4 Final Report - Emits - ESA
4 Final Report - Emits - ESA 4 Final Report - Emits - ESA
CR Final Change Record Report Issue Revision Date Sheet Description of Change 1 28.01.2009 All First version 2 13.05.2009 Consideration of ESA comments: 2-1, 5-87 Reference to GMES 2-2 Reference to S-2 and S-3 3-20 SSD units changed from km to m 3-23 Description of cloud cover change 4-27 Figure 4.1-1 repaired 4-29 Explanation of versions a and b of MWIR/TIR channels 4-32 Explanation of columns 6 and 7 of Figure 4.3-3 4-53 Additional information on data rate 4-53 Information on TRL of downlink system 4-56 Impact of small mobile stations on downlink system 4-58 Comment on active damping of flexible modes 4-60 to 62 Probability level of pointing performance 4-63, 4-65 Units for manoeuvre times added in tables 4-80 Information on alternative decentralised PDGS 5-87 New section added Doc. No: GOC-ASG-RP-002 Page iii Issue: 2 Date: 13.05.2009 Astrium GmbH
- Page 1: Geo-Oculus: A Mission for Real-Time
- Page 7: DL Final Distribution List Report Q
- Page 12 and 13: TOC Final Report 5 Recommendations
- Page 14 and 15: 1 Final Revisit Capability [min] 10
- Page 17 and 18: 2 Final Report 2 Product and Missio
- Page 19 and 20: 2 Final Report 2.3 Mission Objectiv
- Page 21 and 22: 2 Final Report 15 min. These requir
- Page 23 and 24: 2 Final Report Figure 2.3-5: Algal
- Page 25 and 26: 2 Final Report Figure 2.3-7: Turbid
- Page 27 and 28: 2 Final Report Figure 2.3-10: Wadde
- Page 29 and 30: 3 Final Report Table 3.1-1: Geo-Ocu
- Page 31 and 32: 3 Final Report marine fire disaster
- Page 33 and 34: 3 Final Report Ground Segment Requi
- Page 35 and 36: 3 Final Report Effective Coverage 1
- Page 37 and 38: 3 Final Report Fire 2° Manoeuvre F
- Page 39 and 40: 3 Final Report Referring to these d
- Page 41 and 42: 3 Final Report ground coverage can
- Page 43 and 44: 4 Final Report 4 Mission and System
- Page 45 and 46: 4 Final Report compared to a strate
- Page 47 and 48: 4 Final Report FoV (300/157 = 1.9),
- Page 49 and 50: 4 Final Report 4.3.3 Instrument des
- Page 51 and 52: 4 Final Report sub-block has16 vide
- Page 53 and 54: 4 Final Report Microbolometers meas
- Page 55 and 56: 4 Final Report VNIR imaging, where
- Page 57 and 58: 4 Final Report 4.3.3.8 Calibration
CR <strong>Final</strong><br />
Change Record<br />
<strong>Report</strong><br />
Issue Revision Date Sheet Description of Change<br />
1 28.01.2009 All First version<br />
2 13.05.2009 Consideration of <strong>ESA</strong> comments:<br />
2-1, 5-87 Reference to GMES<br />
2-2 Reference to S-2 and S-3<br />
3-20 SSD units changed from km to m<br />
3-23 Description of cloud cover change<br />
4-27 Figure 4.1-1 repaired<br />
4-29 Explanation of versions a and b of MWIR/TIR channels<br />
4-32 Explanation of columns 6 and 7 of Figure 4.3-3<br />
4-53 Additional information on data rate<br />
4-53 Information on TRL of downlink system<br />
4-56 Impact of small mobile stations on downlink system<br />
4-58 Comment on active damping of flexible modes<br />
4-60 to 62 Probability level of pointing performance<br />
4-63, 4-65 Units for manoeuvre times added in tables<br />
4-80 Information on alternative decentralised PDGS<br />
5-87 New section added<br />
Doc. No: GOC-ASG-RP-002 Page iii<br />
Issue: 2<br />
Date: 13.05.2009 Astrium GmbH