encompasses two distinct phases: the first
phase involves the conversion of a garage into Ca habitable
room, while the second phase entails a rear extension
featuring a basement, terrace, and swimming pool.
The team responsible for the development of the project
consisted of three people; my role and tasks in this team
were the following:
RIBA Stage 1
-Site visit and measured survey and existing plans
-Photographic record
RIBA Stage 2
-Proposed design
RIBA Stage 3
-Creation of full set of drawings and documents for
submission to local authority
B
EXISTING GROUND FLOOR
RIBA Stage 4
PROPOSED GROUND FLOOR
BUILDING REGULATIONS
-Preparation of technical drawings and submission of a
DETAIL
building control application 1 TEMPLE GARDENS, RICKMANWORTH, WD3 1QJ
1:100
-Revising plans, elevations and sections that require
201
BUILDING REGULATIONS
@ A1
modification based on the updated design information
-Coordinating proposed plans with topographic plans
UTILITY
ROOM
ENTRANCE
KITCHEN
DINING ROOM
NEW
HABITABLE
ROOM
HALL
C
OFFICE
B
A
LIVING ROOM
LIVING ROOM
UTILITY
ROOM
DN
DN
D
ENTRANCE
KITCHEN
PATIO
DINING ROOM
NEW
HABITABLE
ROOM
HALL
ENTRANCE
PROPOSED GROUND FLOOR
DN
A
PROJECT ENTRANCE
DWG NO. SCALE DETAIL
11.04.2023 21.04.2023 A' 24.04.2023 16.05.2023 30.06.2023
PROJECT NO.
0m
5m 10m 15m
1 TEMPLE GARDENS, RICKMANWORTH, WD3 1QJ
EXISTING AND PROPOSED
SUBMITTED TO ISSUED FOR ISSUED FOR BR QUERIES ISSUED FOR
1:100
01
GROUND FLOOR
THREE RIVERS DISCUSSION DISCUSSION TO BUILDING DISCUSSION
2
D
E
F
23.12
BUILDING
CONTROL
@ A1
PROJECT DWG NO. SCALE 11.04.2023 21.04.2023 24.04.2023 16.05.2023 30.06.2023 CONTROL
PROJECT NO.
EXISTING AND PROPOSED
GROUND FLOOR
SUBMITTED TO
THREE RIVERS
BUILDING
CONTROL
D'
ISSUED FOR
DISCUSSION
ISSUED FOR
DISCUSSION
E
E'
POOL
OFFICE
BR QUERIES
TO BUILDING
CONTROL
LIVING ROOM
LIVING ROOM
ISSUED FOR
DISCUSSION
DN
PATIO
DN
D
F
F'
PATIO
DN
C'
B'
N
23.12
E
POOL
PATIO
Existing and Proposed Ground Floor Plan
P R A r c h i t e c t u r e l t d.
C h a r t e r e d A r c h i t e c t
120, Pinner Road, Harrow, HA1 4JD.
Tel: 0208 357 2304
F
C'
B'
A'
N
0m
P R
111.22
111.25
110.90
111.40
111.28 111.15 111.04
110.72 110.63
110.31
109.80
109.25
109.01
111.40
111.28 111.15 111.04
110.72 110.63
110.31
109.80
footpath
109.25
109.01
3600
PATIO LEVEL
108.20
108.20
EXISTING SECTION A-A'
107.50
107.15
PROPOSED SECTION A-A'
107.50
525
107.15
bedroom
bedroom
bedroom
bedroom
bedroom
bath
bedroom
bedroom
bath
bedroom
Solid concrete roof with insulation
111.22
111.33 111.30
utility dining room
room
hall
living room
111.25
111.48 111.40
111.22
111.33 111.30
utility dining room
room
hall
living room
111.48 111.40
terrace
Paving slabs
Cavity wall
Ground to be removed
110.02
109.75
109.48
109.10
110.02
109.75
swimming pool
3000
109.48
patio
109.10
107.40 107.07
107.40 107.07
EXISTING SECTION B-B'
PROPOSED SECTION B-B'
Floor with concrete slab and insulation
108.90
109.13
109.60
109.84 109.80
110.67
110.81 110.84 110.90 110.93
111.14 111 111.05
PATIO LEVEL 111.14 111 111.05
110.81 110.84 110.90 110.93
110.67
Ground to be removed
footpath 109.84 109.80
109.60
109.13
108.90
106.89
107.22
EXISTING SECTION C-C'
106.89
107.22
PROPOSED SECTION C-C'
0m
5m 10m 15m
0m
5m 10m 15m
PROJECT DWG NO. SCALE DETAIL
11.04.2023 21.04.2023 24.04.2023 16.05.2023 30.06.2023
PROJECT NO.
1 TEMPLE GARDENS, RICKMANWORTH, WD3 1QJ
BUILDING REGULATIONS
202
1:100
@ A1
EXISTING ELEVATIONS
SUBMITTED TO
THREE RIVERS
BUILDING
CONTROL
ISSUED FOR
DISCUSSION
ISSUED FOR
DISCUSSION
BR QUERIES
TO BUILDING
CONTROL
ISSUED FOR
DISCUSSION
23.12
P R A r c h i t e c t u r e l t d.
C h a r t e r e d A r c h i t e c t
120, Pinner Road, Harrow, HA1 4JD.
