04.03.2024 Views

Nimbus Compact M NET R32 Installation Manual UK

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Commissioning<br />

1.12 TEST & UTILITIES<br />

1.12.0 Air-purge function<br />

Activates deaeration of the system; the operation can last up<br />

to 18 minutes.<br />

Press the selector . Turn the selector to choose the desired<br />

item.<br />

0 OFF.<br />

1 ON.<br />

Press the selector to confirm.<br />

1.12.1 Antiblocking function enable<br />

Activates the anti-lock function of the primary circulation<br />

pump.<br />

The circulation pump is activated for 30 seconds every 23 hours<br />

of inactivity and the diverter valve is set to DWH production.<br />

Press the selector . Turn the selector to choose the desired<br />

item.<br />

0 OFF.<br />

1 ON.<br />

Press the selector to confirm.<br />

1.12.2 Quiet mode activation HHP<br />

Press the selector . Turn the selector to choose the desired<br />

item.<br />

0 OFF (reduces the heat pump noise level).<br />

1 ON<br />

Press the selector to confirm.<br />

1.12.3 Quiet mode start time HHP [hh:mm]<br />

Press the selector . Turn the selector to choose the desired<br />

item.<br />

Press the selector to confirm.<br />

1.12.4 Quiet mode end time HHP [hh:mm]<br />

Press the selector . Turn the selector to choose the desired<br />

item.<br />

Press the selector to confirm.<br />

1.12.5 Floor drying cycle<br />

Defines the screed drying programme for under-floor systems<br />

using the following values:<br />

Press the selector . Turn the selector to choose the desired<br />

item.<br />

0 OFF.<br />

1 Functional Heating (screed heating at a fixed temperature<br />

of 25°C for 3 days, then at the temperature defined by Par<br />

1.12.6 Floor drying Flow Set Point T).<br />

Temperature °C<br />

60<br />

50<br />

40<br />

30<br />

20<br />

10<br />

0<br />

0 1 2 3 4 5 6 7 8 9<br />

Period (days)<br />

Fig. 86<br />

2 Curing Heating (screed heating at a variable temperature<br />

from 25°C to the temperature defined by Par. 1.12.6 Floor<br />

drying Flow Set Point T, according to the period specified<br />

as an example in the chart for an 18-day period)<br />

Temperature °C<br />

60<br />

40<br />

20<br />

set point 55°C set point 40°C<br />

0<br />

0 2 4 6 8 10 12 14 16 18 20<br />

Period (days)<br />

Fig. 87<br />

3 Functional Heating + Curing Heating (screed heating at a<br />

fixed temperature of 25°C for 3 days, then for a further 4<br />

days at the temperature defined by Par. 1.12.6 Floor drying<br />

Flow Set Point T, then at a variable temperature from 25°C<br />

to the temperature defined by Par. 1.12.6 Floor drying Flow<br />

Set Point T, according to the period specified as an example<br />

in the chart for an 18-day period)<br />

Temperature °C<br />

80<br />

60<br />

40<br />

20<br />

set point 55°C set point 60°C<br />

0<br />

0 5 10 15 20 25 30<br />

Period (days)<br />

Fig. 88<br />

EN / 55

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!