Tel: 0208 357 2304
PROJECT DWG NO. SCALE DETAIL
11.04.2023 21.04.2023 24.04.2023 16.05.2023 30.06.2023
PROJECT NO.
1 TEMPLE GARDENS, RICKMANWORTH, WD3 1QJ
BUILDING REGULATIONS
204
1:100
@ A1
PROPOSED ELEVATIONS
SUBMITTED TO
THREE RIVERS
BUILDING
CONTROL
ISSUED FOR
DISCUSSION
ISSUED FOR
DISCUSSION
BR QUERIES
TO BUILDING
CONTROL
ISSUED FOR
DISCUSSION
23.12
P R A r c h i t e c t u r e l t d.
C h a r t e r e d A r c h i t e c t
120, Pinner Road, Harrow, HA1 4JD.
Tel: 0208 357 2304
ROOF
ROOF
2370
LOFT
107.85
108.07
109.46
110.70
footpath
109.80
patio
footpath
110.97 110.84 110.79 110.74
110.50
110.28 110.20
109.80
108.60
2560 2460
1ST FL
GRD FL
2560 2460
105
105.51
106.43
105.58
106.60
106.04
EXISTING SECTION D-D'
ROOF
ROOF
2370
LOFT
107.85
109.46
108.07
107.65
footpath
110.70
109.80
109
patio
footpath
110.97 110.84 110.79 110.74
110.50
110.28 110.20
109.75 109.79
109.80
109.64
109.41
109.57
108.60
108.51
108.30
2560 2460
1ST FL
GRD FL
105
105.51
104.84
106.43
105.58
105.56
106.60
106.04
105.77
106.07
EXISTING SECTION E-E
ROOF
ROOF
2370
2370
2370
2370
LOFT
107.85
108.07
109.46
footpath
art gallery
Ground to be removed
terrace
footpath
110.70
110.97 110.84 110.79 110.74
110.50
110.28 110.20
109.80
109.80
108.60
3064
1ST FL
GRD FL
LOWER GRD FL
105
105.51
106.43
105.58
106.60
106.04
PROPOSED SECTION D-D'
LOFT
107.85
109.46
108.07
107.65
footpath
110.70
109.80
109
terrace
footpath
110.97 110.84 110.79 110.74
110.50
110.28 110.20
109.75 109.79
109.80
109.64
109.41
109.57
swimming pool
108.51 108.60
108.30
2560 2460
3064
1ST FL
GRD FL
LOWER GRD FL
105
105.51
104.84
106.43
105.58
105.56
106.60
106.04
105.77
106.07
Ground to be removed
PROPOSED SECTION E-E
LOFT
LOFT
107.85
109.46
108.07
107.65
footpath
110.70
109.80
109
107.15
footpath
110.97 110.84 110.79 110.74
110.50
110.28 110.20
109.75 109.79
109.64
109.80
109.41
109.57
108.51 108.60
108.30
107.57
107.40 107.27 107.19 107.22 107.27 107.38
2560 2460
1ST FL
GRD FL
107.85
109.46
108.07
107.65
footpath
110.70
109.80
109
107.15
110.97 110.84 110.79 110.74
110.50
109.80
109.41
109.57
108.51 108.60
107.57
patio
footpath
108.30
107.40 107.38
107.27 107.19 107.22 107.27
2560 2460
3061
1ST FL
GRD FL
LOWER GRD FL
105
105.51
104.84
106.43
105.58
106.60
106.04
105.77
105.56
105.42
106.07
105.93
EXISTING SECTION F-F'
105
105.51
104.84
106.43
105.58
106.60
106.04
105.77
105.56
105.42
106.07
105.93
PROPOSED SECTION F-F'
0m
5m 10m 15m
0m
5m 10m 15m
PROJECT DWG NO. SCALE DETAIL
11.04.2023 21.04.2023 24.04.2023 16.05.2023 30.06.2023
PROJECT NO.
1 TEMPLE GARDENS, RICKMANWORTH, WD3 1QJ
BUILDING REGULATIONS
203
1:100
@ A1
EXISTING ELEVATIONS
SUBMITTED TO
THREE RIVERS
BUILDING
CONTROL
ISSUED FOR
DISCUSSION
ISSUED FOR
DISCUSSION
BR QUERIES
TO BUILDING
CONTROL
ISSUED FOR
DISCUSSION
23.12
P R A r c h i t e c t u r e l t d.
C h a r t e r e d A r c h i t e c t
120, Pinner Road, Harrow, HA1 4JD.
Tel: 0208 357 2304
PROJECT DWG NO. SCALE DETAIL
11.04.2023 21.04.2023 24.04.2023 16.05.2023 30.06.2023
PROJECT NO.
1 TEMPLE GARDENS, RICKMANWORTH, WD3 1QJ
BUILDING REGULATIONS
205
1:100
@ A1
PROPOSED ELEVATIONS
SUBMITTED TO
THREE RIVERS
BUILDING
CONTROL
ISSUED FOR
DISCUSSION
ISSUED FOR
DISCUSSION
BR QUERIES
TO BUILDING
CONTROL
ISSUED FOR
DISCUSSION
23.12
P R A r c h i t e c t u r e l t d.
C h a r t e r e d A r c h i t e c t
120, Pinner Road, Harrow, HA1 4JD.
Tel: 0208 357 2304
Extracurricular
07Interests
Making architecture inspired in random objects
PHOTOGRAPHY
COOKING